Roof Replacement Permit in Town of Hempstead, New York
Not confirmed
We could not confirm this
By Mario Bailey, verified against official sources
Quick answer
The Town of Hempstead does not publish a roofing rule. Its Department of Buildings issues filing instruction sheets for more than twenty residential work types on the Building Permit page of the Online Permit Center, and none of them covers reroofing, stripping shingles or roof replacement; the word roof does not appear on the Building Department pages of hempsteadny.gov or anywhere in the portal's published content. The nearest published guidance is the sheet for direct replacement or repair of minor storm, flood and wind damage, which does require a building permit and a professional engineer or architect letter describing the scope, and the town's flood zone page, which states that a building permit is required in all construction cases. A homeowner replacing a roof should call the building inspectors at 516-812-3088 or the plans examiners at 516-812-3073 to confirm before work starts.
Applying yourself? Start with the office.
What a roof replacement permit costs in Town of Hempstead
How Town of Hempstead compares in New York
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Buffalo | Permit required | Not specified |
| New York City | It depends | the permit requirement turns on whether the roof deck or sheathing is replaced, and on whether the NYC Energy Conservation Code calls for additional thermal insulation |
| Rochester | It depends | share of the total roof area involved in the repair or covered by an added roof layer |
| Town of Brookhaven | It depends | repair work that has no impact on fire and life safety, meaning no impact on the structural system, the required means of egress, or the fire protection system |
| Town of Hempsteadthis page | Not confirmed | Not specified |
How to apply in Town of Hempstead
A residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies.
What most roof replacement permit applications include:
- State on the application whether the job is a roof replacement, which strips all existing layers down to the bare deck, or a roof recover, which leaves the old covering in place under specific conditions, since the two scopes are governed differently (IRC R908.3).
- A recover is only an option where the new covering follows the roof covering manufacturer's approved instructions or is a self-supporting system, such as standing-seam metal, that does not rely on the existing roof for support (IRC R908.3.1).
- Full tear-off must be scoped on the application instead of a recover when the existing roof is water soaked or deteriorated, is slate, clay, cement, or asbestos-cement tile, or already carries two or more layers of roof covering (IRC R908.3.1.1).
- The materials and installation methods described on the application must comply with the reroofing requirements of the roof-assemblies chapter (IRC R908.1).
- If the scope reuses existing slate, clay, or cement tile, damaged or broken pieces cannot be listed for reinstallation, and any rusted or deteriorated flashings, edgings, outlets, or vents uncovered during tear-off must be scoped for replacement (IRC R908.5).
General submittal guidance from IRC Section R908 Reroofing (text as adopted in the 2020 Residential Code of New York State, based on the 2018 IRC). Source. Town of Hempstead Department of Buildings sets the exact checklist for Town of Hempstead.
Where to apply in Town of Hempstead:
Town of Hempstead Department of Buildings
- One Washington Street, 2nd Floor, Hempstead, NY 11550
- Phone: 516-538-8500
- Email: TOHBuildingQuestions@hempsteadny.gov
Inspections and closing out your permit
Most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.
- Where the covering is fully removed and the sheathing is exposed, replaced, or added, inspectors check the deck and its nailing before any new roofing goes down, since the structural framework must be able to carry the new covering's loads (IRC R908.2).
- An overlay is only approved where it meets one of the code's listed recover conditions, such as installation in accordance with the covering manufacturer's approved instructions (IRC R908.3.1).
- Flashings disturbed or replaced during the job are checked against the approved manufacturer's installation instructions, and metal flashing that will receive bituminous material must be primed before installation (IRC R908.6).
- A final inspection confirms the completed roof covering and its fasteners were installed as required for that material and per manufacturer instructions before the permit is closed (IRC R905).
- In some regions with strengthened wind provisions, reroofing an older single-family home also triggers inspection of supplemental deck-nailing and a secondary water barrier added during tear-off, on top of the base reroofing requirements (Florida Building Code, Residential R908.7 Mitigation).
- Reinstalled existing slate, clay, or cement tile is checked against reuse limits at inspection, and any rusted, damaged, or deteriorated flashings, edgings, outlets, or vents found during tear-off must be replaced rather than reinstalled (IRC R908.5).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Town of Hempstead permit portal or by phone at 516-538-8500.
Inspection sequence from IRC Section R908 Reroofing and Section R905 Roof Coverings (2021 International Residential Code). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Roof Replacement Permit checklist for Town of Hempstead
- Confirm the requirement. Not confirmed, contact the office.
