Pool Permit in Denver, Colorado
Permit required
Yes, a permit is required
Before constructing any permanent residential swimming pool spa or water feature
Issued byCity and County of Denver Community Planning and Development
By Mario Bailey, verified against official sources
Quick answer
Permanent residential swimming pools in Denver require a building permit, a zoning permit, and a Sewer Use and Drainage Permit (SUDP). Temporary above-ground pools removed at the end of the season do not require permits. Additional trade permits for electrical, plumbing, and mechanical work may also be needed.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.
Compare pool builder quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before constructing any permanent residential swimming pool spa or water feature
What a pool permit costs in Denver
How Denver compares in Colorado
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Aurora | It depends | pool depth at which a building permit is required |
| Denverthis page | Permit required | Not specified |
| Jefferson County | Permit required | A Miscellaneous Permit is required for swimming pools of any size, in-ground or above-ground, and related structures such as diving boards and ladders; hot tubs and swim spas do not need this permit. Any electrical work for the pool needs a separate Building Safety electrical permit. |
How to apply in Denver
In Denver, a residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.
What most pool permit applications include:
- Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
- For Denver, the site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
- For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
- For Denver, a barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
- Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
- For Denver, the electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).
General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. City and County of Denver Community Planning and Development sets the exact checklist for Denver.
Where to apply in Denver:
City and County of Denver Community Planning and Development
- 201 W. Colfax Ave., Dept. 205, Denver, CO 80202
- Phone: 720-865-2720
- Email: planreview@denvergov.org
Pool Permit in Denver compared with nearby Colorado localities
| Locality | Permit needed? | Threshold | What each Colorado schedule says | Verified |
|---|---|---|---|---|
| Denver | Permit required | Not specified | No pool-specific fee line | |
| Aurora | It depends | pool depth at which a building permit is required | There is no swimming pool or spa line item on the 2026 flat-rate schedule (Form #A175... | |
| Jefferson County | Permit required | A Miscellaneous Permit is required for swimming pools of any size, in-ground or above-ground, and related structures such as diving boards and ladders; hot tubs and swim spas do not need this permit. Any electrical work for the pool needs a separate Building Safety electrical permit. | Pools of any size need a Miscellaneous Permit priced at $90 on the 2026 zoning fee table... |
Inspections and closing out your permit
In Denver, pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
- In Denver: before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
- In Denver: a bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
- In Denver: a temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
- In Denver: a pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
- In Denver: at final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Denver permit portal or by phone at 720-865-2720.
Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Pool Permit checklist for Denver
- Confirm the requirement. Yes, a permit is required. Usually needed: Before constructing any permanent residential swimming pool spa or water feature.
- Budget the fee. No pool-specific fee line; pool construction is a standard valuation-based building permit under CPD Table 1 with a $20 minimum, with plumbing and electrical trade work permitted and charged separately. Official fee schedule.
- Apply. In Denver, a residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect. Start at the Denver permit portal.
- Keep the office details handy. City and County of Denver Community Planning and Development. Phone: 720-865-2720. Address: 201 W. Colfax Ave., Dept. 205, Denver, CO 80202.
- Plan for inspections. In Denver, pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
Compiled from the official sources on this page. Last checked .
Permitting activity in Denver
In 2024, Denver authorized permits for 3,994 new residential housing units (872 single-family, 3,122 in multi-family buildings), valued at $788M, down from 5,725 the year before. That works out to about 5.4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 735,538.
About Denver
Denver has about 352,593 housing units. The median home is valued at $586,700, against a median household income of $91,681. About 49% of homes are owner-occupied, and the typical home was built around 1974.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a pool permit in Denver?
- Permanent residential swimming pools in Denver require a building permit, a zoning permit, and a Sewer Use and Drainage Permit (SUDP). Temporary above-ground pools removed at the end of the season do not require permits. Additional trade permits for electrical, plumbing, and mechanical work may also be needed. Always confirm with the City and County of Denver Community Planning and Development before starting.
- How much does a pool permit cost in Denver?
- No pool-specific fee line; pool construction is a standard valuation-based building permit under CPD Table 1 with a $20 minimum, with plumbing and electrical trade work permitted and charged separately. See the official fee schedule for current amounts.
- Where do you apply for a pool permit in Denver?
- You can apply through the Denver permit portal or contact the City and County of Denver Community Planning and Development directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Denver?
- Under Colorado law (C.R.S. 12-115-116(2); C.R.S. 12-115-120(11)(c); C.R.S. 12-155-118(2); C.R.S. 12-155-120(11)(c)): Colorado's state electrical law has a homeowner exception: under C.R.S. 12-115-116(2), you do not need an electrician's license to do electrical work on your own property or residence, as long as all the work, other than maintenance or repair of existing systems, is inspected under the state law. The exception does not apply if the property is intended for sale or resale by someone in the construction or remodeling business, is rental property, or is generally open to the public. A homeowner performing work on the homeowner's home is a qualified applicant who may pull the state electrical permit under C.R.S. 12-115-120(11)(c), and plumbing mirrors this: C.R.S. 12-155-118(2) allows unlicensed plumbing work on your own property or residence with the same carve-outs, and C.R.S. 12-155-120(11)(c) lets a homeowner pull the state plumbing permit. The State Electrical and Plumbing Boards at DORA require that the homeowner personally perform the work, that it be inspected before cover and again at completion, and that it meet the National Electrical Code or the adopted plumbing codes. Colorado has no statewide general contractor license: Title 12 licenses electricians and plumbers at the state level, and general building contractors are licensed, if at all, by the individual city or county. Confirm how Denver applies this before you apply.
From the Library
What else needs a permit in Denver
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | uncovered decks under 12 in off the ground require no permit; 12 in or more requires a zoning permit; 30 in or more also requires a building permit | Valuation-based building permit fee per CPD Table 1 with a $20 minimum for work valued... |
| Electrical Permit | Permit required | Not specified | Valuation-based fee per CPD Table 1 with a $20 minimum for work valued at $500 or less |
| Fence Permit | It depends | fences shorter than 4 ft require no permit; fences 4 ft or taller require at minimum a zoning permit; most fence types over 4 ft also require a building permit | Zoning construction permit fee with a $10 minimum for fences valued at $500 or less |
| HVAC Permit | Permit required | Not specified | Valuation-based fee per CPD Table 1 with a $20 minimum |
| Patio Permit | It depends | covered patios always require a zoning and building permit; uncovered ground-level patios may not require a permit | Valuation-based building permit fee per CPD Table 1 with a $20 minimum |
| Plumbing Permit | Permit required | Not specified | Valuation-based fee per CPD Table 1 with a $20 minimum |
| Roof Replacement Permit | Permit required | Not specified | Issued as a no-plan-review quick permit |
| Shed Permit | It depends | sheds up to 200 sq ft with 8 ft top plate and 14 ft max height do not require a building permit but may require a zoning permit in some zone districts | No building permit for one-story detached sheds up to 200 sq ft, 8 ft top plate and 14... |
| Solar Permit | Permit required | Not specified | $50 flat permit fee for the solar photovoltaic portion of a project with no plan review... |
Pool Permit in other Colorado localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Denver documents; the office above sets the local rules.
How this pool permit page for Denver was verified. 2 official sources: denvergov.org, denvergov.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City and County of Denver Community Planning and Development. Rules change; confirm before you build. How we verify.