The model code says 4 feet, measured from the bottom of the footing, unless the wall holds up a slope, a driveway or a fence. Offices draw the line anywhere from 4 feet down to every wall, and measure from different points: one 40-inch garden wall is exempt in Plano and Portland and needs a permit in Virginia, Rhode Island and Las Vegas. A worked example across named offices.

Under the model residential code, up to 4 feet, but measured from the bottom of the footing, not from the lawn, and only if nothing heavy sits behind it. The code exempts “Retaining walls that are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge” (as Plano, Texas, adopts it). A driveway, a slope or a building above the wall is a surcharge (Portland’s list), and some offices, such as Sacramento County, count a fence on top as one too; then any height needs a permit. Offices in our dataset draw it as low as 18 inches, and some permit every retaining wall, so the same wall can be exempt in one town and need a stamped design in the next.

Model code
Not over 4 ft, from the bottom of the footingand no surcharge
Virginia statewide
Under 3 ft of unbalanced fill
Rhode Island statewide
32 in from lower grade; 24 in for poured concrete
Pennsylvania statewide
Not over 4 ft from the lowest gradeunless surcharged
Lowest lines we found
18 in (St. Louis; Oklahoma City)as verified in our dataset
Any height
Arlington County VA, Durham, Grand Rapids, Manchester NH, San Bernardino Countyas verified in our dataset

Measure before you buy block. You need two numbers: the height of the exposed wall above the low side, and the depth of the footing or buried first course below it. Then send your office this:

I plan to build a retaining wall at [address]. It will retain about [inches] of soil, show [inches] above the lower ground, and sit on a footing or base course [inches] deep. Above it will be [lawn / a slope / a driveway / a fence]. Does it need a permit, and at what height does your office require an engineer’s design?

Same wall, different answers

Take one ordinary garden wall: 40 inches of block showing above the lawn, holding back level soil that reaches the top, on a footing 8 inches deep whose top is flush with the lawn. Measured from the bottom of the footing it is exactly 48 inches tall; measured from the lawn, 40 inches; and it retains 40 inches of unbalanced fill. Here is what the rules say about it, with nothing above it but lawn.

Office or stateHow height is measuredLineThis wall
Plano, TX (model code)Bottom of footing to topNot over 4 ftNo permit
Portland, ORBottom of footing to topExceeds 4 ft needs oneNo permit
Pennsylvania (state code)Lowest level of grade to topNot over 4 ftNo permit, unless a local rule says otherwise
Kansas City, MOGrade on the low sideUp to 4 ftNo permit (unless next to a public right of way)
Virginia (state code)Unbalanced fillUnder 3 ftPermit
Contra Costa County, CATop of footing to topOver 3 ftPermit
Albuquerque, NMGrade differenceOver 36 inPermit
Rhode Island (state code)Lower finished grade to topOver 32 inPermit
Honolulu, HI; Las Vegas, NVHeight of wallOver 30 inPermit
Clark County, NVHeight (block and concrete walls)Over 24 inPermit
St. Louis, MOAbove lowest adjacent gradeOver 18 inPermit
Arlington County, VA; Durham, NC; Manchester, NHAny heightEvery retaining wallPermit

Plano, Portland, Pennsylvania, Virginia and Rhode Island are quoted from their codes and pages as read today; the others are their rules as verified in our dataset. Two things stand out. First, four inches of buried footing is the difference between a permit and none under the model code: the same wall on a 12-inch footing measures 52 inches and needs one in Plano and Portland. Second, “unbalanced fill” (Virginia) and “lower finished grade” (Rhode Island) ignore the footing entirely, so a deep footing does not help you there.

Kansas City’s and St. Louis’s lines are tighter than the table can show, as read for our dataset: Kansas City withdraws the exemption for a wall that supports a surcharge, impounds flammable liquids or is adjacent to a public right of way, and St. Louis’s building division lists retaining walls among residential work that needs a permit, with the code exempting only those “eighteen inches or less in height above lowest adjacent grade”. Salt Lake City shows how an office and its state can measure differently: the city’s FAQ uses 4 feet from the bottom of the footing, while Utah’s amended code exempts walls retaining “less than four feet” of unbalanced fill.

