Guide
Do You Need a Permit to Remodel a Kitchen? Cabinets No, Wiring Yes
New cabinets, countertops, paint and flooring need no permit under the model code. Moving a sink, adding a circuit, venting a range hood or taking out a wall does. The line, item by item, with how Boston, San Francisco, Portland, Las Vegas, Grand Rapids and Martin County draw it.
It depends on what the remodel touches. New cabinets, countertops, paint, tile and flooring need no permit under the model code most states use. The moment the job moves a sink, adds or rewires an outlet or light, runs a gas line, adds a vented range hood, or takes out a wall, it needs one, and usually more than one: a building permit plus a separate permit for each trade.
The next step: write down every item on your plan and sort it into the two lists below. If anything lands on the second list, call your building department or open its page in our verified index before demolition starts, because some cities, Boston among them, require a licensed tradesperson to pull the trade permits.
What needs no permit
The International Residential Code exempts “Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work.” Local lists repeat it almost word for word:
- Cabinets and countertops. Boston: “Adding or replacing new kitchen cabinets does not require a permit.” Martin County, Florida lists “Cabinetry” among work needing no permit. Portland lets you “Install shelving and cabinets” without one.
- Paint, tile, flooring and backsplash. Las Vegas exempts “Painting, papering, cabinets, countertops, and similar finish work, floor covering.”
- Swapping a plug-in appliance. Martin County exempts “Appliance Replacement (plug in)”, so a new refrigerator in the same spot is not permit work there.
- Replacing a faucet or sink in place. Grand Rapids: “If you’re only replacing a faucet, sink, toilet, or similar fixture, a plumbing permit is not required.” Las Vegas exempts repairing or replacing a sink, and a faucet “if not concealed in a wall.”
- Replacing a broken outlet like for like. Las Vegas allows removing and replacing “broken or damaged electrical outlets (like for like only),” but adds that “If a GFCI protected outlet is required by code, a permit is required.”
Exempt does not mean anything goes. The model code says an exemption “shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code.”
What needs a permit
The model code’s general rule, Section R105.1, requires a permit to “construct, enlarge, alter, repair, move, demolish” a building or to “erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system.” In a kitchen that catches:
| Work | Permit | What the local rule says |
|---|---|---|
| Moving the sink or dishwasher, new drain or supply lines | Plumbing | Las Vegas requires a permit to “Alter piping inside a wall, ceiling or beneath a floor”; Grand Rapids for “adding lines and pipes in the walls and floors” |
| New outlets, lights, circuits or under-cabinet wiring | Electrical | Las Vegas: “Run additional wiring to put in an electrical outlet or light fixture”; Grand Rapids: “If it involves the electrical wires of your home, you’ll need a permit” |
| A vented range hood | Mechanical | Las Vegas requires one to “Install bathroom fans, dryer exhausts, kitchen range exhausts”; Grand Rapids lists “kitchen hoods” |
| A new gas line for a range | Plumbing or gas | Las Vegas: “Install, alter or repair gas piping between the meter and any appliance” |
| Removing, moving or adding a wall | Building | Portland lists “Move, remove, or add walls” as an alteration needing a building permit |
| A new or widened window or door | Building | Portland: “Cut new window or door opening, widen or reduce the size of existing openings” |
Replacing a hood in place, and the make-up air question for a large one, are covered in our guide to range hood and exhaust fan permits.
Two notes on gas. Grand Rapids does not require a mechanical permit “for installing or removing gas appliances (like stoves and dryers),” but running the piping to a new spot is a different job: Las Vegas, for one, requires a permit for gas piping “between the meter and any appliance.” Boston’s cabinet page sends you to the full renovation process if the work “affects gas lines, electrical lines.”
Opening a wall is also where “repair” stops being exempt. The model code’s ordinary repairs rule excludes “the cutting away of any wall, partition or portion thereof” and any “addition to, alteration of, replacement or relocation of any water supply, sewer, drainage” piping or “electric wiring.” Our guide to removing a wall without a permit explains why that is true whether or not the wall is load-bearing.
