Electrical Permit in Virginia Beach, Virginia
By Mario Bailey Last checked 2026-07-19 · 3 official sources
Verified against official sources From an official sourcePermit required
Quick answer
Electrical work in Virginia Beach requires an electrical trade permit from Permits and Inspections, and the city's application covers circuits, service changes, panel replacement, EV chargers, generators, and photovoltaic work. USBC 13VAC5-63-80 requires permits for electrical work, with narrow exemptions for replacing snap switches, dimmer and control switches, 125 volt 15 or 20 ampere receptacles, luminaires, and ceiling fans. Apply online through Accela Citizen Access.
Typical threshold: State code exempts like-for-like replacement of snap switches, dimmer and control switches, 125 volt 15 or 20 ampere receptacles, luminaires, and ceiling fans; other electrical work needs a permit.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Virginia Beach, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
New circuits, service changes, panel work, EV chargers, generators, and similar electrical work
What electrical permit costs in Virginia Beach
Virginia Beach does not publish a fee for this permit type in a schedule we can verify. Ask Planning & Community Development, Permits & Inspections Division how the fee is calculated for your project.
How Virginia Beach compares in Virginia
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Arlington County | Permit required | Like for like replacement of switches, receptacles, lighting fixtures and similar elements of the same type, size and location is exempt unless located in plenums or penetrating fire rated or smoke protected construction. |
| Chesterfield County | Permit required | Not specified |
| Fairfax County | Permit required | Not specified |
| Fauquier County | It depends | Not specified |
| Henrico County | Permit required | Not specified |
| Loudoun County | Permit required | Not specified |
| Virginia Beachthis page | Permit required | State code exempts like-for-like replacement of snap switches, dimmer and control switches, 125 volt 15 or 20 ampere receptacles, luminaires, and ceiling fans; other electrical work needs a permit. |
How to apply in Virginia Beach
In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
What most electrical permit applications include:
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Planning & Community Development, Permits & Inspections Division sets the exact checklist for Virginia Beach.
Where to apply in Virginia Beach:
Planning & Community Development, Permits & Inspections Division
- 2403 Courthouse Drive, Building 3, Virginia Beach, VA 23456
- Phone: 757-385-4211
- Email: perminsp@vbgov.com
Inspections and closing out your permit
Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Virginia Beach permit portal or by phone at 757-385-4211.
Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Electrical Permit checklist for Virginia Beach
- Confirm the requirement. Yes, a permit is required. Typical threshold: State code exempts like-for-like replacement of snap switches, dimmer and control switches, 125 volt 15 or 20 ampere receptacles, luminaires, and ceiling fans; other electrical work needs a permit. Usually needed: New circuits, service changes, panel work, EV chargers, generators, and similar electrical work.
- Apply. In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished. Start at the Virginia Beach permit portal.
- Keep the office details handy. Planning & Community Development, Permits & Inspections Division. Phone: 757-385-4211. Address: 2403 Courthouse Drive, Building 3, Virginia Beach, VA 23456.
- Plan for inspections. Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
Compiled from the official sources on this page. Last checked 2026-07-19.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a electrical permit in Virginia Beach?
- Electrical work in Virginia Beach requires an electrical trade permit from Permits and Inspections, and the city's application covers circuits, service changes, panel replacement, EV chargers, generators, and photovoltaic work. USBC 13VAC5-63-80 requires permits for electrical work, with narrow exemptions for replacing snap switches, dimmer and control switches, 125 volt 15 or 20 ampere receptacles, luminaires, and ceiling fans. Apply online through Accela Citizen Access. Always confirm with the Planning & Community Development, Permits & Inspections Division before starting.
- How much does a electrical permit cost in Virginia Beach?
- Fees are set by Virginia Beach and are not published here. Contact the office for current amounts.
- Where do you apply for a electrical permit in Virginia Beach?
