Solar Permit in Pinellas County, Florida

Permit required

Yes, a permit is required

Before installing any residential solar photovoltaic system

Confirmed on official page Verified

Issued byPinellas County Building and Development Review Services

By Mario Bailey, verified against official sources

Quick answer

A permit is required for residential solar photovoltaic installations in unincorporated Pinellas County; Photovoltaic is a listed Solar permit subtype in the Access Portal. Electrical work, which solar installation necessarily involves, is explicitly excluded from Florida's new HB 803 $7,500 permit exemption, so no small-project exemption applies. NEC Article 690 wiring review and structural or wind-uplift review apply as in other Florida jurisdictions.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before installing any residential solar photovoltaic system

What a solar permit costs in Pinellas County

Line item
solar permitBy formulaFlat fee by system type: photovoltaic systems $250 each, solar domestic water heating $335, solar pool or spa heating $250, each including building, plan review and electrical, per Combination Permits IV-I of the FY26 BDRS schedule.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Pinellas County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alachua CountyPermit requiredNo solar-specific flat fee is published
Brevard CountyPermit requiredBrevard's Residential Solar Photovoltaic Permit Application fee table lists a...
Charlotte CountyPermit requiredAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if...
Collier CountyPermit requiredFee Schedule (Resolution 2025-231, effective January 1, 2026), Solar Permit...
Hernando CountyPermit requiredPhotovoltaic System (Res): $180.00
Hillsborough CountyPermit requiredResidential Photovoltaic trade permit fee is $250 flat, inspection-only with...
Pinellas Countythis pagePermit requiredFlat fee by system type: photovoltaic systems $250 each, solar domestic water...

How to apply in Pinellas County

In Pinellas County, a rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit.

What most solar permit applications include:

  • Both a building permit and a separate electrical permit are required, since the array must be designed and installed to the residential code's solar provisions and to the National Electrical Code (IRC R324.3).
  • For Pinellas County, the plan set identifies listed equipment: PV modules listed to UL 1703 (or both UL 61730-1 and UL 61730-2), and inverters listed to UL 1741, with grid-tied inverters listed for utility interaction (IRC R324.3.1).
  • Structural drawings show that the roof framing is designed to structurally support the array and withstand the gravity loads it adds (IRC R324.4.1).
  • For Pinellas County, the site plan lays out roof access pathways at least 36 inches wide, plus a ridge setback sized to how much of the roof the array covers, so firefighters retain pathways and ventilation access (IRC R324.6.1, IRC R324.6.2).
  • For Pinellas County, the one line electrical diagram shows the rapid shutdown method and the location of its single initiation device, since one control point must bring all system conductors down to safe levels (NEC 690.12, NEC 690.56(C)).
  • Interconnecting the array to the utility grid at a defined point of connection is a separate application process from the local building or electrical permit and must be approved before the system can operate (NEC 705.12).
  • Some permitting offices route applications through SolarAPP+, an automated review platform that checks the plan set against code requirements and issues eligible permits instantly (DOE SolarAPP+).

General submittal guidance from IRC 2021 R324 (Solar Energy Systems) and NEC 2020 Article 690 (Solar Photovoltaic Systems) and Article 705 (Interconnected Power Production Sources). Source. Pinellas County Building and Development Review Services sets the exact checklist for Pinellas County.

Where to apply in Pinellas County:

Pinellas County Building and Development Review Services

Solar Permit in Pinellas County compared with nearby Florida localities

LocalityPermit needed?ThresholdWhat each Florida schedule saysVerified
Pinellas CountyPermit requiredNot specifiedFlat fee by system type: photovoltaic systems $250 each, solar domestic water heating...
Alachua CountyPermit requiredNot specifiedNo solar-specific flat fee is published
Brevard CountyPermit requiredNot specifiedBrevard's Residential Solar Photovoltaic Permit Application fee table lists a Building...
Broward CountyPermit requiredNot specifiedNot published
Charlotte CountyPermit requiredNot specifiedAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation...

Inspections and closing out your permit

In Pinellas County, inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.

