Ohio / Cleveland

Patio Permit in Cleveland, Ohio

Not confirmed

We could not confirm this

Not confirmed Verified City of Cleveland Department of Building and Housing, Division of Construction Permitting

By Mario Bailey, verified against official sources

Quick answer

Cleveland does not publish a rule for an at grade residential patio. The Division of Construction Permitting's Projects That Require Permits page lists garages, sheds, decks, swimming pools, awnings, canopies, fences and parking lots under Accessory Structures and Outdoor Installations, the Permit Requirements sheet lists the same set, and the Building and Housing FAQ names decks, porches and ramps, but none of them names a patio. A site search of clevelandohio.gov for "patio" and "patio permit" returns only Temporary Right of Way Occupancy for Outdoor Patio, which is a commercial encroachment permit from the street and sidewalk side, and a wildlife page. The general rule in the Permit Requirements sheet does reach "every building or structure or any appurtenances connected to such buildings or structures" and separately lists site development, so a patio may be caught by one of those, but the city does not say so in print. Call the Division of Construction Permitting at 216.664.2910 before pouring.

Applying yourself? Start with the office.

What a patio permit costs in Cleveland

Line item
patio permitNot publishedCleveland publishes no fee for this permit type in a schedule we can verify. Ask City of Cleveland Department of Building and Housing, Division of Construction Permitting how the fee is calculated for your project.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Cleveland compares in Ohio

No Ohio jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
CincinnatiPermit requiredFee Schedule effective July 1, 2026 lists "Zoning Certificate of Compliance"...
Clevelandthis pageNot confirmedNot published
ColumbusNo permit neededNot published
Franklin CountyPermit requiredFranklin County EDP Fee Schedule, 'Effective Jan.

How to apply in Cleveland

Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

What most patio permit applications include:

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of Cleveland Department of Building and Housing, Division of Construction Permitting sets the exact checklist for Cleveland.

Where to apply in Cleveland:

City of Cleveland Department of Building and Housing, Division of Construction Permitting

  • Department of Building and Housing, Division of Construction Permitting, Cleveland City Hall, 601 Lakeside Ave., Room 505, Cleveland, OH 44114
  • Phone: 216.664.2910
  • Email: BHpermits@clevelandohio.gov

Inspections and closing out your permit

A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Cleveland permit portal or by phone at 216.664.2910.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a patio permit in Cleveland?
Cleveland does not publish a rule for an at grade residential patio. The Division of Construction Permitting's Projects That Require Permits page lists garages, sheds, decks, swimming pools, awnings, canopies, fences and parking lots under Accessory Structures and Outdoor Installations, the Permit Requirements sheet lists the same set, and the Building and Housing FAQ names decks, porches and ramps, but none of them names a patio. A site search of clevelandohio.gov for "patio" and "patio permit" returns only Temporary Right of Way Occupancy for Outdoor Patio, which is a commercial encroachment permit from the street and sidewalk side, and a wildlife page. The general rule in the Permit Requirements sheet does reach "every building or structure or any appurtenances connected to such buildings or structures" and separately lists site development, so a patio may be caught by one of those, but the city does not say so in print. Call the Division of Construction Permitting at 216.664.2910 before pouring. Always confirm with the City of Cleveland Department of Building and Housing, Division of Construction Permitting before starting.
How much does a patio permit cost in Cleveland?
Fees are set by Cleveland and are not published here. See the official fee schedule for current amounts.
Where do you apply for a patio permit in Cleveland?
You can apply through the Cleveland permit portal or contact the City of Cleveland Department of Building and Housing, Division of Construction Permitting directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in Cleveland?
Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. Chapter 4740): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. Certain specialty trades, HVAC, refrigeration, and hydronics contractors, are separately licensed statewide under R.C. Chapter 4740, and no homeowner exemption from that licensing requirement could be found in the chapter's text. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Cleveland applies this before you apply.

From the Library

What else needs a permit in Cleveland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedThe General Fee Schedule effective January 2, 2014 has no deck line item.
Electrical PermitIt dependsNot specifiedElectrical Wiring and Equipment fee schedule effective January 2, 2014: "the minimum fee...
Fence PermitIt dependsshare of an existing fence repaired or replaced within any twelve month period, where foundations and footers are unchangedGeneral Fee Schedule effective January 2, 2014, item C(2) "Fences, guardrails, or...
HVAC PermitPermit requiredNot specifiedHVAC permit fee schedule effective January 2, 2014: "One, two and three family...
Plumbing PermitIt dependsNot specifiedPlumbing Fixtures, Appliance and Piping fee schedule effective January 2, 2014: "The...
Pool PermitIt dependswater capacity of a private swimming pool; a depth of more than two feet also triggers the permitGeneral Fee Schedule effective January 2, 2014, item C(4) "Swimming pools...
Roof Replacement PermitIt dependsshare of the roof whose shingles are replaced, where the replacement is in the same materialThe General Fee Schedule effective January 2, 2014 has no roofing line item.
Shed PermitPermit requiredNot specifiedGeneral Fee Schedule effective January 2, 2014, item C(1) "Private garages, tool sheds...
Solar PermitPermit requiredNot specifiedCleveland's Solar Panel Guide publishes a residential table: residential building permit...

Patio Permit in other Ohio localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Cleveland documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Cleveland Department of Building and Housing, Division of Construction Permitting. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Patio Permit requirements across Ohio localities

Not confirmed
Get quotes