Texas

Building permits in Arlington, Texas

Verified against official sources

Of the 10 common home projects we have verified in Arlington, 4 need a permit outright and 6 depend on size or scope. Click any project for the full rule, fee, and how to apply.

Project types verified
10in Arlington

Look up a permit in Arlington

Arlington permit records are public, and you can check a property's permit history by address online.

How to search Arlington permit records

How to get a building permit in Arlington

The City of Arlington’s Planning and Development Services Department issues building and trade permits for work in Arlington. Every application is online at ArlingtonPermits.com, available 24/7, where you can also upload plans and request inspections.

Where the office is and when it is open

Planning and Development Services is at City Hall, 101 W. Abram Street, 2nd floor, Arlington, TX 76010, open Monday to Friday, 8:00 a.m. to 5:00 p.m. Call 817-459-6502 or email planningdevelopment@arlingtontx.gov; plan questions go to PlansExam@arlingtontx.gov. The city does not say whether a counter visit needs an appointment.

Applying online in Arlington

  1. Open ArlingtonPermits.com and sign in; the site handles registration, permitting, inspections and electronic payments. The owner, a contractor or an authorized agent can apply.
  2. Pick the application for your job. All applications are online, and digital plans can be uploaded with them.
  3. Attach what the city names for your job: a reroof needs the application, a site plan and a re-roof worksheet; a fence needs a site plan showing where the fence will go.
  4. If you hire a contractor, the contractor must be registered as a business with the city to pull the permit.
  5. Pay online, then post the issued permit at the job site before work starts.

What five common projects cost here

From the Planning and Development Services Fee Schedule, Effective October 1, 2026 (Resolution No. 26 - 288).

  • Electrical: $100.00 per trade on a new construction permit; work not tied to a building permit pays a $100.00 base fee plus items such as $35.00 for a service or sub panel up to 200 amps, $60.00 over 200 up to 400 amps, and $30.00 per EV charging station. Pool and spa electrical is $0.00. Read 18 Nov 2026.
  • Plumbing: $100.00 per trade on a new construction permit; work not tied to a building permit pays a $100.00 base fee plus items such as $20.00 for the first water heater, $40.00 for the first three new fixtures (then $15.00 each), and $30.00 for the first five replacement fixtures plus $7.50 each after, capped at $600.00 per building address for replacements. Read 18 Nov 2026.
  • Fence: residential lot fence $50.00 each; pool barrier fence $50.00. Read 16 Nov 2026.
  • Pool: in-ground pool (spa included) $325.00 each; above-ground pool $200.00; barrier fence $50.00. Both pool lines carry the schedule’s asterisk: a non-refundable plan review fee of 35% of the building permit fee, due when you submit. Read 18 Nov 2026.
  • Roof replacement: reroof $325.00, plus the non-refundable plan review fee at 35% of the building permit fee, paid at submittal. A permit is required unless the replacement area is 10 percent or less of the roof. Read 18 Nov 2026.

How long review takes

Arlington posts no plan-review target, and its fee schedule treats an application as received only once the plan review fee is paid; follow the record on ArlingtonPermits.com or ask PlansExam@arlingtontx.gov.

Inspections, in order

The city’s rule is an inspection before any work is covered and one at completion. ArlingtonPermits.com groups inspections in phases and marks each required one with a red asterisk; the next phase appears only after those pass, so the system shows you the order. To request one, log in, find your permit under My Unscheduled Inspections, and request the inspection. Requests received before 7:00 a.m. are done the same day; later ones go to the next working day. The residential fee table also lists a Same Day Inspection charge of $200.00, read 18 Nov 2026, without saying how it relates to that rule; ask 817-459-6502.

For a reroof with insulation above the deck, an insulation inspection is required before the insulation is covered. The final inspection checks layers, attic vents and flashing; you can skip the attic check by uploading the signed, notarized “Certificate of Final Roof Inspection” when you request the final. Failed items must be corrected before you request the next inspection, and the reinspection fee is $200.00.

What needs no permit in Arlington

  • One-story detached tool or storage sheds of 100 square feet or less (one- and two-family homes).
  • Uncovered decks or patios 30 inches or less above grade, subject to setback and drainage limits.
  • Prefabricated inflatable pools less than 24 inches deep.
  • Repairing or replacing less than 50 percent of one side of a fence.
  • Finish work such as painting, papering, tiling, carpeting, cabinets and counter tops.
  • Retaining walls not more than 4 feet high, unless supporting a surcharge or in a floodplain.
  • Decorative fences less than 24 inches tall.