  1. In Pinellas County: where an agency runs a rough or pre-inspection, it checks the array's roof penetrations while they are still exposed, confirming they are flashed and sealed (IRC R324.4.3).
  2. In Pinellas County: the inspector confirms whether rapid shutdown is required, how it is accomplished, and that it is properly identified (NEC 690.12, NEC 690.56(C)).
  3. In Pinellas County: pV disconnecting means must be permanently marked and installed where they are readily accessible, which the inspector confirms in the field (NEC 690.13).
  4. In Pinellas County: bonding and grounding of the array, including every exposed non current carrying metal part and the grounding electrode system, is checked before sign off (NEC 690.43, NEC 690.47).
  5. In Pinellas County: at the service equipment, the inspector looks for the required rapid shutdown placard, a labeled diagram showing the initiation device's location in the specified colors and letter sizes (NEC 690.56(C)).
  6. In Pinellas County: utility interconnection is inspected and approved separately from the local building department's sign off, and the system cannot be energized until both approvals are in hand (NEC 705.12).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Pinellas County permit portal or by phone at (727) 464-3888.

Inspection sequence from NEC 2020 Article 690 (690.12 rapid shutdown, 690.13 disconnects, 690.43/690.47 grounding, 690.56 labeling) and IRC 2021 R324.4.3 (roof penetrations). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a solar permit in Pinellas County?
A permit is required for residential solar photovoltaic installations in unincorporated Pinellas County; Photovoltaic is a listed Solar permit subtype in the Access Portal. Electrical work, which solar installation necessarily involves, is explicitly excluded from Florida's new HB 803 $7,500 permit exemption, so no small-project exemption applies. NEC Article 690 wiring review and structural or wind-uplift review apply as in other Florida jurisdictions. Always confirm with the Pinellas County Building and Development Review Services before starting.
How much does a solar permit cost in Pinellas County?
Flat fee by system type: photovoltaic systems $250 each, solar domestic water heating $335, solar pool or spa heating $250, each including building, plan review and electrical, per Combination Permits IV-I of the FY26 BDRS schedule. See the official fee schedule for current amounts.
Where do you apply for a solar permit in Pinellas County?
You can apply through the Pinellas County permit portal or contact the Pinellas County Building and Development Review Services directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Pinellas County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Pinellas County applies this before you apply.

From the Library

What else needs a permit in Pinellas County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedNo dedicated deck line
Electrical PermitPermit requiredNot specifiedNo flat generic electrical line
Fence PermitIt dependschain-link, wood, and vinyl fences generally need no building permit, though a zoning clearance may be required in certain conditions such as pool safety barriers or corner-lot sight triangles; masonry fences, retaining walls, seawalls, and fences over 6 ft are handled as separate building-permit typesFences of chain link, vinyl or wood 6 feet or less need no building permit
HVAC PermitPermit requiredNot specifiedMechanical Stand Alone fees are tiered: $140 for an equal AC changeout, more with...
Patio PermitPermit requiredNot specifiedOpen flatwork patios are permit-exempt
Plumbing PermitPermit requiredNot specifiedNo flat generic plumbing line
Pool PermitPermit requiredNot specified$550 base covers building, electric and plan review for a pool, spa or hot tub with deck...
Roof Replacement PermitIt dependsnon-structural roof work (e.g. roof covering only, not sheathing or framing) with a total project value under $7,500 on a single-family home outside a flood hazard area may qualify for a written permit-exemption approval from the County Building Official instead of a standard permit; structural roof work, any work on a flood-zone property, or any project at or above $7,500 requires a standard roofing permit$180 covers the first 20 squares of a residential reroof plus $1.50 per additional...
Shed PermitIt dependssheds under 100 sq ft and no taller than 10 ft, not connected to utilities, need no permit; sheds 100 sq ft or larger, taller than 10 ft, or connected to utilities require a building permitSheds under 100 sq ft with no utilities are permit-exempt

Solar Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Pinellas County documents; the office above sets the local rules.

How this solar permit page for Pinellas County was verified. 3 official sources: pinellas.gov, pinellas.gov, leg.state.fl.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Pinellas County Building and Development Review Services. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Solar Permit requirements across Florida localities

Solar permit rules nationwide

Look up an existing Pinellas County permit record

Permit required
Get quotes