Texas / Arlington

Shed Permit in Arlington, Texas

It depends

Sometimes, depending on the project

Before placing or building any detached storage shed whose floor area exceeds 100 square feet. Sheds over 100 and up to 320 square feet are permitted as a Portable Accessory Structure; sheds of 321 square feet or larger are permitted as a Permanent Accessory Structure.

Confirmed on official page Verified City of Arlington Planning and Development Services Department, Building Inspections Division

By Mario Bailey, verified against official sources

Quick answer

Arlington exempts a one-story detached accessory structure used as a tool and storage shed when the floor area does not exceed 100 square feet. Above that the city's Residential Accessory Structure page states that any other accessory structure, portable or permanent, requires a permit, and splits them into two tiers: sheds greater than 100 square feet but 320 square feet or less are Portable Accessory Structures, while storage sheds of 321 square feet or larger are Permanent Accessory Structures. Structures that include plumbing or mechanical equipment always require a permit regardless of size. Submittals need a dimensioned site plan showing distance to the closest side and rear property lines plus dimensioned elevation views, combined into a single PDF with the address on each page.

Typical threshold: floor area of a one-story detached tool or storage shed.

Diagram of the 100 sq ft footprint area threshold for a shed permit in Arlington, Texas
Threshold illustrated: 100 sq ft. Whether Arlington requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-15.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before placing or building any detached storage shed whose floor area exceeds 100 square feet. Sheds over 100 and up to 320 square feet are permitted as a Portable Accessory Structure; sheds of 321 square feet or larger are permitted as a Permanent Accessory Structure.

What a shed permit costs in Arlington

Line item
shed permitBy formulaPlanning and Development Services Fee Schedule, Effective June 1, 2026, Resolution No. 26 - 151, Residential Construction: "Portable Storage/Accessory Building 320 sq.ft. and under $50.00 each" and "Permanent Storage/Accessory Building over 320 sq.ft.* Based on Valuation - Table 1". The schedule's Construction Permits preamble sets the valuation basis for that Table 1 calculation: "Residential permit fees charged the value of $75.00 per square foot of area shall be used to determine the valuation for the purpose of computing permit fees in accordance with Table 1 for the following permits: Boat Docks, Detached Garages, Permanent Storage/Accessory Buildings (over 320 sq. ft.) and Retaining Walls".
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Arlington compares in Texas

That is the strictest shed permit threshold among the Texas jurisdictions we have verified: Austin, Corpus Christi, Dallas, El Paso, and Lubbock allow up to 200.

JurisdictionPermit needed?Threshold
Arlingtonthis pageIt dependsfloor area of a one-story detached tool or storage shed
AustinIt dependsone-story detached accessory structures used as tool or storage sheds with floor area no greater than 200 sq ft and no more than 15 ft in height and no plumbing and not in a floodplain are exempt
Corpus ChristiIt dependsDetached storage buildings larger than 200 square feet need a building permit; accessory structures 200 square feet or less are on the city's published exemption list.
DallasIt dependsone-story detached utility or storage buildings under 200 sq ft without utilities on single-family or duplex premises are exempt from a permit
El PasoIt dependsThe exemption covers accessory storage buildings or structures of less than 200 square feet of floor area, and is limited to one such accessory structure per site.
HoustonIt dependsone-story detached accessory structure under 120 sq ft does not require a permit
LubbockIt dependsThe building permit threshold for a detached accessory building is 200 square feet of floor area.

Closest shed permit thresholds outside Texas

Jurisdictions we cover whose limit sits nearest Arlington's 100 sq ft.

  • Brevard County, Florida, A permit is required for an accessory structure (shed) over 100 square feet.
  • Cincinnati, Ohio, total floor area of a shed accessory to a one-, two- or three-family dwelling
  • Leon County, Florida, Sheds over 100 square feet in area require a building permit; sheds of any size are still subject to Development Services and Environmental Services review for location, setbacks from boundary lines, easements, and floodplain.
  • Marion County, Florida, The county's shed permit fee category applies to pre-manufactured sheds of 100 square feet and larger

How to apply in Arlington

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of Arlington Planning and Development Services Department, Building Inspections Division sets the exact checklist for Arlington.

