Building permits in Lubbock, Texas
Of the 10 common home projects we have verified in Lubbock, 5 need a permit outright and 5 depend on size or scope. Click any project for the full rule, fee, and how to apply.
By Mario Bailey Last checked · 2 official sources
Verified against official sources- Project types verified
- 10
- in Lubbock
City of Lubbock Department of Building Safety
- 1314 Avenue K, Lubbock, TX 79413 (mailing: P.O. Box 2000, RM 106, Lubbock, TX 79457)
- Phone: 806-775-2087
- Email: buildingsafety@mylubbock.us
- Official permit page
- Permit portal
- Official fee schedule
Look up a permit in Lubbock
Lubbock runs an online permit portal. Many local portals let you check application status, search permit records, and view inspection results without calling the office.
What needs a permit in Lubbock
Of the 10 common home projects we have verified in Lubbock, 5 need a permit outright and 5 depend on size or scope. Click any project for the full rule, fee, and how to apply.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | A structure attached to an existing residence is an addition and is permitted regardless of square footage. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
| Electrical Permit | Permit required | Installation, alteration, repair, removal, conversion or replacement of an electrical system regulated by the adopted codes is permitted work. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
| Fence Permit | It depends | A separate fence permit is required except where the fence is built as part of a new-construction building permit. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
| HVAC Permit | Permit required | Mechanical changes, equipment change-outs, and duct work additions or alterations are permitted work; replacing a minor part to make a unit functional is not. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
| Patio Permit | It depends | A patio cover or other patio structure attached to the residence is an addition and is permitted regardless of square footage. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
| Plumbing Permit | Permit required | Installation, alteration, repair, removal, conversion or replacement of a plumbing system regulated by the adopted codes is permitted work. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
| Pool Permit | It depends | The permit threshold for a pool or spa is 24 inches of depth; a circulation system, or not being drained on a daily basis, are two separate alternative triggers. | The Building Safety Fee Schedule for fiscal year October 1, 2025 to September 30, 2026... |
| Roof Replacement Permit | Permit required | A roofing permit covers tear off and replacement; changing the roof framing or pitch takes a remodeling permit instead. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
| Shed Permit | It depends | The building permit threshold for a detached accessory building is 200 square feet of floor area. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
| Solar Permit | Permit required | A Building Safety permit is required before installation of any renewable generation system at an address inside the city limits. | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September... |
Planning a project in Lubbock?
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Planning several things at once? Check your whole project