Plumbing Permit in Virginia Beach, Virginia
By Mario Bailey Last checked 2026-07-19 · 3 official sources
Verified against official sources From an official sourcePermit required
Quick answer
Plumbing work requires a plumbing trade permit from Permits and Inspections, and the city's application covers fixtures including water heaters, backflow devices, and interior or exterior water and sewer line replacement. USBC 13VAC5-63-80 requires permits for plumbing work but exempts fixture replacement that does not alter the water supply and distribution systems. Apply online through Accela Citizen Access.
Typical threshold: State code exempts replacement of plumbing fixtures and well pumps without alteration of the water supply and distribution systems; other plumbing work needs a permit.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Virginia Beach, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Water heaters, new fixtures, and water or sewer line replacement or rerouting
What plumbing permit costs in Virginia Beach
Virginia Beach does not publish a fee for this permit type in a schedule we can verify. Ask Planning & Community Development, Permits & Inspections Division how the fee is calculated for your project.
How Virginia Beach compares in Virginia
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Arlington County | Permit required | Replacement of fixtures, appliances or piping of the same type, size and location on equipment not fueled by gas is exempt; work on gas fueled equipment always requires a permit and inspections. |
| Chesterfield County | Permit required | Not specified |
| Fairfax County | Permit required | Not specified |
| Fauquier County | It depends | Not specified |
| Henrico County | Permit required | Not specified |
| Loudoun County | Permit required | Not specified |
| Virginia Beachthis page | Permit required | State code exempts replacement of plumbing fixtures and well pumps without alteration of the water supply and distribution systems; other plumbing work needs a permit. |
How to apply in Virginia Beach
You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Planning & Community Development, Permits & Inspections Division sets the exact checklist for Virginia Beach.
Where to apply in Virginia Beach:
Planning & Community Development, Permits & Inspections Division
- 2403 Courthouse Drive, Building 3, Virginia Beach, VA 23456
- Phone: 757-385-4211
- Email: perminsp@vbgov.com
Inspections and closing out your permit
Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Virginia Beach permit portal or by phone at 757-385-4211.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Virginia Beach
- Confirm the requirement. Yes, a permit is required. Typical threshold: State code exempts replacement of plumbing fixtures and well pumps without alteration of the water supply and distribution systems; other plumbing work needs a permit. Usually needed: Water heaters, new fixtures, and water or sewer line replacement or rerouting.
- Apply. You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Virginia Beach permit portal.
- Keep the office details handy. Planning & Community Development, Permits & Inspections Division. Phone: 757-385-4211. Address: 2403 Courthouse Drive, Building 3, Virginia Beach, VA 23456.
- Plan for inspections. Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked 2026-07-19.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a plumbing permit in Virginia Beach?
- Plumbing work requires a plumbing trade permit from Permits and Inspections, and the city's application covers fixtures including water heaters, backflow devices, and interior or exterior water and sewer line replacement. USBC 13VAC5-63-80 requires permits for plumbing work but exempts fixture replacement that does not alter the water supply and distribution systems. Apply online through Accela Citizen Access. Always confirm with the Planning & Community Development, Permits & Inspections Division before starting.
- How much does a plumbing permit cost in Virginia Beach?
- Fees are set by Virginia Beach and are not published here. Contact the office for current amounts.
- Where do you apply for a plumbing permit in Virginia Beach?
- You can apply through the Virginia Beach permit portal or contact the Planning & Community Development, Permits & Inspections Division directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Virginia Beach?
- Under Virginia law (Va. Code 54.1-1101(A); 13VAC5-63-80 (USBC Sections 108.3, 108.4)): Yes. Va. Code 54.1-1101(A) exempts any person who performs or supervises construction, removal, repair, or improvement of no more than one primary residence owned by them and for their own use during any 24-month period. The exemption covers the whole licensing chapter, including tradesman licensing for electrical, plumbing, and HVAC, so it reaches trade work on the owner's own primary residence. Under the USBC the permit applicant may be the owner or the owner's agent, and an applicant may file a written statement that they are not subject to licensure instead of proof of license. Limits: one primary residence per 24 months, for the owner's own use; rental and investment property work is not covered. Confirm how Virginia Beach applies this before you apply.
From the Library
What else needs a permit in Virginia Beach
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | No size or height exemption; the city states permits are required for construction of a new deck no matter the size or height. | Residential fees start at $50 plus area or valuation based charges (non-heated new work... |
| Electrical Permit | Permit required | State code exempts like-for-like replacement of snap switches, dimmer and control switches, 125 volt 15 or 20 ampere receptacles, luminaires, and ceiling fans; other electrical work needs a permit. | Not published |
| Fence Permit | It depends | A zoning fence permit is required for any fence or wall within 30 feet of a public right-of-way (except agricultural fences in the AG district); the statewide code exempts fences of any height from building permits unless they serve as a swimming pool barrier. | $61 fence permit fee (city Fence and Wall Bulletin, rev Nov-2025) |
| HVAC Permit | Permit required | State code provides a narrow exemption for like-for-like replacement of certain mechanical appliances not fueled by gas or oil; other mechanical work needs a permit. | Not published |
| Patio Permit | It depends | Roofed or screened patio additions require a building permit; the city's published permit list does not address open at-grade patios and the state exemption list has no patio entry. | If a permit applies, residential fees start at $50 plus area or valuation based charges... |
| Pool Permit | It depends | Permits are required for pools, hot tubs, and spas holding 24 inches or more of water; state code exempts only pools with a surface area of 150 square feet or less that are under 24 inches deep. | Residential permit fees start at $50 plus area or valuation based charges, plus a 2% st... |
| Roof Replacement Permit | Permit required | Roofing replacement is on the city's permit-required alterations list; the state exemption for roof covering replacement on one and two family dwellings applies only where the nominal design wind speed is not greater than 100 mph. | $50 plus $5 per $1,000 of construction value, plus a 2% state levy and a $10 technology... |
| Shed Permit | It depends | One story detached sheds with a building area of 256 square feet or less are exempt from a building permit; larger sheds require one. | Non-heated residential new construction: $50 plus $4 per 100 sq ft, plus a 2% state lev... |
| Solar Permit | Permit required | No exemption; photovoltaic work is a listed category on the city electrical permit application and electrical work requires a permit under the statewide code. | Not published |
Plumbing Permit in other Virginia localities
Official sources
- https://planning.virginiabeach.gov/permits/trade
- https://s3.us-east-1.amazonaws.com/virginia-beach-departments-docs/planning/Divisions-Offices/Permits_Inspections/Documents/Plumbing-Permit-Application.pdf
- https://law.lis.virginia.gov/admincode/title13/agency5/chapter63/section80/
- https://www.grantcountywa.gov/DocumentCenter/View/5840/Exempt-R1052
- https://www.oregon.gov/bcd/codes-stand/Documents/2021orsc-ch1.pdf
Verified by a person against the sources above on 2026-07-19, not confirmed with Planning & Community Development, Permits & Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-19Report an error on this page
Compare Plumbing Permit requirements across Virginia localities
Permit office
Planning & Community Development, Permits & Inspections Division
757-385-4211Permit portal