Plumbing Permit in San Diego, California
Permit required
Yes, a permit is required
For all new plumbing fixture additions and pipe work
Quick answer
A plumbing permit is required in San Diego for water heater replacement, sewer pipe replacement, and other plumbing work. The city lists drain repair or replacement (roof, deck, or area drains) under the permit list but also says the repair only of these systems does not require a permit, so the city's text is unclear on drain repairs. These standard residential plumbing jobs qualify for the Simple (no-plan) MEP permit track and do not require plan submission.
- Issued by
- City of San Diego Development Services Department
- Phone
- 619-446-5000
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a plumbing permit costs in San Diego
- Fee schedule in force
- Official scheduleRead .
Billed per fixture under IB-103 Table 3B effective May 2026: water heater $122.97, backflow preventer $87.68 first plus $52.39 each additional, gas system or meter $264.25 per 5 outlets.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How San Diego compares in California
No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alameda County | Permit required | See schedule |
| Contra Costa County | Permit required | See schedule |
| Fresno County | Permit required | See schedule |
| Los Angeles | Permit required | Itemized per fixture per LADBS Fee Sch.5 (7/2017), for example a toilet at $23 and a water heater at $28; the schedule has the rest |
| Los Angeles County | Permit required | Plumbing Code Fee Schedule (Title 28 of the Los Angeles Code, Ord. No. 2013-0050), effective July 1, 2026: $41.35 for issuing each permit |
| Orange County | Permit required | Plumbing Permit Application Flat Fee: $363 for FY 2024-25, $383 for FY 2025-26, $391 for FY 2026-27; the schedule has the rest |
| San Diegothis page | Permit required | Billed per fixture under IB-103 Table 3B effective May 2026: water heater $122.97; the schedule has the rest |
How to apply in San Diego
General guide, not specific to this office
What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of San Diego Development Services Department
- 7650 Mission Valley Rd, San Diego, CA 92108
- Phone: 619-446-5000
Your Plumbing Permit checklist for San Diego
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: sandiego.gov: what permits do i need.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the San Diego permit portal.
- Keep the office details handy. City of San Diego Development Services Department. Phone: 619-446-5000. Address: 7650 Mission Valley Rd, San Diego, CA 92108.
Compiled from the official sources on this page. Last checked .
Permitting activity in San Diego
In 2025, San Diego authorized permits for 6,828 new residential housing units (819 single-family, 6,009 in multi-family buildings), valued at $1.2B, up from 6,615 the year before. That works out to about 4.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,422,420.
About San Diego
San Diego has about 559,653 housing units. The median home is valued at $848,500, against a median household income of $104,321. About 48% of homes are owner-occupied, and the typical home was built around 1978.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
What else needs a permit in San Diego
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck over 200 sq ft or over 30 inches above grade or attached to a dwelling requires a permit | Per IB-501 Table 501C (August 2026): Deck with pre-approved plans $1,148.29 plan check plus $264.25 inspection per building |
| Electrical Permit | Permit required | Any size | Billed per circuit or panel under IB-103 Table 2 effective May 2026: circuits 15-45 amps $176.57 for the first 5 circuits; the schedule has the rest |
| Fence Permit | It depends | fences, other than swimming pool barriers, that are 7 feet in height or less are exempt from a Building Permit | Fence or wall over 7 feet high is billed per 100 LF under IB-501 Table 501C (August 2026): $2,031.00 plan check base plus $529.71 inspection base |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | patio cover structures attached to or detached from single dwelling units in the RS and RX zones are exempt when the projected roof area is 300 square feet or less, the structure does not encroach into any yard, and it is 12 feet or less above grade; not in the appealable area of the Coastal Overlay Zone or in Planned Developments | See schedule |
| Pool Permit | It depends | prefabricated swimming pools accessory to a Group R, Division 3 occupancy are exempt when supported directly upon grade, with pool walls entirely above the adjacent grade, and capacity not over 5,000 gallons | See schedule |
| Roof Replacement Permit | It depends | renewal of roof covering without structural changes is generally exempt; permit required if structural work is needed or roof weight increases above 6 lbs per sq ft | See schedule |
| Shed Permit | It depends | one-story detached accessory buildings supported on the ground and used as tool and storage sheds are exempt when the projected roof area is 120 square feet or less | See schedule |
| Solar Permit | Permit required | Any size | Per IB-301 effective May 2026: no-plan-review residential PV systems pay only a $275.80 first system inspection fee; the schedule has the rest |
Frequently asked questions
- Do you need a plumbing permit in San Diego?
- Yes, for all new plumbing fixture additions and pipe work. If you are unsure how that applies to your project, call the City of San Diego Development Services Department at 619-446-5000 before you start.
- How much does a plumbing permit cost in San Diego?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the City of San Diego Development Services Department at 619-446-5000.
- Where do you apply for a plumbing permit in San Diego?
- You can apply through the San Diego permit portal or contact the City of San Diego Development Services Department directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in San Diego?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how San Diego applies this before you apply.
From the Library
Plumbing Permit in other California localities
Everything above, sourced
How this plumbing permit page for San Diego was verified. 2 official sources: sandiego.gov, sandiego.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of San Diego Development Services Department. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page