Shed Permit in Billings, Montana

It depends

Sometimes, depending on the project

Before building a detached shed larger than 200 square feet.

Quick answer

The Building Division lists detached sheds not exceeding 200 square feet among the items that do not require a building permit; a larger shed needs one, applied for through CityView as a 'New Accessory Structure'. Zoning setbacks for accessory structures still apply to exempt sheds.

Diagram of the 200 sq ft footprint area threshold for a shed permit in Billings, Montana
Threshold illustrated: 200 sq ft. Whether Billings requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-11-08.
Typical threshold
Floor area of a detached shed
Issued by
City of Billings Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a shed permit costs in Billings

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
  • Above the exemption a shed takes a building permit priced by valuation.
  • Building permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000;
  • $45.00 for $1,001 to $2,000;
  • $45.00 for the first $2,000 plus $9.00 for each additional $1,000 or fraction up to $25,000;
  • $252.00 for the first $25,000 plus $6.00 for each additional $1,000 or fraction up to $50,000.
  • Fees are charged on the higher of the bid price or the Building Safety Journal valuation table.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Billings

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Billings Building Division

What else needs a permit in Billings

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work versus construction, plumbing or electrical changesBuilding permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000
Deck PermitPermit requiredAny sizeBuilding permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeBillings's residential electrical fees are flat items (for example, interior rewire only or new addition to home $40.00); the schedule has the rest
Fence PermitIt dependsFence height measured from the top rail, board or wire to the ground inside the fence; Planning Division fence permit above 36 inches, and a building permit as well above 6 feetSee schedule
HVAC PermitPermit requiredAny sizeMechanical Permit Fees (April 23, 2026): $15.00 for the issuance of each permit (minimum total on each permit); the schedule has the rest
Plumbing PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitPermit requiredAny sizeBuilding permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizePlumbing Permit Fees (PDF dated April 23, 2026, read from the image): $20.00 issuance minimum per permit plus $7.00 'For each water heater and/or vent'

Frequently asked questions

Do you need a shed permit in Billings?
It depends on the project. Floor area of a detached shed. If you are unsure how that applies to your project, call the City of Billings Building Division at (406) 657-8270 before you start.
How much does a shed permit cost in Billings?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the City of Billings Building Division at (406) 657-8270.
How long does a shed permit take in Billings?
Initial review for residential (single-family and duplex) takes 4-7 business days once a complete plan is submitted, per the Building Division FAQ. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in Billings?
You can apply through the Billings permit portal or contact the City of Billings Building Division directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Billings?
Under Montana law (MCA 37-45-104(13); 37-68-103(3); 37-69-102(1)(a); 50-60-506(4)): Montana's construction contractor license law does not apply to an owner working on the owner's own property, occupied or not, unless the owner builds to promptly sell, and even then the exemption holds if the owner has lived there as a primary residence for at least the last 12 months (MCA 37-45-104(13)). An individual needs no electrician's license to do electrical work on the individual's own property or residence kept for the individual's own use, except work on a grid-tied generator (MCA 37-68-103(3)); the state issues a homeowner electrical permit for this, with state inspections. An owner of a single-family residence used only for the owner's personal use may install all sanitary plumbing and potable water piping without a plumbing license (MCA 37-69-102(1)(a)) and, where the state has jurisdiction, without a state plumbing permit (MCA 50-60-506(4)). Certified local jurisdictions may still require their own building permits. Confirm how Billings applies this before you apply.

From the Library

Everything above, sourced

billingsmt.gov: Faqread

How this shed permit page for Billings was verified. 2 official sources: billingsmt.gov, billingsmt.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Billings Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project