Pool Permit in Arlington, Texas
It depends
Sometimes, depending on the project
Before constructing or erecting any swimming pool, spa or splashpad, in-ground or above-ground. A separate Fence Permit of type Pool Barrier is required if any part of the pool barrier has to be constructed.
Quick answer
Arlington requires separate permits for the construction of swimming pools, spas and splashpads, and the only permit exemption the city publishes is for prefabricated inflatable swimming pools that are less than 24 inches deep. In-ground pool submittals must include a site plan stamped by ONCOR Electric Delivery showing all easements and dimensioning the pool and deck from property lines, lot grading plans with surface drains and discharge locations, suction entrapment avoidance details, and pool barrier details. Above-ground pools more than 4 feet in height also need an Oncor-stamped site plan. Electrical and plumbing work on the pool must be performed by licensed contractors registered with the city, who may only take out no-charge "Work with a building permit" trade permits after the pool contractor's building permit has been issued.
- Typical threshold
- depth of a prefabricated inflatable swimming pool
- Issued by
- City of Arlington Planning and Development Services Department, Building Inspections Division
- Phone
- 817-459-6502
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.
Compare pool builder quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a pool permit costs in Arlington
- Fee schedule in force
- Official scheduleRead .
- Published in
- Planning and Development Services Fee Schedule, Effective October 1, 2026, Resolution No. 26 - 288, Residential Construction:
- "Swimming Pool - In-ground (1 & 2 Family) (Spa included)* $325.00 each";
- "Swimming Pool - Above-ground (1 & 2 Family)* $200.00";
- "Spa Gunite In-ground (1 & 2 Family) $65.00";
- "Spa Storable (1 & 2 Family) $50.00";
- "Fence, Swimming Pool Barrier $50.00".
- The Electrical section adds "Hot-tubs, Spas, and Swimming Pools (above and below ground)- No Charge $0.00".
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Arlington compares in Texas
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Arlingtonthis page | It depends | depth of a prefabricated inflatable swimming pool |
| Austin | It depends | prefabricated pools less than 24 inches deep are exempt; all other residential pools require a permit |
| Corpus Christi | It depends | Every in-ground pool needs a permit; an above-ground pool needs one once it holds more than 5,000 gallons or is more than 24 inches deep, and prefabricated pools under both figures are on the city's published exemption list. |
| Dallas | It depends | prefabricated pools accessory to single-family or duplex premises are exempt when the pool wall is completely above adjacent grade, the capacity does not exceed 5,000 gallons, and the pool depth is less than 24 inches |
| El Paso | It depends | Pools and ponds over 24 inches of depth require a permit, as do above ground pools containing 5,000 gallons of water or more. |
| Lubbock | It depends | The permit threshold for a pool or spa is 24 inches of depth; a circulation system, or not being drained on a daily basis, are two separate alternative triggers. |
| Plano | It depends | depth of a prefabricated swimming pool |
How to apply in Arlington
General guide, not specific to this office
What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Arlington Planning and Development Services Department, Building Inspections Division
- City Hall, 101 W. Abram St., 2nd Floor, Arlington, TX 76010
- Phone: 817-459-6502
- Email: planningdevelopment@arlingtontx.gov
Your Pool Permit checklist for Arlington
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: depth of a prefabricated inflatable swimming pool. Read the rule where we read it: arlingtontx.gov: Permitting Inspections.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Arlington permit portal.
- Keep the office details handy. City of Arlington Planning and Development Services Department, Building Inspections Division. Phone: 817-459-6502. Email: planningdevelopment@arlingtontx.gov. Address: City Hall, 101 W. Abram St., 2nd Floor, Arlington, TX 76010.
Compiled from the official sources on this page. Last checked .
Permitting activity in Arlington
In 2025, Arlington authorized permits for 1,576 new residential housing units (532 single-family, 1,044 in multi-family buildings), valued at $229M, down from 1,703 the year before. That works out to about 4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 398,864.
What else needs a permit in Arlington
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | height of an uncovered deck above grade at any point | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | share of one side of an existing fence being repaired or replaced | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | height of an uncovered patio above grade at any point | See schedule |
| Plumbing Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | It depends | area of roof covering material being replaced | Planning and Development Services Fee Schedule, Effective October 1, 2026, Resolution No. 26 - 288, Residential Construction: "Reroof* $325.00" |
| Shed Permit | It depends | floor area of a one-story detached tool or storage shed | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a pool permit in Arlington?
- It depends on the project. Depth of a prefabricated inflatable swimming pool. If you are unsure how that applies to your project, call the permit office at 817-459-6502 before you start.
- How much does a pool permit cost in Arlington?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 817-459-6502.
- How long does a pool permit take in Arlington?
- Development Services aims to review submitted plans and provide a response within five (5) working days from the date your application has been accepted. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a pool permit in Arlington?
- You can apply through the Arlington permit portal or contact the City of Arlington Planning and Development Services Department, Building Inspections Division directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Arlington?
- Under Texas law (Tex. Occupations Code 1305.003(a)(6), 1301.051; Tex. Local Government Code 233.157(c)): Texas licenses individual construction trades rather than general contractors, so no state statute requires a license to act as your own general contractor on your own house. For electrical work, the state licensing law does not apply to work performed in or on a dwelling by a person who owns and resides in it, but only where no municipal ordinance specifically regulates that work, so city electrical licensing and permit rules still control inside city limits (Occupations Code 1305.003(a)(6)). For plumbing, a property owner does not need a state license to perform plumbing in the owner's homestead (Occupations Code 1301.051). In opt-in counties' unincorporated areas, an individual who builds their own house or acts as their own contractor is exempt from the Class C misdemeanor penalty for inspection notice failures if they intend to use the home as their primary residence (Local Government Code 233.157(c)). None of these exemptions waive local permit or inspection requirements where they apply. Confirm how Arlington applies this before you apply.
From the Library
Pool Permit in other Texas localities
Everything above, sourced
How this pool permit page for Arlington was verified. 2 official sources: arlingtontx.gov, arlingtontx.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Arlington Planning and Development Services Department, Building Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page