Patio Permit in Manchester, New Hampshire
Not confirmed
We could not confirm this
Quick answer
Manchester does not publish whether an uncovered, on-grade patio needs a permit. The Building Code, Fees page, Plan Review page, permit applications and zoning ordinance never address a patio as a permit trigger; the zoning ordinance treats pool patios as accessory structures for setbacks only. Ask the Planning and Community Development Department at (603) 624-6450 before building.
- Issued by
- Planning and Community Development Department, Building Regulations Division
- Phone
- (603) 624-6450
Applying yourself? Start with the office.
What a patio permit costs in Manchester
- Permit fee
- Not published
- Fee schedule in force
- Official scheduleRead .
Manchester publishes no fee for this permit type in a schedule we can verify. Ask Planning and Community Development Department, Building Regulations Division how the fee is calculated for your project.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
Where to ask in Manchester
We could not confirm the rule, so start with the office's own pages or call the number below.
Planning and Community Development Department, Building Regulations Division
- One City Hall Plaza, West Wing, Manchester, NH 03101
- Phone: (603) 624-6450
- Email: pcd@manchesternh.gov
What else needs a permit in Manchester
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | finish work only (painting, papering, tiling, carpeting, cabinets, countertops) versus plumbing, electrical or structural changes | Each plus the $25.00 application fee (Building Code §109.8, adopted July 6, 2021) |
| Deck Permit | Permit required | Any size | Building permit: estimated cost of the work multiplied by .010 (the Fees page lists decks under this line), plus the $25.00 application fee |
| Electrical Permit | Permit required | Any size | See schedule |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | Permit required | Any size | Building permit fee under Building Code §109.8: estimated cost of the work multiplied by .010 for new structures, plus the $25.00 non-refundable application fee |
| HVAC Permit | Permit required | Any size | See schedule |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | prefabricated pools; the IRC R105.2 item 7 depth limit Manchester left in place | Building permit: estimated cost of the work multiplied by .01, plus the $25.00 application fee |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | Permit required | Any size | Building permit: estimated cost of the work multiplied by .010 (the Fees page lists sheds under this line), plus the $25.00 application fee |
| Solar Permit | Permit required | Any size | See schedule |
| Water Heater Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a patio permit in Manchester?
- We could not confirm the patio permit rule on an official Manchester page, so this page gives no yes or no. Call the Planning and Community Development Department, Building Regulations Division at (603) 624-6450 before you start.
- How much does a patio permit cost in Manchester?
- We found no published fee for a patio permit in Manchester. To learn how it is calculated for your project, call the Planning and Community Development Department, Building Regulations Division at (603) 624-6450.
- Where do you apply for a patio permit in Manchester?
- Apply through the Planning and Community Development Department, Building Regulations Division. The official permit page and contact details are listed on this page.
- Can a homeowner pull a patio permit themselves in Manchester?
- Under New Hampshire law (RSA 155-A:4, I; RSA 319-C:15, II; RSA 153:36, I and VIII(c)): New Hampshire does not license general or residential contractors, so a homeowner may build without a contractor's license; the person responsible for the work must still get the building permit. State trade-licensing law expressly lets a homeowner do electrical work in a single family home they own and live in (or will live in), and lets a property owner do plumbing in their own single-family detached or townhouse residence, including new construction, provided the plumbing meets the state plumbing code. A homeowner may also do fuel gas fitting in an existing single family home that is their primary residence, subject to code, application and inspection requirements. No statute imposes a sale or occupancy restriction on owner-built homes. Confirm how Manchester applies this before you apply.
From the Library
Everything above, sourced
What was checked for this patio permit page for Manchester. The rule itself is not confirmed. 1 official source: manchesternh.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Planning and Community Development Department, Building Regulations Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page