Florida / Orange County

Shed Permit in Orange County, Florida

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources Confirmed on official page

Permit required

Quick answer

All sheds require a permit in unincorporated Orange County. Structures 120 square feet or less require a zoning permit with different submittal requirements; structures over 120 square feet require a full building permit with signed and sealed plans from a licensed architect or engineer. Applications are submitted through the Fast Track online portal. Applies to unincorporated Orange County.

Typical threshold: structures 120 sq ft or less require a zoning permit; structures over 120 sq ft require a full building permit with engineered plans.

120 sq ftfootprint
Threshold illustrated: 120 sq ft. Whether Orange County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-06-18.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Orange County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before constructing any shed or accessory structure

What your shed permit must meet in Florida

Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.

  • As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
  • Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
  • Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).

Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What shed permit costs in Orange County

A $12 flat Zoning Permit covers a tool or storage shed 120 sq ft or smaller; a larger shed bills under the Accessory Structure schedule at a $26 minimum plus $4 per additional $1,000 of value, per the FY2025-26 Fee Directory.

Official fee schedule

How Orange County compares in Florida

Across the Florida jurisdictions we have verified, the same threshold runs from 36 to 400, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
Hillsborough CountyIt dependssheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit
Miami-Dade CountyPermit requiredonly one utility shed up to 400 sq ft permitted per residential lot under County Code Section 33-20(k)
Orange Countythis pagePermit requiredstructures 120 sq ft or less require a zoning permit; structures over 120 sq ft require a full building permit with engineered plans
Palm Beach CountyPermit requiredAccessory storage enclosures (sheds) up to 6 ft x 6 ft x 6 ft high, for single-family dwellings only, qualify for a Type 1 Site Plan Review Permit (zoning review only, no Building Code plan review or inspection); sheds larger than that footprint or height require a standard Type 2(A) Building Permit with plan review and inspections.
Pasco CountyIt dependsSheds of 150 square feet or less are exempt only if approved by and on file with the Florida DBPR Manufactured Building Program, with tie-downs installed and setbacks met, and not in a special flood hazard area.
Pinellas CountyIt dependssheds under 100 sq ft and no taller than 10 ft, not connected to utilities, need no permit; sheds 100 sq ft or larger, taller than 10 ft, or connected to utilities require a building permit
Polk CountyIt dependsPrefabricated reach-in storage structures of closet use are exempt only up to 5 ft mean height, 50 sq ft area and 250 cubic ft with no electrical or plumbing; all larger or walk-in structures require a permit.

Closest shed permit thresholds outside Florida

Jurisdictions we cover whose limit sits nearest Orange County's 120 sq ft.

  • Boston, Massachusetts, one-story detached accessory sheds used for tools or storage are exempt if floor area does not exceed 120 sq ft
  • Chandler, Arizona, One-story detached accessory structures (storage sheds, open-air ramadas) with floor area of 120 sq ft or less and height of 7 ft or less (up to 9 ft with 2 additional feet of setback per additional foot of height) are exempt if not connected to any electrical, gas, or water utility; exceeding either limit or connecting a utility requires a building permit.
  • Houston, Texas, one-story detached accessory structure under 120 sq ft does not require a permit
  • Jefferson County, Colorado, Sheds, mini-structures, and shipping containers 120 sq ft or less that sit at least 10 feet from any occupied structure and are no more than 14 feet tall need only a Miscellaneous Permit; anything larger, taller, or closer than 10 feet to an occupied structure needs a full Building Permit instead. Some permit is required at every size.

How to apply in Orange County

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Orange County Division of Building Safety sets the exact checklist for Orange County.

Where to apply in Orange County:

Orange County Division of Building Safety

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Orange County permit portal or by phone at (407) 836-5550.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Orange County

In 2024, Orange County authorized permits for 8,052 new residential housing units (4,810 single-family, 3,242 in multi-family buildings), valued at $2.3B, down from8,690 the year before. That works out to about 5.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 1,533,646.

About Orange County

Orange County has about 576,450 housing units. The median home is valued at $358,300, against a median household income of $77,011. About 57% of homes are owner-occupied, and the typical home was built around 1993.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a shed permit in Orange County?
All sheds require a permit in unincorporated Orange County. Structures 120 square feet or less require a zoning permit with different submittal requirements; structures over 120 square feet require a full building permit with signed and sealed plans from a licensed architect or engineer. Applications are submitted through the Fast Track online portal. Applies to unincorporated Orange County. Always confirm with the Orange County Division of Building Safety before starting.
How much does a shed permit cost in Orange County?
A $12 flat Zoning Permit covers a tool or storage shed 120 sq ft or smaller; a larger shed bills under the Accessory Structure schedule at a $26 minimum plus $4 per additional $1,000 of value, per the FY2025-26 Fee Directory. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Orange County?
You can apply through the Orange County permit portal or contact the Orange County Division of Building Safety directly. The links are listed on this page.

From the Library

What else needs a permit in Orange County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedA $12 flat Zoning Permit covers a detached deck 120 sq ft or smaller;
Electrical PermitPermit requiredNot specifiedMinimum Electrical Permit fee is $38 flat, scaling with service amperage for new or upg...
Fence PermitPermit requiredNot specifiedResidential Fence Permit fee is $38 flat per the FY2025-26 Fee Directory's Zoning Permi...
HVAC PermitPermit requiredNot specifiedAir conditioning or heat pump installation up to 3 tons with ductwork included is $75 f...
Patio PermitPermit requiredNot specifiedA concrete patio slab is valued at $5 per sq ft then charged under the Accessory Struct...
Plumbing PermitPermit requiredNot specifiedBase Plumbing Permit fee for new construction, addition or alteration is $75 flat plus...
Pool PermitPermit requiredNot specifiedThe pool shell bills under the Accessory Structure schedule using the Fee Directory's $...
Roof Replacement PermitIt dependsunder F.S. 553.79(1)(g) (HB 803, ch. 2026-63, effective 2026-07-01), work valued at less than $7,500 on a single-family dwelling qualifies for exemption upon a written exemption request with documentation of the nature and value of the work; the exemption excludes electrical, plumbing, structural, mechanical, and gas work and any property in a flood hazard area; the statute does not name roofing, so a non-structural reroof under that value can qualify; confirm with Orange County Division of Building Safety.Residential re-roof permit fee is a $26 minimum for the first $1,000 of value plus $5 p...
Solar PermitPermit requiredNot specifiedNo dedicated solar line;

Shed Permit in other Florida localities

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with Orange County Division of Building Safety. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare Shed Permit requirements across Florida localities