Guide
How Much Is a Plumbing Permit? Three Jobs Priced on Nine Fee Schedules
A residential plumbing permit ran from $35 to $218 for the same bathroom remodel on eight of nine fee schedules read on November 18, 2026, and a whole-house repipe can cost a flat $75 in one county and hundreds on a cost-based schedule. How flat, per-fixture and cost-based schedules price a water heater swap, a bathroom and a repipe, worked out line by line.
Somewhere between about $35 and a few hundred dollars for an ordinary residential job, and the job matters as much as the city. On the eight of nine fee schedules read today that price it, the permit for the same bathroom remodel (a new toilet, sink and tub) ran from $35 in Boston to $218 in Seattle and King County. A water heater swap ran from $35 in Fargo, North Dakota, to $130 in Hillsborough County, Florida. Repiping a house is where schedules split hardest: a flat $75 trade permit in Wake County, North Carolina, and, on the face of Jacksonville’s schedule, $11 for every $100 the work costs.
- Water heater replacement
- $35 to $1307 schedules with a clear line
- Bathroom, three fixtures
- $35 to $2188 schedules
- Whole-house repipe
- $75 flat to cost-basedWake County, NC; Jacksonville, FL
- Method on 6 of the 9
- Per fixture or itemBoston, Kentucky, Jacksonville (new work), Seattle and King County, Portland, Fargo
- Schedules read
- November 18, 2026
To get your own number, count what the plumber will install or replace, then ask your office: “For a residential plumbing permit covering [list: e.g., one toilet, one lavatory, one tub, one water heater], what is the total fee, including any base, technology or state fees?” Fee schedules print the rates; only the office or the online calculator gives the total.
Three ways offices price a plumbing permit
Flat, whatever the job. Wake County charges one “Residential Trade Permit Fee - $75,” and “The $75 permit fee is a single permit fee for electrical, mechanical and plumbing, regardless of number of trades involved.” Hillsborough County, Florida, charges $130.00 for a residential “Plumbing (General)” trade permit, which covers jobs that need inspections but no plan review. Aurora, Colorado, sets one flat price per job type: “Water Heater Replacement” in its $99 group, “Tankless Water Heater” at $287.
A base fee plus each fixture. Boston: “$20.00 Primary fee plus $5.00 each fixture.” Kentucky’s state plumbing rule, which Louisville and Lexington follow: “fifty (50) dollars plus fourteen (14) dollars for each” fixture, appliance or opening, and each domestic water heater. Seattle and King County’s Public Health program: “$137 plus $27 per Fixture.” Portland, Oregon, prices fixtures individually at $63.00 each, from a water closet to a water heater. Fargo, North Dakota, includes up to five fixtures in its $50.00 minimum and charges $10.00 for each one over five.
By the cost of the work. Jacksonville uses both methods: its schedule charges $11.00 per fixture for new work, but for “Repairs-extending, remodeling, addition to or repair of water pipes, waste, soil, vent, building drain or sewer pipe” it charges $11.00 “for each $100 estimated cost or fractional part thereof,” with a $60.00 minimum for any plumbing permit.
Three jobs, priced line by line
These totals are our arithmetic on each schedule’s printed lines, for one- and two-family homes. They leave out plan review, technology and state surcharges where a schedule prints them separately, so treat each as the floor, not the bill.
| Office | Water heater replacement | Bathroom: toilet, sink, tub | Whole-house repipe |
|---|---|---|---|
| Boston, MA | (not computed) | $35 ($20 + 3 x $5) | per fixture |
| Kentucky (Louisville, Lexington) | $50 (one water heater only) | $92 ($50 + 3 x $14) | possibly the $50 base alone; ask |
| Jacksonville, FL | $60 (the minimum; one fixture is $11) | $60 (the minimum; three fixtures are $33) | $11 per $100 of cost |
| Seattle and King County, WA | (not computed) | $218 ($137 + 3 x $27) | supplemental fee, by inspections |
| Fargo, ND | $35 (water heating permit) | $50 (up to five fixtures) | (not printed) |
| Wake County, NC | $75 | $75 | $75 |
| Hillsborough County, FL | $130 | $130 | $130 |
| Portland, OR | $63 | $189 (3 x $63) | $128 first floor, $52 each added floor |
| Aurora, CO | $99 ($287 if tankless) | (not on the flat-rate list) | (not on the flat-rate list) |
Kentucky’s regulation has its own water heater rule: “If only one (1) new domestic water heater is installed or replaced within a single building, the only fee for the plumbing permit shall be fifty (50) dollars.” It also limits the fee to the base “if: (a) The work to be performed does not include new installation,” so a replacement-only job may come in at $50; ask the inspector. We did not compute Boston’s or Seattle and King County’s water heater fee because neither schedule says whether a water heater counts as one “fixture” in its formula; ask. Portland’s per-item rates are before the 12 percent Oregon state surcharge the city’s electrical page says is assessed on all permit fees; ask whether it applies to plumbing. Aurora collects city use tax on materials on top of its flat fees. Portland’s schedule prints the per-item rates we used, but we found no residential minimum on the lines we read, so confirm the total with the city.
