Do You Need a Permit for a Driveway?
Often not from the building department, whose model code exempts flat paving, but from two other offices: the road agency that owns the curb and the strip by the street, and zoning, which controls width, setbacks and paved area. Repaving in place, widening and a new curb cut compared, with the state highway rules for Pennsylvania and Virginia and named offices' rules.
Often not from the building department, but from someone else. A driveway touches three different authorities: the road agency that owns the curb and the strip of land between your lot line and the street, the zoning office that controls how wide it is, how close it sits to the property line and how much of the lot is paved, and the building department, whose model code exempts flat paving. In Portland, Oregon, repaving the same footprint needs neither a building nor a zoning permit. A new curb opening needs a permit from the road owner in each office we read that mentions curb cuts, and widening, adding or paving a driveway needs zoning approval in several of them (Portland, Tulsa, Rochester), though not in Philadelphia.
- Building code
- Exempt if 30 inches or less above grade, not over a basementmodel code item; Pennsylvania, Rhode Island
- Curb cut, apron, sidewalk crossing
- Right-of-way permit from the road owner
- Driveway onto a state highway
- State DOT permit67 Pa. Code 441.3; 24VAC30-151-30
- New, wider or newly paved
- Zoning approval in several officesPortland, Tulsa, Rochester; not Philadelphia
- Repave, same footprint
- No building or zoning permitPortland; the apron still needs one
The office to call first is often not the building department. Find out who owns the road in front of your house (city or county public works or transportation, or the state DOT for a numbered state route), then ask:
I want to [widen / repave / add a second] driveway at [address], [width] feet wide, in [concrete / asphalt / pavers], including the apron at the street. Do I need a right-of-way or curb cut permit from you, and a zoning or building permit from the city? Who inspects the apron before it is poured?
The street end belongs to someone else
The apron, where a driveway crosses the sidewalk strip and meets the curb, is work in the public right-of-way, and the offices below permit it separately even when they exempt the driveway itself. Portland’s rule was read today; Austin’s, Cheyenne’s, Rochester’s and Polk County’s are as read for our dataset.
- Portland, Oregon: “Any work in the public right-of-way requires a permit,” and the city sends that question to its transportation bureau, not the building permit desk.
- Austin, Texas exempts “A sidewalk, driveway, or concrete flatwork that is not located in the public right-of-way,” so the right-of-way part is outside the exemption by its own wording.
- Cheyenne, Wyoming sends a sidewalk or driveway approach to a right-of-way permit, and Rochester, New York requires a Department of Environmental Services right-of-way permit for the apron or curb cut.
- Polk County, Florida lists “portions of driveways in the right of way or within the minimum setbacks” among concrete work that needs a permit.
On a state highway, the state owns that strip. Pennsylvania’s regulation is blunt: “No driveway, local road or drainage facility or structure shall be constructed or altered within State highway right-of-way … without first obtaining a permit from the Department” (67 Pa. Code 441.3(a)), with the application in the property owner’s name and filed “prior to the construction of any building which the proposed driveway will serve.” In Virginia, the transportation department issues a single use permit for “Construction of a permanent entrance to a highway” and for “Making permanent upgrades to an existing entrance” (24VAC30-151-30). A contractor who quotes a driveway onto a state road without mentioning the DOT has left out a step. Where the driveway crosses a roadside ditch, the culvert under it is the road owner’s call too; our guide to French drains, sump pumps and culverts compares four county culvert rules.
The lot: zoning decides width and paved area
In these offices, zoning, not the building code, is where the driveway permits come from. Tulsa, Rochester, Wake County and Philadelphia are cited as read for our dataset.
- Portland requires a zoning permit for “Creating a new or enlarged parking area or driveway, or paving a graveled parking area.” Paving gravel counts, even with no change in size.
- Tulsa, Oklahoma puts “Driveway widening (without cutting the curb)” on its list of residential zoning clearance permits; cutting the curb is the right-of-way step above.
- Rochester requires a Certificate of Zoning Compliance for every driveway.
- Wake County, North Carolina routes driveways through Planning and Zoning with a site plan showing setbacks and itemized impervious surface calculations.
The impervious surface point is easy to miss. A wider driveway adds pavement, and an office that caps lot coverage or manages stormwater counts every square foot. Philadelphia sits at the other end: its zoning page lists “Concrete or other hard surface materials, such as driveways and patios” among work that needs no zoning permit.