What counts as a surcharge

A surcharge is any load on the retained soil beyond the soil itself, and it ends the exemption at any height in the model code. Portland names the common ones: a permit is needed for “any retaining wall affected by the weight of an adjacent slope, or nearby driveway or structure.” Other offices add their own, in their rules as verified in our dataset:

  • A fence on top. Sacramento County treats a fence built on top of or into a retaining wall as a surcharge, so the wall needs a permit whatever the fence’s height; Mesa and Chandler, Arizona, both list fences on top of retaining walls as permit work. Orange County, California, allows a fence of up to 6 feet in all on a retaining portion of no more than 1 foot, and requires a permit beyond that.
  • Sloping soil above. Orange County’s no-permit case is a wall up to 4 feet with level backfill; sloping backfill needs a permit.
  • Steps that act as one wall. Hawaii County counts stepped walls within 8 feet of each other as one wall, so two 3-foot terraces close together can count as one 6-foot wall.

Virginia’s code says the same thing in its own terms: the exemption is lost for a wall “supporting a surcharge other than ordinary unbalanced fill.”

When the office wants an engineer

A permit and an engineer’s stamp are separate thresholds, and they do not always sit at the same height. In our dataset’s rules: Overland Park, Kansas, requires a permit with a sealed engineered design at 48 inches or higher; Billings, Montana, requires an engineered, stamped design at 4 feet or with a surcharge; Oklahoma City requires a stamped design from an Oklahoma licensed engineer over 36 inches from the lowest grade, while exempting only walls of 18 inches or less; and Lexington, Kentucky, asks for an Engineer’s Certification at 48 inches, which is a design trigger, not its permit trigger. If your wall is anywhere near those heights, price the engineer into the project before you choose between one tall wall and two terraces.

Permits that are not about the wall

Even an exempt wall can need something else.

  • Grading. Portland requires a site development permit to “Move more than 10 cubic yards of earth”, and Anchorage, as read for our dataset, requires a grading permit for all fill and excavation. A wall that levels a sloped yard often moves that much soil; our guide to grading and fill dirt permits compares where other offices set that line.
  • Zoning. Maricopa County, Arizona, requires a zoning clearance for retaining walls over 18 inches; Manchester, New Hampshire, which permits every retaining wall, also requires one over 4 feet to sit at least 10 feet from a property line (both as read for our dataset).
  • Critical areas and flood zones. King County’s exemption for “Most retaining walls 4 feet high or less” applies only “Unless your property contains critical areas.”
  • Your neighbor. Worcester, Massachusetts, tells residents that dilapidated landscape retaining walls up to 6 feet along a property line are “a civil matter”, not something the city enforces (as read for our dataset). A wall on or near the line is worth a survey; our guide to whether a fence permit needs a survey explains which kinds offices accept.

A wall that also serves as a fence is often measured twice, once as a retaining wall and once as a fence. Our guide to the seven-foot fence rule covers the fence side.

How the comparison was built

Sixty-three of the 178 offices in our dataset mention retaining walls in the summary, when-needed, threshold or notes fields of a verified permit row (confirmed or reported; 67 if unconfirmed rows are counted too). We read every one of those mentions; the table and lists use the offices whose mention states a height line or a specific trigger. Plano’s ordinance, Portland’s permit page, Rhode Island’s code, Pennsylvania’s and Virginia’s regulations, Henrico County’s exemption list and King County’s page were read on their official sites on November 18, 2026. The worked example is our arithmetic on a hypothetical wall; your wall’s footing depth and what sits above it are the facts your office will ask for. We have not checked whether any office changed its line after its row was last read, which each office’s page on this site shows.

How Tall Can a Retaining Wall Be Without a Permit?: figures as of 28 Sep 2026, 137 jurisdictions. Now 178.

Sources

Get rule-change alerts

We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.

We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.