Where to apply in Arlington:

City of Arlington Planning and Development Services Department, Building Inspections Division

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Arlington permit portal or by phone at 817-459-6502.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Arlington?
Arlington exempts a one-story detached accessory structure used as a tool and storage shed when the floor area does not exceed 100 square feet. Above that the city's Residential Accessory Structure page states that any other accessory structure, portable or permanent, requires a permit, and splits them into two tiers: sheds greater than 100 square feet but 320 square feet or less are Portable Accessory Structures, while storage sheds of 321 square feet or larger are Permanent Accessory Structures. Structures that include plumbing or mechanical equipment always require a permit regardless of size. Submittals need a dimensioned site plan showing distance to the closest side and rear property lines plus dimensioned elevation views, combined into a single PDF with the address on each page. Floor area of a one-story detached tool or storage shed. Always confirm with the office before starting.
How much does a shed permit cost in Arlington?
Planning and Development Services Fee Schedule, Effective June 1, 2026, Resolution No. 26 - 151, Residential Construction: "Portable Storage/Accessory Building 320 sq.ft. and under $50.00 each" and "Permanent Storage/Accessory Building over 320 sq.ft.* Based on Valuation - Table 1". The schedule's Construction Permits preamble sets the valuation basis for that Table 1 calculation: "Residential permit fees charged the value of $75.00 per square foot of area shall be used to determine the valuation for the purpose of computing permit fees in accordance with Table 1 for the following permits: Boat Docks, Detached Garages, Permanent Storage/Accessory Buildings (over 320 sq. ft.) and Retaining Walls". See the official fee schedule for current amounts.
How long does a shed permit take in Arlington?
Standard application reviews are conducted within 5 business days, provided the submission is complete. If additional reviews are required, they may take up to 2 additional business days. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in Arlington?
You can apply through the Arlington permit portal or contact the City of Arlington Planning and Development Services Department, Building Inspections Division directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Arlington?
Under Texas law (Tex. Occupations Code 1305.003(a)(6), 1301.051; Tex. Local Government Code 233.157(c)): Texas licenses individual construction trades rather than general contractors, so no state statute requires a license to act as your own general contractor on your own house. For electrical work, the state licensing law does not apply to work performed in or on a dwelling by a person who owns and resides in it, but only where no municipal ordinance specifically regulates that work, so city electrical licensing and permit rules still control inside city limits (Occupations Code 1305.003(a)(6)). For plumbing, a property owner does not need a state license to perform plumbing in the owner's homestead (Occupations Code 1301.051). In opt-in counties' unincorporated areas, an individual who builds their own house or acts as their own contractor is exempt from the Class C misdemeanor penalty for inspection notice failures if they intend to use the home as their primary residence (Local Government Code 233.157(c)). None of these exemptions waive local permit or inspection requirements where they apply. Confirm how Arlington applies this before you apply.

From the Library

What else needs a permit in Arlington

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

Planning and Development Services Fee Schedule, Effective June 1, 2026, Resolution No, for every permit type below. The fee column shows what differs by project.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of an uncovered deck above grade at any point26 - 151, Residential Construction: "Patio Cover, Screened Porch, Gazebo & Decks*...
Electrical PermitPermit requiredNot specified26 - 151, Building Permit for Electrical: "Per Trade - Commercial and Residential New...
Fence PermitIt dependsshare of one side of an existing fence being repaired or replaced26 - 151, Residential Construction: "Fence, Residential Lot $50.00 each"
HVAC PermitPermit requiredNot specified26 - 151, Mechanical: "Per Trade - Commercial and Residential New Construction Permits...
Patio PermitIt dependsheight of an uncovered patio above grade at any point26 - 151, Residential Construction: "Patio Cover, Screened Porch, Gazebo & Decks*...
Plumbing PermitPermit requiredNot specified26 - 151, Plumbing Permits: "Per Trade - Commercial and Residential New Construction...
Pool PermitIt dependsdepth of a prefabricated inflatable swimming pool26 - 151, Residential Construction: "Swimming Pool - In-ground (1 & 2 Family) (Spa...
Roof Replacement PermitIt dependsarea of roof covering material being replaced26 - 151, Residential Construction: "Reroof* $325.00".
Solar PermitPermit requiredNot specified26 - 151, Residential Construction: "Solar Panel* $325.00" and "Home Backup Power...

Shed Permit in other Texas localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Arlington documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Arlington Planning and Development Services Department, Building Inspections Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page