Shed Permit in Little Rock, Arkansas
It depends
Sometimes, depending on the project
Before building a detached shed or playhouse over 200 square feet, or any shed taller than one story.
Issued byCity of Little Rock Planning and Development Department, Building Codes Division
By Mario Bailey, verified against official sources
Quick answer
Little Rock excludes from its building permit requirement a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use, provided its floor area does not exceed 200 square feet. A larger shed, or one over one story, needs a building permit. Wiring a shed of any size is electrical work, which always needs a City electrical permit.
Typical threshold: Floor area of a one-story detached tool or storage shed, playhouse or similar accessory structure.

Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before building a detached shed or playhouse over 200 square feet, or any shed taller than one story.
What a shed permit costs in Little Rock
How to apply in Little Rock
In Little Rock, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- For Little Rock, a written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- For Little Rock, a scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of Little Rock Planning and Development Department, Building Codes Division sets the exact checklist for Little Rock.
Where to apply in Little Rock:
City of Little Rock Planning and Development Department, Building Codes Division
- 723 West Markham Street, Little Rock, AR 72201
- Phone: (501) 371-4832
- Email: Permits@littlerock.gov
Inspections and closing out your permit
In Little Rock, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection in Little Rock: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection in Little Rock: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection in Little Rock: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- In Little Rock: for a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Little Rock permit portal or by phone at (501) 371-4832.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Little Rock
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: Floor area of a one-story detached tool or storage shed, playhouse or similar accessory structure. Usually needed: Before building a detached shed or playhouse over 200 square feet, or any shed taller than one story.
- Budget the fee. Building permit valued on the cost of the work ("Proper documentation, i.e., copy of contract or letter of affidavit from applicant, must be presented"); "Minimum fee for any building permit, except as otherwise specified, shall be fifty-one and 50/100 dollars ($51.50)" plus a $25.75 data processing fee per residential or commercial permit. Little Rock Code Sec. 8-31(c), as amended through Ord. No. 22,703 (December 16, 2025), read on Municode. The valuation table itself is not shown in the Municode text; the City's posted 2022 fee ordinance (Ord. No. 22,204) has since been amended, so its table figures are not repeated here. Official fee schedule.
- Apply. In Little Rock, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Little Rock permit portal.
- Keep the office details handy. City of Little Rock Planning and Development Department, Building Codes Division. Phone: (501) 371-4832. Address: 723 West Markham Street, Little Rock, AR 72201.
- Plan for inspections. In Little Rock, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a shed permit in Little Rock?
- Little Rock excludes from its building permit requirement a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use, provided its floor area does not exceed 200 square feet. A larger shed, or one over one story, needs a building permit. Wiring a shed of any size is electrical work, which always needs a City electrical permit. Floor area of a one-story detached tool or storage shed, playhouse or similar accessory structure. Always confirm with the office before starting.
- How much does a shed permit cost in Little Rock?
- Building permit valued on the cost of the work ("Proper documentation, i.e., copy of contract or letter of affidavit from applicant, must be presented"); "Minimum fee for any building permit, except as otherwise specified, shall be fifty-one and 50/100 dollars ($51.50)" plus a $25.75 data processing fee per residential or commercial permit. Little Rock Code Sec. 8-31(c), as amended through Ord. No. 22,703 (December 16, 2025), read on Municode. The valuation table itself is not shown in the Municode text; the City's posted 2022 fee ordinance (Ord. No. 22,204) has since been amended, so its table figures are not repeated here. See the official fee schedule for current amounts.
- Where do you apply for a shed permit in Little Rock?
- You can apply through the Little Rock permit portal or contact the City of Little Rock Planning and Development Department, Building Codes Division directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Little Rock?
- Under Arkansas law (Ark. Code 17-25-513(1), (2); 17-38-302(1); 17-28-101(9); 17-28-102(b); 17-28-305(b)(2); 17-25-101(a)(2)): Yes. A person building his or her own residence does not need a residential building contractor license unless they build more than one residence in a calendar year, and the owner of a single family residence may act as his or her own home improvement contractor (17-25-513(1)-(2)). Plumbing work done by a property owner in a building the owner owns and occupies as his or her home is exempt from plumber licensing unless a local ordinance requires a license (17-38-302(1)). The electrical licensing law does not require an individual to hold a license to do electrical work on his or her primary residence, defined as an unattached single-family dwelling, unless other state law or a local ordinance requires it, and a city or county may require the owner to show technical competency first (17-28-102(b), 17-28-305(b)(2)). These are licensing exemptions, not permit exemptions: the owner still needs whatever local permits apply. No state owner-builder disclosure form or resale restriction was found. Confirm how Little Rock applies this before you apply.
From the Library
What else needs a permit in Little Rock
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Painting, floor coverings, cosmetic changes and fixture trap or supply-line swaps are exempt; moving plumbing, any electrical work or work over $5,000 needs permits | Building permit (if required) on the valuation schedule with a $51.50 minimum |
| Deck Permit | Permit required | Any size | ...except as otherwise specified, shall be fifty-one and 50/100 dollars ($51.50)" plus... |
| Electrical Permit | Permit required | Any size | Repair/alteration/addition items, for example openings 1 to 20, $12.36 |
| EV Charger Permit | Permit required | Any size | ...special equipment, outdoor lighting or any circuits not already covered"... |
| Fence Permit | It depends | Height of a residential fence | ...subsection 8-3 l(c)(l)a." (the building permit valuation schedule), with a $51.50... |
| HVAC Permit | Permit required | Any size | ...for replacements, repairs, alterations and additions by total valuation: "$500.00... |
| Patio Permit | It depends | Value of the work, including material and labor | ...except as otherwise specified, shall be fifty-one and 50/100 dollars ($51.50)" plus... |
| Plumbing Permit | It depends | Clearing stoppages, temporary leak clamps, replacing a fixture trap or supply lines, and like-for-like gas appliance hookups are exempt; new or altered piping needs a permit | Repair/alteration items: "Each plumbing fixture outlet or appliance" $6.18 |
| Pool Permit | Permit required | Any size | ...8-31(c)(l)a., but minimum fee shall be fee of fifty-one and 50/100 dollars... |
| Roof Replacement Permit | No permit needed | Exempt | Not published |
| Solar Permit | Permit required | Any size | ...assessed on the building permit valuation schedule (Sec. 8-31(c)(1)n.), $51.50... |
| Water Heater Permit | Permit required | Any size | Plumbing permit line item "Water heater .....$17.51" (minimum plumbing permit $50.00) |
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Little Rock documents; the office above sets the local rules.
- IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC
- IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC
How this shed permit page for Little Rock was verified. 2 official sources: littlerock.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Little Rock Planning and Development Department, Building Codes Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page