EV Charger Permit in Little Rock, Arkansas
Permit required
Yes, a permit is required
Before installing a hardwired charger or a new circuit or receptacle for one.
Quick answer
Little Rock publishes nothing EV-specific; installing a charger circuit or a hardwired charger is electrical work, and the City requires an electrical permit for any electrical work. The permit is pulled by a licensed master electrician, or by a homeowner who holds a state master or journeyman electrician's license.
- Issued by
- City of Little Rock Planning and Development Department, Building Codes Division
- Phone
- (501) 371-4832
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an EV charger permit costs in Little Rock
- Fee schedule in force
- Official scheduleRead .
- Electrical permit;
- the schedule has no EV line, and a new charger circuit falls under "Miscellaneous. Special circuits such as window air conditioners, baseboard heaters, rectifiers, motion pictures machinery, x-ray machines, special equipment, outdoor lighting or any circuits not already covered" $18.54;
- minimum fee for an electrical permit $50.00.
- Little Rock Code Sec. 8-31(c), as amended through Ord. No. 22,703 (December 16, 2025), read on Municode.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Little Rock
General guide, not specific to this office
What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Little Rock Planning and Development Department, Building Codes Division
- 723 West Markham Street, Little Rock, AR 72201
- Phone: (501) 371-4832
- Email: Permits@littlerock.gov
Your EV Charger Permit checklist for Little Rock
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: littlerock.gov: divisions.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Little Rock permit portal.
- Keep the office details handy. City of Little Rock Planning and Development Department, Building Codes Division. Phone: (501) 371-4832. Email: Permits@littlerock.gov. Address: 723 West Markham Street, Little Rock, AR 72201.
Compiled from the official sources on this page. Last checked .
What else needs a permit in Little Rock
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Painting, floor coverings, cosmetic changes and fixture trap or supply-line swaps are exempt; moving plumbing, any electrical work or work over $5,000 needs permits | Building permit (if required) on the valuation schedule with a $51.50 minimum |
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | Permit required | Any size | Repair/alteration/addition items, for example openings 1 to 20, $12.36 |
| Fence Permit | It depends | Height of a residential fence | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | Value of the work, including material and labor | See schedule |
| Plumbing Permit | It depends | Clearing stoppages, temporary leak clamps, replacing a fixture trap or supply lines, and like-for-like gas appliance hookups are exempt; new or altered piping needs a permit | Repair/alteration items: "Each plumbing fixture outlet or appliance" $6.18 |
| Pool Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | No permit needed | Exempt | Not published |
| Shed Permit | It depends | Floor area of a one-story detached tool or storage shed, playhouse or similar accessory structure | See schedule |
| Solar Permit | Permit required | Any size | Solar panels are a miscellaneous permit assessed on the building permit valuation schedule (Sec. 8-31(c)(1)n.); the schedule has the rest |
| Water Heater Permit | Permit required | Any size | Plumbing permit line item "Water heater .....$17.51" (minimum plumbing permit $50.00) |
Frequently asked questions
- Do you need an EV charger permit in Little Rock?
- Yes, before installing a hardwired charger or a new circuit or receptacle for one. If you are unsure how that applies to your project, call the City of Little Rock Planning and Development Department, Building Codes Division at (501) 371-4832 before you start.
- How much does an EV charger permit cost in Little Rock?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 30 Oct 2026. For the figure on your own project, call the City of Little Rock Planning and Development Department, Building Codes Division at (501) 371-4832.
- Where do you apply for an EV charger permit in Little Rock?
- You can apply through the Little Rock permit portal or contact the City of Little Rock Planning and Development Department, Building Codes Division directly. The links are listed on this page.
- Can a homeowner pull an EV charger permit themselves in Little Rock?
- Under Arkansas law (Ark. Code 17-25-513(1), (2); 17-38-302(1); 17-28-101(9); 17-28-102(b); 17-28-305(b)(2); 17-25-101(a)(2)): Yes. A person building his or her own residence does not need a residential building contractor license unless they build more than one residence in a calendar year, and the owner of a single family residence may act as his or her own home improvement contractor (17-25-513(1)-(2)). Plumbing work done by a property owner in a building the owner owns and occupies as his or her home is exempt from plumber licensing unless a local ordinance requires a license (17-38-302(1)). The electrical licensing law does not require an individual to hold a license to do electrical work on his or her primary residence, defined as an unattached single-family dwelling, unless other state law or a local ordinance requires it, and a city or county may require the owner to show technical competency first (17-28-102(b), 17-28-305(b)(2)). These are licensing exemptions, not permit exemptions: the owner still needs whatever local permits apply. No state owner-builder disclosure form or resale restriction was found. Confirm how Little Rock applies this before you apply.
From the Library
Everything above, sourced
How this EV charger permit page for Little Rock was verified. 2 official sources: littlerock.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Little Rock Planning and Development Department, Building Codes Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page