The building code: flat paving is mostly exempt
The model residential code’s exemption list includes sidewalks and driveways close to the ground, and the state editions we read keep it. Pennsylvania exempts “Sidewalks and driveways that are 30 inches or less above adjacent grade and not placed over a basement or story below it” (34 Pa. Code 403.62(c)(4)), and Rhode Island exempts “Sidewalks and driveways not more than thirty inches (30”) (762 mm) above adjacent grade and not over any basement or story below.” Portland lists “Repave driveways where expansion is not proposed” among work that needs no building permit, and requires one only to “Pour concrete sidewalks, slabs and driveways more than 30 inches above adjacent grade or over any story or basement.”
Not every office keeps the item. Plano, Texas, adopted its 2024 residential code with item 5 of the exemption list marked “[Deleted.]”, so the model driveway exemption is not in Plano’s code; ask Plano what it requires for your driveway before assuming nothing. Manchester, New Hampshire, deletes the same item (in the model code’s numbering), and its FAQ lists paving among work that needs a permit; Cook County, Illinois, requires a building permit before pouring or modifying a driveway or other impervious surface (both as read for our dataset). A driveway built up on fill or a retaining wall is a different project; our retaining wall guide covers when the wall needs its own permit.
Repave, widen or add: what changes
| Job | Building permit | Zoning | Right-of-way |
|---|---|---|---|
| Seal or resurface, same footprint | No, where the model exemption stands | No, in Portland | Only if the apron is redone |
| Gravel to asphalt or concrete | No, at grade | Yes in Portland (“paving a graveled parking area”) | If the apron is paved |
| Widen without touching the curb | No, at grade | Yes in Portland and Tulsa | No |
| New or wider curb cut | No, at grade | Where widening triggers it (Portland, Tulsa) | Yes, from the road owner |
| New driveway onto a state route | No, at grade | As local rules require | State DOT permit (PA, VA) |
The “No” in the building column assumes a driveway at grade under the model exemption; it is “ask” in Plano, Manchester and wherever your office’s list differs.
Before the pour
- Find the right-of-way line on your survey or plat; the apron starts there.
- Ask the road owner for its driveway or approach standard (width, thickness, curb transition) and whether it inspects forms before the pour.
- Ask zoning for the maximum width and the paved-area limit on your lot.
- Ask the road owner whether a water meter, storm inlet, hydrant or street tree near the new opening limits where it can go.
- Get the permit numbers into the paving contract, with the contractor responsible for the apron inspection.
For a patio or other slab away from the street, see our guide to patio permits. If an HOA governs your street, its approval is separate; our guide to HOA approval and building permits explains how the two interact.
Method and limits
Portland’s permit page, the Pennsylvania building and highway regulations, Virginia’s land use permit regulation, Rhode Island’s code and Plano’s ordinance were read on their official sites on November 18, 2026, and supply the quotes marked as such. Austin, Cheyenne, Rochester, Polk County, Tulsa, Wake County, Cook County, Manchester and Philadelphia are cited from their rules as verified in our dataset, in which 67 of the 178 offices mention driveways in a verified row (confirmed or reported); each office’s page on this site shows when its rule was last read. We did not read right-of-way fee schedules for this guide, so it quotes no driveway fee. Road agencies also set their own apron standards, which we have not compared.
Do You Need a Permit for a Driveway?: figures as of 28 Sep 2026, 137 jurisdictions. Now 178.
Sources
- City of Portland, Oregon, Residential permits: zoning permit for a new or enlarged driveway or paving a graveled parking area; no building permit to repave without expansion; any work in the public right-of-way requires a permit. (accessed )
- 34 Pa. Code 403.62(c)(4): no building permit for sidewalks and driveways 30 inches or less above adjacent grade and not over a basement or story below. (accessed )
- 67 Pa. Code 441.3 (PennDOT highway occupancy permits): no driveway within State highway right-of-way without a Department permit; applications in the owner's name, before the building the driveway serves. (accessed )
- Virginia 24VAC30-151-30 (VDOT Land Use Permit Regulations): a single use permit for construction of a permanent entrance to a highway and for permanent upgrades to an existing entrance. (accessed )
- Rhode Island SBC-2 (510-RICR-00-00-2), substituted R105.2 Building item 5: sidewalks and driveways not more than 30 inches above adjacent grade and not over any basement or story below are exempt. (accessed )
- City of Plano, Texas, Ordinance No. 2025-6-15: amended R105.2 Building list with item 5 (sidewalks and driveways) marked [Deleted.]. (accessed )
Get rule-change alerts
We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.
We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.