The repipe is where the method bites
On a per-fixture or flat schedule, replacing every supply line in a two-story house costs about what a bathroom does: Portland’s line for replacing in-building water supply lines is $128.00 for the first floor and $52.00 for each additional floor, so $180 for two floors, and Wake County’s and Hillsborough County’s flat trade fees do not change. On Jacksonville’s repair line, the same job is priced by its cost: a repipe quoted at $6,000 would be 60 units of $11.00, or $660, on the face of that line. Ask the office which line it applies to a repipe before you compare quotes. Seattle and King County add a supplemental fee to repipes “based upon the number of anticipated inspections multiplied by the program hourly operating rate,” calculated on its R20 worksheet; the program’s hourly rate for plan review is $273. Our guide to repiping permits covers the rest of that job.
Fees you do not see on the schedule
- Surcharges. Several schedules add technology, state or administrative fees outside the line items; Portland’s electrical page, for one, says a 12 percent Oregon state surcharge is assessed on its electrical permits.
- Work started before the permit. Seattle and King County’s “Already Built Construction (ABC) Permit” is “$273 plus $55 per Fixture/Outlet,” roughly double its regular rates. Our guide to after-the-fact permit fees covers the penalties elsewhere.
- Re-inspections. Seattle and King County charge $137 for a re-inspection.
- Who files. In some offices only a licensed plumber may file, so the fee is billed through the plumber’s invoice; our guide to whether a homeowner can pull a plumbing permit covers where you can file yourself.
Why the same job costs six times as much
A flat fee prices the inspection visit; a fixture fee prices the size of the system; a cost-based fee prices the size of the contract. None of the nine schedules we read says what an inspection costs the office to perform, so the spread says more about how each office chose to recover its costs than about how much work your job is. Our guide to why permit costs vary goes into those choices.
Method
All nine schedules were read on their official sites on November 18, 2026; every rate above is printed on them, and every total is our arithmetic on those rates for the job described. Boston’s schedule is the one the city posts, dated May 15, 2023; Fargo’s took effect January 1, 2025, Hillsborough County’s October 5, 2024, Seattle and King County’s January 1, 2026, Portland’s July 10, 2026, and Kentucky’s is the state regulation in force. Where a schedule leaves a job’s classification open, the table says so instead of guessing. For your own office’s plumbing fee, see its plumbing permit page on this site, which shows when the fee note was last read.
How Much Is a Plumbing Permit? Three Jobs Priced on Nine Fee Schedules: figures as of 28 Sep 2026, 137 jurisdictions. Now 178.
Sources
- City of Boston Inspectional Services fee schedule (posted 5/15/23): plumbing, $20.00 primary fee plus $5.00 each fixture. (accessed )
- 815 KAR 20:050 Section 4, Kentucky plumbing permit fees: $50 base for one- and two-family units plus $14 for each fixture, appliance, opening and domestic water heater. (accessed )
- City of Jacksonville City Fees, Plumbing Permit Fees, Section 320.409: $11.00 per fixture, $11.00 per $100 of estimated cost for piping repairs, $60.00 minimum. (accessed )
- Public Health Seattle and King County, Plumbing and Gas Piping Program fees effective January 1, 2026: $137 plus $27 per fixture; repipe supplemental fee; already built construction permit. (accessed )
- City of Fargo, Schedule for Plumbing and Sanitary or Storm Sewer Permits, effective January 1, 2025: water heating $35.00, inside plumbing $50.00 minimum including up to 5 fixtures. (accessed )
- Wake County, North Carolina, Permits and Inspections fee schedule: residential trade permit fee $75 for all trades. (accessed )
- Hillsborough County, Florida, Building Permit Fee Schedule effective October 5, 2024: residential Plumbing (General) trade permit $130.00. (accessed )
- City of Portland, Oregon, Plumbing Permit Fee Schedule effective July 10, 2026: $63.00 per fixture or item; replacing in-building water supply lines, residential, $128.00 first floor and $52.00 each additional floor. (accessed )
- City of Aurora, Colorado, 2026 Flat Rate Fee Permits: water heater replacement $99, tankless water heater $287. (accessed )
Get rule-change alerts
We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.
We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.