PermitNotebook / Guides

Guide

Do You Need a Survey for a Fence Permit?

Some offices require a surveyor's plat (Miami: no more than a year old; Cook County: five years), others take a mortgage survey, a hand-drawn plot plan or even an aerial screenshot. What each kind of drawing is, which offices ask for which, and why no fence permit settles where your property line is.

Sometimes. Of the offices we read for this guide, a few require a survey prepared and sealed by a licensed land surveyor, two of them with an age limit. More accept a drawing you make yourself, on a copy of a survey you already have or on a plain sketch of the lot, and at least one accepts an aerial photo. Before you pay for a new survey, find out two things: whether your fence needs a permit at all, and what drawing your office actually asks for. And know what no fence permit does: it does not decide where your property line is.

Fresh sealed survey required
Miami (one year), Cook County (five years)unincorporated Cook County
Your existing survey, marked up
Town of HempsteadArlington County wants a certified plat; ask whether yours will do
Your own drawing or an aerial image
Sterling Heights; site-plan offices such as Plano and Raleigh
Fence needs no permit at all
14 of the 174 offices with a verified fence rule
Does the permit fix the line
No; boundary disputes are civil matters

Start with your office’s fence permit page or checklist and look for the exact words it uses. “Survey” or “plat of survey” usually means a document made by a licensed surveyor. “Site plan” or “plot plan” usually means a drawing you can make. Then look through your closing papers: the survey or plat from your purchase may be exactly what the office wants, if it is recent enough.

First: does your fence need a permit?

Many fences need no permit, so no drawing. Of the 174 building offices whose fence rule we have verified (of the 178 we cover), 14 require no permit for a residential fence, and 111 require one only in some cases, usually above a height (often 6 or 7 feet) or in a front yard, on a corner lot or around a pool. Only 49 require a permit for every fence. Our guide to fence permit height rules shows where the lines fall. If your fence is under the line where you live, the survey question does not arise, though zoning height and placement rules still do.

What the offices ask for

The requirement runs from strict to loose.

A recent sealed survey. Miami asks for “A Recent Site Survey. This must be prepared by a certified Surveyor. The survey cannot be more than one year old and must be drawn to scale.” In unincorporated Cook County, Illinois, where “A permit is required for all unincorporated properties for fences constructed of any material at any height”, the applicant must “Submit a Plat of Survey signed and sealed by an Illinois registered surveyor that is not more than five (5) years old”, with the fence’s location, height, length, material and gates marked on it. A five-year limit means a survey from a recent purchase may still qualify; a one-year limit usually means a new one.

Your existing survey, marked up. The Town of Hempstead, New York, asks for “A copy of a recent complete (unaltered) survey by a licensed land surveyor” and then tells you how to turn it into the plot plan it also wants: “Make a copy of the recent (unaltered) survey and draw the fence location, height and material (Example: PVC, Wood, Chain-link) on the copy. Remove the land surveyor’s Stamp and submit as plot plan.” Arlington County, Virginia, wants “a certified plat that shows the location of the fence”; its page does not say whether you may draw the fence on the certified plat from your purchase, so ask before ordering a new one.

Whatever shows the fence accurately. Sterling Heights, Michigan, takes “a plot plan, mortgage survey, boundary survey, or aerial image, such as a Google Maps screenshot, with the proposed fence location accurately drawn or sketched,” and includes a template. Among the places we cover, Plano, Arlington (Texas), Salt Lake City, Raleigh, Corpus Christi, Cleveland and unincorporated Orange County, Florida, ask in their verified rules for a site plan with the fence drawn on it, a drawing an owner can make, and Pittsburgh lists fences as a scope that needs a site plan but not a professionally stamped one.

What a fence permit does not do

This is the part people most often get wrong. A permit approves a fence of a certain height and type in a location you drew. It is not a boundary determination.

  • Arlington County: “The Zoning Division does not enforce property lines. You should work with a Virginia-licensed land surveyor to verify them.”
  • Sterling Heights: “All disputes among property owners regarding fence placement are civil matters. The City of Sterling Heights will not inspect for property line determination or precise fence placement.”
  • Sterling Heights again, on whether to hire a surveyor where it does not require one: “If professional surveyor services are not obtained, applicant, property owner, and/or installer is proceeding at his own risk.”

So the real question is often not whether the office requires a survey but whether you need one. If the fence will run on or near a line and you are not sure where that line is (no markers you can find, an old or missing survey, a neighbor who disagrees), a surveyor marking the corners is what protects you if the neighbor later says the fence is on their land. If the fence sits well inside the lot, a drawing on your plat may be all you need, where your office accepts one.

Ways to keep the cost down

  1. Look for the survey you already have. A purchase closing may have included a survey or a plat. Check its date against your office’s age limit.
  2. Ask whether a marked-up copy is accepted. Hempstead tells applicants to draw on a copy of their survey. If your office’s checklist is unclear, ask before paying for a new one.
  3. Keep the fence off the line. Setting it a little inside your side leaves room for error if the markers are uncertain. Check your office’s placement rules first: unincorporated Clark County, Washington, for example, lets a fence be built up to your side of the line with the footings on your side.
  4. If you need a surveyor, say what for. If all you need is the corners found and marked, ask whether that alone is enough rather than ordering a full new survey.
  5. Keep the permit, the drawing and any survey together. Miami requires the permit card, survey and fence detail on site during construction, and you will want the same papers if a neighbor or a buyer asks later.

Method

Five offices were read in full for this guide on November 18, 2026: Miami, Cook County, Hempstead, Arlington County and Sterling Heights, and the quotes come from their own pages and documents. The fence permit counts are from the fence rules in our dataset (174 verified of 178 offices; four are not confirmed); the site-plan offices are cited from those verified rules, each linked from our fence permit index. We do not print survey prices: they vary by lot and region, and we found no public source to cite.

Do You Need a Survey for a Fence Permit?: figures as of 28 Sep 2026, 137 jurisdictions. Now 178.

Sources

Get rule-change alerts

We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.

We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.