Montana / Billings

Plumbing Permit in Billings, Montana

Permit required

Yes, a permit is required

Before installing, altering or repairing plumbing or gas piping.

Quick answer

Billings issues its own plumbing and gas permits inside city limits (the state lists it as certified for plumbing). A homeowner may do plumbing in their own home without a license but must first get the permit, and an appliance dealer's minor plumbing incidental to installing an appliance it sold also needs a permit pulled by the dealer. Contractors need a state plumbing or construction contractor license plus the city business tax.

Issued by
City of Billings Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a plumbing permit costs in Billings

Fee schedule in force
Official scheduleRead .

Plumbing Permit Fees (PDF dated April 23, 2026, figures read from the image): $20.00 for the issuance of each permit (minimum total on each permit), plus $7.00 for each plumbing fixture or trap, $7.00 for each water heater and/or vent, $5.00 for each gas-piping system of one to five outlets, and $7.00 for installation, alteration or repair of water piping.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Billings

General guide, not specific to this office

What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Billings Building Division

What else needs a permit in Billings

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work versus construction, plumbing or electrical changesBuilding permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000
Deck PermitPermit requiredAny sizeBuilding permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeBillings's residential electrical fees are flat items (for example, interior rewire only or new addition to home $40.00); the schedule has the rest
Fence PermitIt dependsFence height measured from the top rail, board or wire to the ground inside the fence; Planning Division fence permit above 36 inches, and a building permit as well above 6 feetSee schedule
HVAC PermitPermit requiredAny sizeMechanical Permit Fees (April 23, 2026): $15.00 for the issuance of each permit (minimum total on each permit); the schedule has the rest
Roof Replacement PermitPermit requiredAny sizeBuilding permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000
Shed PermitIt dependsFloor area of a detached shedAbove the exemption a shed takes a building permit priced by valuation
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizePlumbing Permit Fees (PDF dated April 23, 2026, read from the image): $20.00 issuance minimum per permit plus $7.00 'For each water heater and/or vent'

Frequently asked questions

Do you need a plumbing permit in Billings?
Yes, before installing, altering or repairing plumbing or gas piping. If you are unsure how that applies to your project, call the City of Billings Building Division at (406) 657-8270 before you start.
How much does a plumbing permit cost in Billings?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the City of Billings Building Division at (406) 657-8270.
Where do you apply for a plumbing permit in Billings?
You can apply through the Billings permit portal or contact the City of Billings Building Division directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Billings?
Under Montana law (MCA 37-45-104(13); 37-68-103(3); 37-69-102(1)(a); 50-60-506(4)): Montana's construction contractor license law does not apply to an owner working on the owner's own property, occupied or not, unless the owner builds to promptly sell, and even then the exemption holds if the owner has lived there as a primary residence for at least the last 12 months (MCA 37-45-104(13)). An individual needs no electrician's license to do electrical work on the individual's own property or residence kept for the individual's own use, except work on a grid-tied generator (MCA 37-68-103(3)); the state issues a homeowner electrical permit for this, with state inspections. An owner of a single-family residence used only for the owner's personal use may install all sanitary plumbing and potable water piping without a plumbing license (MCA 37-69-102(1)(a)) and, where the state has jurisdiction, without a state plumbing permit (MCA 50-60-506(4)). Certified local jurisdictions may still require their own building permits. Confirm how Billings applies this before you apply.

From the Library

Everything above, sourced

How this plumbing permit page for Billings was verified. 2 official sources: billingsmt.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Billings Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project