If the work already started

The fee schedule adds a penalty for work without a permit equal to the permit fee, on top of the permit fee. When an inspector finds work under way without a permit, the city issues a stop work order, and some work may have to be uncovered and redone. What Texas law says about building without a permit.

Checklist before you apply

  1. An ArlingtonPermits.com account.
  2. The right application for your job, chosen online.
  3. A site plan (fences and reroofs require one).
  4. For a reroof, the re-roof worksheet.
  5. A contractor registered with the City of Arlington, if you hire one.
  6. The fee from the October 1, 2026 schedule, paid online; for a pool or reroof, the non-refundable plan review fee (35% of the building permit fee) at submittal.
  7. Inspection requests before 7:00 a.m. for same-day service.

Arlington documents read for this guide

What needs a permit in Arlington

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of an uncovered deck above grade at any pointSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsshare of one side of an existing fence being repaired or replacedSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsheight of an uncovered patio above grade at any pointSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsdepth of a prefabricated inflatable swimming poolSee schedule
Roof Replacement PermitIt dependsarea of roof covering material being replacedPlanning and Development Services Fee Schedule, Effective October 1, 2026, Resolution No. 26 - 288, Residential Construction: "Reroof* $325.00"
Shed PermitIt dependsfloor area of a one-story detached tool or storage shedSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Planning a project in Arlington?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

Arlington permit fees compared with nearby Texas localities

Texas locality Deck PermitHVAC PermitElectrical Permit
Arlington See schedule See schedule See schedule
Austin Its Small Projects Plan Review fee of $146.15 names garage conversions, carport and porch enclosures; the schedule has the rest See schedule Electrical Base Fee is $183.69 under the Single Family, Duplex, Townhouse; the schedule has the rest
Corpus Christi See schedule Mechanical trade permits: residential $0.075 per square foot; the schedule has the rest Electrical trade permits: residential $0.075 per square foot; the schedule has the rest
Dallas See schedule See schedule See schedule

Each cell is taken from that Texas jurisdiction's own fee schedule; the full wording and source sit on each permit page.

Arlington penalty for work started without a permit

Arlington publishes what it charges when work begins before the permit, quoted here from the schedule or permit page we verified.

  • The same schedule adds "Penalty for Work Without a Permit (in addition to the permit fee charged) Equal to the permit fee."

    Arlington fence permit page · last checked

The Texas statute, the after-the-fact permit path and who may pull the permit: building without a permit in Texas.

Arlington permit questions, answered from the data

Do you need a permit in Arlington?
It depends on the project. Of the 10 permit types we cover in Arlington, 4 always require a permit (for example an electrical permit) and 6 depend on size or scope (a deck permit, for instance). Each Arlington permit type's page states the exact rule and its source.
How much does a permit cost in Arlington?
Arlington publishes a fee for 10 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of Arlington Planning and Development Services Department, Building Inspections Division; we do not estimate or mark them up.
Where do you apply for a permit in Arlington?
City of Arlington Planning and Development Services Department, Building Inspections Division issues permits in Arlington and has an online permit portal, and takes questions at 817-459-6502. The Arlington official page and portal are linked in the office section above.
What is the penalty for building without a permit in Arlington?
Arlington publishes its own charge for work started before the permit: The same schedule adds "Penalty for Work Without a Permit (in addition to the permit fee charged) Equal to the permit fee." That is the local bill; the Texas statute, the after-the-fact permit path and who may pull the permit are on the Texas building-without-a-permit page.

How the Arlington pages were verified. 10 permit types, 8 distinct official sources, most recently checked . Every rule is read from City of Arlington Planning and Development Services Department, Building Inspections Division or the applicable code and cited on its page; anything we could not confirm for Arlington is marked rather than estimated. How we verify.

Permitting activity in Arlington

In 2025, Arlington authorized permits for 1,576 new residential housing units (532 single-family, 1,044 in multi-family buildings), valued at $229M , down from 1,703 the year before. That works out to about 4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 398,864.

From the Library

Other permit offices in Texas