Nevada / Clark County

Solar Permit in Clark County, Nevada

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources From an official source

Permit required

Quick answer

A building permit is required for residential solar photovoltaic installations in Clark County. Rooftop residential solar does not require a separate structural plan review. No electrical plan review is required for systems under 5 kW; engineer-designed plans are required for systems 25 kW AC or larger. Requirements were last updated December 1, 2025 per county policy BD-PP-206.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Clark County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before installing any residential roof-mounted or ground-mounted solar PV system

What solar permit costs in Clark County

No dedicated solar fee table; permanent equipment like a solar system falls under the general building permit valuation definition and bills via Table 3-A starting at $54, per Section 22.02.345(A).

Official fee schedule

How Clark County compares in Nevada

No Nevada jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Clark Countythis pagePermit requiredNo dedicated solar fee table;
HendersonPermit required$700 for a residential photovoltaic system up to 10 kW plus $176 per addition...

How to apply in Clark County

A rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit.

What most solar permit applications include:

  • Both a building permit and a separate electrical permit are required, since the array must be designed and installed to the residential code's solar provisions and to the National Electrical Code (IRC R324.3).
  • The plan set identifies listed equipment: PV modules listed to UL 1703 (or both UL 61730-1 and UL 61730-2), and inverters listed to UL 1741, with grid-tied inverters listed for utility interaction (IRC R324.3.1).
  • Structural drawings show that the roof framing is designed to structurally support the array and withstand the gravity loads it adds (IRC R324.4.1).
  • The site plan lays out roof access pathways at least 36 inches wide, plus a ridge setback sized to how much of the roof the array covers, so firefighters retain pathways and ventilation access (IRC R324.6.1, IRC R324.6.2).
  • The one line electrical diagram shows the rapid shutdown method and the location of its single initiation device, since one control point must bring all system conductors down to safe levels (NEC 690.12, NEC 690.56(C)).
  • Interconnecting the array to the utility grid at a defined point of connection is a separate application process from the local building or electrical permit and must be approved before the system can operate (NEC 705.12).
  • Some permitting offices route applications through SolarAPP+, an automated review platform that checks the plan set against code requirements and issues eligible permits instantly (DOE SolarAPP+).

General submittal guidance from IRC 2021 R324 (Solar Energy Systems) and NEC 2020 Article 690 (Solar Photovoltaic Systems) and Article 705 (Interconnected Power Production Sources). Source. Clark County Department of Building and Fire Prevention sets the exact checklist for Clark County.

Where to apply in Clark County:

Clark County Department of Building and Fire Prevention

Inspections and closing out your permit

Inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.

  1. Where an agency runs a rough or pre-inspection, it checks the array's roof penetrations while they are still exposed, confirming they are flashed and sealed (IRC R324.4.3).
  2. The inspector confirms whether rapid shutdown is required, how it is accomplished, and that it is properly identified (NEC 690.12, NEC 690.56(C)).
  3. PV disconnecting means must be permanently marked and installed where they are readily accessible, which the inspector confirms in the field (NEC 690.13).
  4. Bonding and grounding of the array, including every exposed non current carrying metal part and the grounding electrode system, is checked before sign off (NEC 690.43, NEC 690.47).
  5. At the service equipment, the inspector looks for the required rapid shutdown placard, a labeled diagram showing the initiation device's location in the specified colors and letter sizes (NEC 690.56(C)).
  6. Utility interconnection is inspected and approved separately from the local building department's sign off, and the system cannot be energized until both approvals are in hand (NEC 705.12).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Clark County permit portal or by phone at (702) 455-3000.

Inspection sequence from NEC 2020 Article 690 (690.12 rapid shutdown, 690.13 disconnects, 690.43/690.47 grounding, 690.56 labeling) and IRC 2021 R324.4.3 (roof penetrations). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Clark County

In 2024, Clark County authorized permits for 14,754 new residential housing units (12,277 single-family, 2,477 in multi-family buildings), valued at $3.7B, up from13,073 the year before. That works out to about 6.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 2,398,871.

About Clark County

Clark County has about 935,960 housing units. The median home is valued at $400,800, against a median household income of $73,845. About 57% of homes are owner-occupied, and the typical home was built around 1997.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a solar permit in Clark County?
A building permit is required for residential solar photovoltaic installations in Clark County. Rooftop residential solar does not require a separate structural plan review. No electrical plan review is required for systems under 5 kW; engineer-designed plans are required for systems 25 kW AC or larger. Requirements were last updated December 1, 2025 per county policy BD-PP-206. Always confirm with the Clark County Department of Building and Fire Prevention before starting.
How much does a solar permit cost in Clark County?
No dedicated solar fee table; permanent equipment like a solar system falls under the general building permit valuation definition and bills via Table 3-A starting at $54, per Section 22.02.345(A). See the official fee schedule for current amounts.
Where do you apply for a solar permit in Clark County?
You can apply through the Clark County permit portal or contact the Clark County Department of Building and Fire Prevention directly. The links are listed on this page.

From the Library

What else needs a permit in Clark County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedBilled as a valuation-based building permit under Table 3-A starting at $54 for the fir...
Electrical PermitPermit requiredNot specified$54 permit issuance fee under Table 3-B, with flat online simple permit fees of $61.88...
Fence PermitIt dependsfences over 6 feet in height require a building permit; all fences require a Fence/Wall Permit (Form BPA-005) regardless of heightType A fencing 6 feet or under that is not a pool barrier needs no permit;
HVAC PermitPermit requiredNot specified$54 permit issuance fee under Table 3-C, with flat online simple permit fees of $61.88...
Patio PermitPermit requiredNot specifiedPatio covers bill as a valuation-based building permit under Table 3-A starting at $54...
Plumbing PermitPermit requiredNot specified$54 permit issuance fee under Table 3-D, with flat online simple permit fees of $56.57...
Pool PermitPermit requiredNot specifiedPool and spa permits add a flat $110 equipment and plumbing fee on top of the estimated...
Roof Replacement PermitPermit requiredNot specifiedReplacing no more than 64 sq ft of non-tile roof sheathing with no structural repairs n...
Shed PermitIt dependssheds over 200 sq ft require a building permit; storage sheds 200 sq ft or under may be exempt under Building Administrative Code Section 22.02.190A detached storage shed of 200 sq ft or less with no mechanical or plumbing needs no bu...

Solar Permit in other Nevada localities

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with Clark County Department of Building and Fire Prevention. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare Solar Permit requirements across Nevada localities