- Budget the fee. Check the official fee schedule for current amounts.
- Apply. A residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies. Start at the Town of Hempstead permit portal.
- Keep the office details handy. Town of Hempstead Department of Buildings. Phone: 516-538-8500. Address: One Washington Street, 2nd Floor, Hempstead, NY 11550.
- Plan for inspections. Most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a roof replacement permit in Town of Hempstead?
- The Town of Hempstead does not publish a roofing rule. Its Department of Buildings issues filing instruction sheets for more than twenty residential work types on the Building Permit page of the Online Permit Center, and none of them covers reroofing, stripping shingles or roof replacement; the word roof does not appear on the Building Department pages of hempsteadny.gov or anywhere in the portal's published content. The nearest published guidance is the sheet for direct replacement or repair of minor storm, flood and wind damage, which does require a building permit and a professional engineer or architect letter describing the scope, and the town's flood zone page, which states that a building permit is required in all construction cases. A homeowner replacing a roof should call the building inspectors at 516-812-3088 or the plans examiners at 516-812-3073 to confirm before work starts. Always confirm with the Town of Hempstead Department of Buildings before starting.
- How much does a roof replacement permit cost in Town of Hempstead?
- Fees are set by Town of Hempstead and are not published here. See the official fee schedule for current amounts.
- Where do you apply for a roof replacement permit in Town of Hempstead?
- You can apply through the Town of Hempstead permit portal or contact the Town of Hempstead Department of Buildings directly. The links are listed on this page.
- Can a homeowner pull a roof replacement permit themselves in Town of Hempstead?
- Under New York law (Inside New York City: NYC Admin. Code 28-104.1, 28-105.1, 28-105.4, 28-105.5.1, 28-401.3 (definition of "general contractor"). Outside New York City: N.Y. Exec. Law 381(2); 19 NYCRR 1203.3(a)(1).): New York State sets no owner-builder rule at all outside New York City. Executive Law 381(2) puts administration and enforcement in the hands of each local government, and 19 NYCRR 1203.3(a)(1) only requires each authority having jurisdiction to make building permits mandatory for work that must conform to the codes, leaving who may apply to local law. The state licenses no general contractors and imposes no owner-builder affidavit, disclosure form or post-permit sale restriction of the kind Florida uses, so whether a homeowner may pull the permit is a question for the specific city, town, village or county. New York City is the genuine outlier. Administrative Code 28-105.1 makes the work itself unlawful without a written permit, and Administrative Code 28-104.1 bars the department from issuing that permit until it approves the required construction documents, which must be prepared by or under the supervision of a registered design professional, meaning a licensed architect or engineer, as required by the code. A homeowner therefore cannot self-prepare and file the plans for permit-requiring work in New York City even though Administrative Code 28-105.5.1 defines the permit applicant as the person who performs the work or retains a subcontractor, and even though the general contractor registration definition in Administrative Code 28-401.3 expressly excludes an individual who constructs a residential structure of no more than three dwelling units for his or her own occupancy. Note that Administrative Code 28-105.4 exempts minor alterations and ordinary repairs from the permit requirement entirely, so the design professional bottleneck applies only to work that needs a permit in the first place. Confirm how Town of Hempstead applies this before you apply.
From the Library
What else needs a permit in Town of Hempstead
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Charged as a building permit under Town Code 86-11C(1) as amended by Local Law No. |
| Electrical Permit | Permit required | Not specified | The Town charges no electrical permit fee. |
| Fence Permit | Permit required | Not specified | Charged as a building permit under Town Code 86-11C(1) as amended by Local Law No. |
| HVAC Permit | Permit required | Not specified | Town Code 86-11I(2), as adopted by Local Law No. |
| Plumbing Permit | Permit required | Not specified | Town Code 86-11N, as adopted by Local Law No. |
| Pool Permit | Permit required | Not specified | Charged as a building permit under Town Code 86-11C(1) as amended by Local Law No. |
| Shed Permit | Permit required | Not specified | Charged as a building permit under Town Code 86-11C(1) as amended by Local Law No. |
| Solar Permit | Permit required | Not specified | The flat solar fee is gone. |
Roof Replacement Permit in other New York localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Town of Hempstead documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with Town of Hempstead Department of Buildings. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Roof Replacement Permit requirements across New York localities