Moving or extending the gas line to a range is permitted gas work in every office in our dataset that addresses gas piping; capping one when the range comes out is where offices split. Our guide to gas line permits covers both.
How cities handle a full kitchen remodel
San Francisco requires a permit “before renovating and replacing kitchen or bath fixtures” and prices it from a floor: “Minimum valuations are $24,663 per kitchen.” You can apply online only when the work “Will not involve removing or moving walls (does not require plans)”; anything else goes through over-the-counter review with plans.
Boston says plainly: “You will need several permits if you are planning to renovate a bathroom or kitchen.” The building permit is a Short-Form or Long-Form permit depending on structural scope, and “Only a contractor with a valid, non-expired Massachusetts trade license may apply for a Plumbing Permit, Electrical, or Sheet Metal permit and perform any plumbing, electrical, or exhaust work.” A homeowner cannot do the trade work there.
Martin County, Florida lists “Kitchen and Bathroom remodels” among the projects that require a permit, while cabinetry and plug-in appliance swaps do not.
Grand Rapids goes the other way on who may do the work: “As a homeowner, you’re able to do any electrical work in your home with a permit,” and the same for plumbing and mechanical work. Landlords need licensed contractors.
Adding a second kitchen, such as a basement kitchenette, takes the same trade permits plus, in seven of the eight offices we compared, a signed form promising the space stays part of one household; our second kitchen guide compares eight of them.
Who should pull the permits
If you hire a general contractor, the permits are part of the job: ask for the permit numbers before demolition, and make sure each trade permit has a final inspection on record before the walls close. If you are doing the work yourself, check two things first: whether your city lets an owner pull trade permits (Grand Rapids does, Boston does not), and whether it lets an owner do the work on a house they live in. Our guide to who pulls the permit compares contractor-of-record and owner-builder rules in the states we have verified. For the wiring, see electrical work that needs a permit and whether a homeowner can pull an electrical permit; for the sink and dishwasher lines, plumbing work that needs a permit. A bathroom follows the same pattern with different fixtures, covered in our bathroom remodel permit guide.
If earlier kitchen work in your house was done without permits, our selling guide covers what that means when you sell.
Method
Every rule above was read on November 5, 2026 in the building department’s own published page or handout, or in the 2024 International Residential Code on ICC’s digital codes site, all linked below. Your state may adopt a different edition of the model code, and your city may amend its exemption list, so the list your building department publishes is the one that governs your kitchen.
Sources
- 2024 International Residential Code, Chapter 1, read on ICC Digital Codes: R105.1 (when a permit is required), R105.2 (work exempt from permit, Building item 6 on finish work and the electrical, gas, mechanical and plumbing exemptions) and R105.2.2 (ordinary repairs). (accessed )
- City of Boston, Install or Replace Kitchen Cabinets: no permit for cabinets alone, unless the work affects gas or electrical lines or is a full renovation. (accessed )
- City of Boston, Renovate a Bathroom or Kitchen: several permits; only a Massachusetts-licensed tradesperson may pull plumbing, electrical or sheet metal permits. (accessed )
- San Francisco Department of Building Inspection, Apply for a kitchen or bath remodel permit: a permit before renovating and replacing kitchen fixtures, the $24,663 minimum valuation per kitchen, and the online route for remodels that do not remove or move walls. (accessed )
- City of Portland, Oregon, residential permits page: plumbing, electrical and building permit triggers, and the inside work that needs no permit (cabinets, shelving, wall and floor coverings). (accessed )
- City of Las Vegas Building and Safety, When Do I Need a Permit?: exempt finish work, the electrical, plumbing and mechanical permit triggers including kitchen range exhausts, and like-for-like outlet and sink replacements. (accessed )
- City of Grand Rapids, Michigan, overview of permits for home renovation projects: electrical, plumbing and mechanical permit lines, including kitchen hoods and gas appliances. (accessed )
- Martin County, Florida, Do I Need a Permit?: kitchen and bathroom remodels require a permit; cabinetry, plug-in appliance replacement and finish work do not. (accessed )