EV Charger Permit in Raleigh, North Carolina
Permit required
Yes, a permit is required
Before starting any work to install a hardwired electric vehicle charging station at a home.
Quick answer
Raleigh requires a permit before any work to install an electric vehicle charging station at a home, and the installation must be inspected by the city. A residential application goes to downtownds@raleighnc.gov with the Residential Permit Application, a survey showing the proposed location, and power riser information and cut sheets for the charger. The city notes that typical 240-volt chargers need 40-amp service and may require a service or panel upgrade, and that the hardwired installation may be done by the homeowner or a licensed electrician.
- Issued by
- City of Raleigh Planning and Development Department (Permits - Residential; Planning and Development Customer Service Center)
- Phone
- 919-996-2500
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an EV charger permit costs in Raleigh
- Fee schedule in force
- Official scheduleRead .
- No EV-charger line item in the FY27 Development Fee Guide (applications submitted July 1, 2026 through June 30, 2027).
- FY27 Development Fee Guide (applications submitted July 1, 2026 through June 30, 2027), Building and Safety: "Minimum Trade Permit Fee" of $124.00 per trade ("Any fee not specifically listed as an individual fee will be charged at the minimum permit fee.");
- the guide's appendix adds the 4% technology surcharge for a total of $129.00.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Raleigh
General guide, not specific to this office
What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Raleigh Planning and Development Department (Permits - Residential; Planning and Development Customer Service Center)
- Planning and Development Customer Service Center, One Exchange Plaza, Suite 400, Raleigh, NC 27601
- Phone: 919-996-2500
- Email: DowntownDS@raleighnc.gov
EV Charger Permit in Raleigh compared with nearby North Carolina localities
| Locality | Permit needed? | Threshold | What each North Carolina schedule says | Verified |
|---|---|---|---|---|
| Raleigh | Permit required | Any size | See schedule | |
| Durham | Permit required | Any size | See schedule |
Your EV Charger Permit checklist for Raleigh
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: raleighnc.gov: permits residential.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Raleigh permit portal.
- Keep the office details handy. City of Raleigh Planning and Development Department (Permits - Residential; Planning and Development Customer Service Center). Phone: 919-996-2500. Email: DowntownDS@raleighnc.gov. Address: Planning and Development Customer Service Center, One Exchange Plaza, Suite 400, Raleigh, NC 27601.
Compiled from the official sources on this page. Last checked .
Permitting activity in Raleigh
In 2025, Raleigh authorized permits for 4,738 new residential housing units (1,343 single-family, 3,395 in multi-family buildings), valued at $1.3B, down from 5,044 the year before. That works out to about 10 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 473,139.
What else needs a permit in Raleigh
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | cost of the remodel in a single-family residence, where no load-bearing, plumbing-design, HVAC or electrical work is involved | See schedule |
| Deck Permit | It depends | Before building a new deck, screened porch, balcony or covered deck, or altering a... | See schedule |
| Electrical Permit | It depends | Before an electrical service upgrade, adding circuits or outlets, installing an interior... | See schedule |
| Fence Permit | It depends | share of an existing residential fence being replaced with no change of material, height or location | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | Permit required | Any size | See schedule |
| Plumbing Permit | It depends | Before installing, extending or generally repairing any plumbing system, replacing... | See schedule |
| Pool Permit | It depends | water a pool, spa or hot tub can hold | See schedule |
| Roof Replacement Permit | It depends | cost of the roof replacement work in a single-family residence | See schedule |
| Shed Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | The FY27 Development Fee Guide (applications submitted July 1, 2026 through June 30, 2027) lists only "Photovoltaic (Solar) - Commercial" at $543.00 per permit |
| Water Heater Permit | It depends | Before installing a new water heater, or replacing one with a different fuel, energy... | See schedule |
Frequently asked questions
- Do you need an EV charger permit in Raleigh?
- Yes, before starting any work to install a hardwired electric vehicle charging station at a home. If you are unsure how that applies to your project, call the permit office at 919-996-2500 before you start.
- How much does an EV charger permit cost in Raleigh?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 23 Oct 2026. For the figure on your own project, call the permit office at 919-996-2500.
- Where do you apply for an EV charger permit in Raleigh?
- You can apply through the Raleigh permit portal or contact the City of Raleigh Planning and Development Department (Permits - Residential; Planning and Development Customer Service Center) directly. The links are listed on this page.
- Can a homeowner pull an EV charger permit themselves in Raleigh?
- Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Raleigh applies this before you apply.
From the Library
EV Charger Permit in other North Carolina localities
Everything above, sourced
How this EV charger permit page for Raleigh was verified. 2 official sources: raleighnc.gov, raleighnc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Raleigh Planning and Development Department (Permits - Residential; Planning and Development Customer Service Center). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page