Permit records

Pinellas County permit search

Pinellas County permit records are public. The jurisdiction publishes them through an online record search.

By Mario Bailey Last checked · 10 official sources

Project types verified
10
in Pinellas County
Search verified
12 Jul 2026
we opened it ourselves
The Pinellas County permit portal search screen
The Pinellas County permit portal as we captured it on .

If the permit does not turn up

Older permits are often missing from online records, and a permit filed under a contractor's name will not surface in an address search that expects the owner. Pinellas County Building and Development Review Services can check the paper file.

What needs a permit in Pinellas County

Every project type we have verified in Pinellas County, with the rule, the threshold, and the fee that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedNo dedicated deck line
Electrical PermitPermit requiredNot specifiedNo flat generic electrical line
Fence PermitIt dependschain-link, wood, and vinyl fences generally need no building permit, though a zoning clearance may be required in certain conditions such as pool safety barriers or corner-lot sight triangles; masonry fences, retaining walls, seawalls, and fences over 6 ft are handled as separate building-permit typesFences of chain link, vinyl or wood 6 feet or less need no building permit
HVAC PermitPermit requiredNot specifiedMechanical Stand Alone fees are tiered: $140 for an equal AC changeout, more with...
Patio PermitPermit requiredNot specifiedOpen flatwork patios are permit-exempt
Plumbing PermitPermit requiredNot specifiedNo flat generic plumbing line
Pool PermitPermit requiredNot specified$550 base covers building, electric and plan review for a pool, spa or hot tub with deck...
Roof Replacement PermitIt dependsnon-structural roof work (e.g. roof covering only, not sheathing or framing) with a total project value under $7,500 on a single-family home outside a flood hazard area may qualify for a written permit-exemption approval from the County Building Official instead of a standard permit; structural roof work, any work on a flood-zone property, or any project at or above $7,500 requires a standard roofing permit$180 covers the first 20 squares of a residential reroof plus $1.50 per additional...
Shed PermitIt dependssheds under 100 sq ft and no taller than 10 ft, not connected to utilities, need no permit; sheds 100 sq ft or larger, taller than 10 ft, or connected to utilities require a building permitSheds under 100 sq ft with no utilities are permit-exempt
Solar PermitPermit requiredNot specifiedFlat fee by system type: photovoltaic systems $250 each, solar domestic water heating...

Everything we have verified about permits in Pinellas County