Solar Permit in Billings, Montana
Permit required
Yes, a permit is required
Before installing a solar PV system.
Quick answer
A solar photovoltaic system is an electrical installation, and Montana requires an electrical permit for any installation in new construction, remodeling or repair; inside Billings the city, as a certified electrical jurisdiction, issues it. Billings also handles rooftop solar as its own 'Solar' building permit application type and publishes PV plan requirements: a site plan, a one-line diagram, site-specific labels, and a Montana-licensed engineer's evaluation that the roof can carry the load (30 psf snow, 110 mph wind, exposure C).
- Issued by
- City of Billings Building Division
- Phone
- (406) 657-8270
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your Montana Department of Labor and Industry, Construction Contractor License (CCL) Program (a license since January 1, 2026, replacing the old registration; it checks workers' compensation and business compliance, not trade skill, and contractors with no employees are exempt) license active, and under which business name? Verify it on ebizws.mt.gov.
Montana's owner-builder rule (MCA 37-45-104(13); 37-68-103(3); 37-69-102(1)(a); 50-60-506(4)) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Billings
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
Billings electrical fees are a flat residential schedule (for example, single-family dwelling 100 to 300 amp service $130.00; interior rewire only or new addition $40.00), read from the image-only Electrical Permit Fees PDF dated April 23, 2026, which has no line specific to solar.
Rooftop solar also takes a building permit priced by valuation.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Billings
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Billings Building Division
- 316 N 26th St, 5th Floor, Billings, MT 59101
- Phone: (406) 657-8270
- Email: permits@billingsmt.gov
Your Solar Permit checklist for Billings
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: billingsmt.gov: Building.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Billings permit portal.
- Keep the office details handy. City of Billings Building Division. Phone: (406) 657-8270. Email: permits@billingsmt.gov. Address: 316 N 26th St, 5th Floor, Billings, MT 59101.
Compiled from the official sources on this page. Last checked .
What else needs a permit in Billings
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Finish work versus construction, plumbing or electrical changes | Building permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000 |
| Deck Permit | Permit required | Any size | Building permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000 |
| Electrical Permit | Permit required | Any size | See schedule |
| EV Charger Permit | Permit required | Any size | Billings's residential electrical fees are flat items (for example, interior rewire only or new addition to home $40.00); the schedule has the rest |
| Fence Permit | It depends | Fence height measured from the top rail, board or wire to the ground inside the fence; Planning Division fence permit above 36 inches, and a building permit as well above 6 feet | See schedule |
| HVAC Permit | Permit required | Any size | Mechanical Permit Fees (April 23, 2026): $15.00 for the issuance of each permit (minimum total on each permit); the schedule has the rest |
| Plumbing Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | Permit required | Any size | Building permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000 |
| Shed Permit | It depends | Floor area of a detached shed | Above the exemption a shed takes a building permit priced by valuation |
| Water Heater Permit | Permit required | Any size | Plumbing Permit Fees (PDF dated April 23, 2026, read from the image): $20.00 issuance minimum per permit plus $7.00 'For each water heater and/or vent' |
Frequently asked questions
- Do you need a solar permit in Billings?
- Yes, before installing a solar PV system. If you are unsure how that applies to your project, call the City of Billings Building Division at (406) 657-8270 before you start.
- How much does a solar permit cost in Billings?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the City of Billings Building Division at (406) 657-8270.
- Where do you apply for a solar permit in Billings?
- You can apply through the Billings permit portal or contact the City of Billings Building Division directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Billings?
- Under Montana law (MCA 37-45-104(13); 37-68-103(3); 37-69-102(1)(a); 50-60-506(4)): Montana's construction contractor license law does not apply to an owner working on the owner's own property, occupied or not, unless the owner builds to promptly sell, and even then the exemption holds if the owner has lived there as a primary residence for at least the last 12 months (MCA 37-45-104(13)). An individual needs no electrician's license to do electrical work on the individual's own property or residence kept for the individual's own use, except work on a grid-tied generator (MCA 37-68-103(3)); the state issues a homeowner electrical permit for this, with state inspections. An owner of a single-family residence used only for the owner's personal use may install all sanitary plumbing and potable water piping without a plumbing license (MCA 37-69-102(1)(a)) and, where the state has jurisdiction, without a state plumbing permit (MCA 50-60-506(4)). Certified local jurisdictions may still require their own building permits. Confirm how Billings applies this before you apply.
From the Library
Everything above, sourced
How this solar permit page for Billings was verified. 2 official sources: billingsmt.gov, bsd.dli.mt.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Billings Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page