Patio Permit in Billings, Montana
Not confirmed
We could not confirm this
Quick answer
Billings does not publish a rule for an uncovered, at-grade patio. Its FAQ exempts sidewalks and driveways that will not support a structure and are entirely on private property, but never mentions patios; a covered patio is handled as a structure with its own submittal workbook.
- Issued by
- City of Billings Building Division
- Phone
- (406) 657-8270
Applying yourself? Start with the office.
What a patio permit costs in Billings
- Permit fee
- Not published
- Fee schedule in force
- Official scheduleRead .
Billings publishes no fee for this permit type in a schedule we can verify. Ask City of Billings Building Division how the fee is calculated for your project.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
Where to ask in Billings
We could not confirm the rule, so start with the office's own pages or call the number below.
City of Billings Building Division
- 316 N 26th St, 5th Floor, Billings, MT 59101
- Phone: (406) 657-8270
- Email: permits@billingsmt.gov
What else needs a permit in Billings
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Finish work versus construction, plumbing or electrical changes | Building permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000 |
| Deck Permit | Permit required | Any size | Building permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000 |
| Electrical Permit | Permit required | Any size | See schedule |
| EV Charger Permit | Permit required | Any size | Billings's residential electrical fees are flat items (for example, interior rewire only or new addition to home $40.00); the schedule has the rest |
| Fence Permit | It depends | Fence height measured from the top rail, board or wire to the ground inside the fence; Planning Division fence permit above 36 inches, and a building permit as well above 6 feet | See schedule |
| HVAC Permit | Permit required | Any size | Mechanical Permit Fees (April 23, 2026): $15.00 for the issuance of each permit (minimum total on each permit); the schedule has the rest |
| Plumbing Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | Permit required | Any size | Building permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1 to $1,000 |
| Shed Permit | It depends | Floor area of a detached shed | Above the exemption a shed takes a building permit priced by valuation |
| Solar Permit | Permit required | Any size | See schedule |
| Water Heater Permit | Permit required | Any size | Plumbing Permit Fees (PDF dated April 23, 2026, read from the image): $20.00 issuance minimum per permit plus $7.00 'For each water heater and/or vent' |
Frequently asked questions
- Do you need a patio permit in Billings?
- We could not confirm the patio permit rule on an official Billings page, so this page gives no yes or no. Call the City of Billings Building Division at (406) 657-8270 before you start.
- How much does a patio permit cost in Billings?
- We found no published fee for a patio permit in Billings. To learn how it is calculated for your project, call the City of Billings Building Division at (406) 657-8270.
- Where do you apply for a patio permit in Billings?
- You can apply through the Billings permit portal or contact the City of Billings Building Division directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Billings?
- Under Montana law (MCA 37-45-104(13); 37-68-103(3); 37-69-102(1)(a); 50-60-506(4)): Montana's construction contractor license law does not apply to an owner working on the owner's own property, occupied or not, unless the owner builds to promptly sell, and even then the exemption holds if the owner has lived there as a primary residence for at least the last 12 months (MCA 37-45-104(13)). An individual needs no electrician's license to do electrical work on the individual's own property or residence kept for the individual's own use, except work on a grid-tied generator (MCA 37-68-103(3)); the state issues a homeowner electrical permit for this, with state inspections. An owner of a single-family residence used only for the owner's personal use may install all sanitary plumbing and potable water piping without a plumbing license (MCA 37-69-102(1)(a)) and, where the state has jurisdiction, without a state plumbing permit (MCA 50-60-506(4)). Certified local jurisdictions may still require their own building permits. Confirm how Billings applies this before you apply.
From the Library
Everything above, sourced
What was checked for this patio permit page for Billings. The rule itself is not confirmed. 1 official source: billingsmt.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Billings Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page