- You can apply through the Virginia Beach permit portal or contact the Planning & Community Development, Permits & Inspections Division directly. The links are listed on this page.
- Can a homeowner pull a electrical permit themselves in Virginia Beach?
- Under Virginia law (Va. Code 54.1-1101(A); 13VAC5-63-80 (USBC Sections 108.3, 108.4)): Yes. Va. Code 54.1-1101(A) exempts any person who performs or supervises construction, removal, repair, or improvement of no more than one primary residence owned by them and for their own use during any 24-month period. The exemption covers the whole licensing chapter, including tradesman licensing for electrical, plumbing, and HVAC, so it reaches trade work on the owner's own primary residence. Under the USBC the permit applicant may be the owner or the owner's agent, and an applicant may file a written statement that they are not subject to licensure instead of proof of license. Limits: one primary residence per 24 months, for the owner's own use; rental and investment property work is not covered. Confirm how Virginia Beach applies this before you apply.
From the Library
What else needs a permit in Virginia Beach
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | No size or height exemption; the city states permits are required for construction of a new deck no matter the size or height. | Residential fees start at $50 plus area or valuation based charges (non-heated new work... |
| Fence Permit | It depends | A zoning fence permit is required for any fence or wall within 30 feet of a public right-of-way (except agricultural fences in the AG district); the statewide code exempts fences of any height from building permits unless they serve as a swimming pool barrier. | $61 fence permit fee (city Fence and Wall Bulletin, rev Nov-2025) |
| HVAC Permit | Permit required | State code provides a narrow exemption for like-for-like replacement of certain mechanical appliances not fueled by gas or oil; other mechanical work needs a permit. | Not published |
| Patio Permit | It depends | Roofed or screened patio additions require a building permit; the city's published permit list does not address open at-grade patios and the state exemption list has no patio entry. | If a permit applies, residential fees start at $50 plus area or valuation based charges... |
| Plumbing Permit | Permit required | State code exempts replacement of plumbing fixtures and well pumps without alteration of the water supply and distribution systems; other plumbing work needs a permit. | Not published |
| Pool Permit | It depends | Permits are required for pools, hot tubs, and spas holding 24 inches or more of water; state code exempts only pools with a surface area of 150 square feet or less that are under 24 inches deep. | Residential permit fees start at $50 plus area or valuation based charges, plus a 2% st... |
| Roof Replacement Permit | Permit required | Roofing replacement is on the city's permit-required alterations list; the state exemption for roof covering replacement on one and two family dwellings applies only where the nominal design wind speed is not greater than 100 mph. | $50 plus $5 per $1,000 of construction value, plus a 2% state levy and a $10 technology... |
| Shed Permit | It depends | One story detached sheds with a building area of 256 square feet or less are exempt from a building permit; larger sheds require one. | Non-heated residential new construction: $50 plus $4 per 100 sq ft, plus a 2% state lev... |
| Solar Permit | Permit required | No exemption; photovoltaic work is a listed category on the city electrical permit application and electrical work requires a permit under the statewide code. | Not published |
Electrical Permit in other Virginia localities
Official sources
- https://planning.virginiabeach.gov/permits/trade
- https://s3.us-east-1.amazonaws.com/virginia-beach-departments-docs/planning/Divisions-Offices/Permits_Inspections/Documents/Electrical-Application.pdf
- https://law.lis.virginia.gov/admincode/title13/agency5/chapter63/section80/
- https://alpinecountyca.gov/DocumentCenter/View/6763/2022-CA-Residential-Codes-Section-R105---Permits
- https://www.parkcountyco.gov/DocumentCenter/View/2733/Residential-Inspection-Checklist
Verified by a person against the sources above on 2026-07-19, not confirmed with Planning & Community Development, Permits & Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-19Report an error on this page
Compare Electrical Permit requirements across Virginia localities
Permit office
Planning & Community Development, Permits & Inspections Division
757-385-4211Permit portal