Texas / Arlington

Deck Permit in Arlington, Texas

It depends

Sometimes, depending on the project

Before building a deck that is more than 30 inches above grade at any point, and before building any covered or roofed deck structure, which the city treats as a permanent accessory structure.

Quick answer

Arlington exempts an uncovered deck that is 30 inches or less above grade at any point on one- and two-family properties regulated by the International Residential Code. A deck above that height needs a permit, and so does any covered deck or patio cover, which the city classes as a permanent accessory structure requiring a permit regardless of area. Two placement rules apply even to exempt decks: uncovered decks over 12 inches above the average level of the adjoining ground cannot intrude into any building setback or zero lot line maintenance easement, and no deck may re-divert surface water onto adjoining property or impede use of an easement for maintenance.

Diagram of the 30 in above grade deck height above grade threshold for a deck permit in Arlington, Texas
Threshold illustrated: 30 in above grade. Whether Arlington requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-15.
Typical threshold
height of an uncovered deck above grade at any point
Issued by
City of Arlington Planning and Development Services Department, Building Inspections Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.

Compare deck contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a deck permit costs in Arlington

Fee schedule in force
Official scheduleRead .
Published in
Planning and Development Services Fee Schedule, Effective October 1, 2026, Resolution No. 26 - 288, Residential Construction:

"Patio Cover, Screened Porch, Gazebo & Decks* $300.00".

The asterisk marks permits that also carry the non-refundable plan review fee, which the schedule sets at 35% of the building permit fee and requires to be paid at submittal.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Arlington compares in Texas

JurisdictionPermit needed?Threshold
Arlingtonthis pageIt dependsheight of an uncovered deck above grade at any point
AustinIt dependsuncovered decks with area no greater than 200 sq ft and no more than 30 inches above grade and not attached to the dwelling and not providing required egress and not in floodplain are exempt
Corpus ChristiIt dependsA deck needs a permit if it is larger than 200 square feet, or more than 30 inches above the ground, or attached to a dwelling, or serving the exit door; any one of the four triggers alone requires the permit.
DallasIt dependsplatforms and decks on single-family or duplex premises are exempt only if they do not exceed 200 square feet, are not more than 30 inches above grade at any point, are not attached to a dwelling, are not located in violation of the clearance of overhead service drop conductors, and do not serve the required exit door
Fort WorthIt dependsheight of the platform, walk or deck above grade, and whether it sits over a basement or story below
HoustonIt dependsuncovered decks not more than 30 inches above adjacent grade, not over any basement or story below and not part of an accessible route are exempt; a separate exemption covers decks not exceeding 200 square feet that are not more than 30 inches above grade, not attached to a dwelling and not serving the required exit door
LubbockIt dependsA structure attached to an existing residence is an addition and is permitted regardless of square footage.

How to apply in Arlington

General guide, not specific to this office

What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Arlington Planning and Development Services Department, Building Inspections Division

Permitting activity in Arlington

In 2025, Arlington authorized permits for 1,576 new residential housing units (532 single-family, 1,044 in multi-family buildings), valued at $229M, down from 1,703 the year before. That works out to about 4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 398,864.

What else needs a permit in Arlington

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsshare of one side of an existing fence being repaired or replacedSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsheight of an uncovered patio above grade at any pointSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsdepth of a prefabricated inflatable swimming poolSee schedule
Roof Replacement PermitIt dependsarea of roof covering material being replacedPlanning and Development Services Fee Schedule, Effective October 1, 2026, Resolution No. 26 - 288, Residential Construction: "Reroof* $325.00"
Shed PermitIt dependsfloor area of a one-story detached tool or storage shedSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a deck permit in Arlington?
It depends on the project. Height of an uncovered deck above grade at any point. If you are unsure how that applies to your project, call the permit office at 817-459-6502 before you start.
How much does a deck permit cost in Arlington?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 817-459-6502.
How long does a deck permit take in Arlington?
Standard application reviews are conducted within 5 business days, provided the submission is complete. If additional reviews are required, they may take up to 2 additional business days. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a deck permit in Arlington?
You can apply through the Arlington permit portal or contact the City of Arlington Planning and Development Services Department, Building Inspections Division directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Arlington?
Under Texas law (Tex. Occupations Code 1305.003(a)(6), 1301.051; Tex. Local Government Code 233.157(c)): Texas licenses individual construction trades rather than general contractors, so no state statute requires a license to act as your own general contractor on your own house. For electrical work, the state licensing law does not apply to work performed in or on a dwelling by a person who owns and resides in it, but only where no municipal ordinance specifically regulates that work, so city electrical licensing and permit rules still control inside city limits (Occupations Code 1305.003(a)(6)). For plumbing, a property owner does not need a state license to perform plumbing in the owner's homestead (Occupations Code 1301.051). In opt-in counties' unincorporated areas, an individual who builds their own house or acts as their own contractor is exempt from the Class C misdemeanor penalty for inspection notice failures if they intend to use the home as their primary residence (Local Government Code 233.157(c)). None of these exemptions waive local permit or inspection requirements where they apply. Confirm how Arlington applies this before you apply.

From the Library

Deck Permit in other Texas localities

Everything above, sourced

How this deck permit page for Arlington was verified. 2 official sources: arlingtontx.gov, arlingtontx.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Arlington Planning and Development Services Department, Building Inspections Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project