Quick answer
Greenville County does not publish whether an uncovered patio slab needs a permit. The word patio does not appear in Building Safety's permit FAQ, the Answer Book permit questions, the Residential Permit Fees schedule or the residential forms, and the statewide exemption list at S.C. Code 40-59-265 names "sidewalks and driveways" but not patios. A covered patio or a patio roof is a structure and falls under the county's general building permit rule; for a bare slab, ask Building Safety at 864.467.7060.
Applying yourself? Start with the office.
What a patio permit costs in Greenville County
How to apply in Greenville County
In Greenville County, applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.
What most patio permit applications include:
- Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
- For Greenville County, a scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
- Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
- For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
- By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).
General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. Greenville County Building Safety (Planning and Code Compliance) sets the exact checklist for Greenville County.
Where to apply in Greenville County:
Greenville County Building Safety (Planning and Code Compliance)
- 301 University Ridge, Greenville County Square, Suite S-3100, Greenville, SC 29601
- Phone: 864-467-7060
- Email: permits@greenvillecounty.org
Patio Permit in Greenville County compared with nearby South Carolina localities
| Locality | Permit needed? | Threshold | What each South Carolina schedule says | Verified |
|---|---|---|---|---|
| Greenville County | Not confirmed | Not confirmed | Not published | |
| Charleston | Not confirmed | Not confirmed | Not published | |
| Columbia | Permit required | Any size | Residential building permit under Code of Ordinances Sec. 5-204(a)(2): 'Value $1.00 to... |
Inspections and closing out your permit
In Greenville County, a permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
- In Greenville County: a footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
- In Greenville County: a frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
- In Greenville County: a final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
- In Greenville County: an at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
- In Greenville County: each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Greenville County permit portal or by phone at 864-467-7060.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Patio Permit checklist for Greenville County
- Confirm the requirement. Not confirmed, contact the office.
- Budget the fee. Check the official fee schedule for current amounts.
- Apply. In Greenville County, applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement. Start at the Greenville County permit portal.
- Keep the office details handy. Greenville County Building Safety (Planning and Code Compliance). Phone: 864-467-7060. Address: 301 University Ridge, Greenville County Square, Suite S-3100, Greenville, SC 29601.
- Plan for inspections. In Greenville County, a permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
Compiled from the official sources on this page. Last checked .
Permitting activity in Greenville County
In 2025, Greenville County authorized permits for 4,947 new residential housing units (4,222 single-family, 725 in multi-family buildings), valued at $2.0B, down from 5,575 the year before. That works out to about 8.5 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 583,125.
Frequently asked questions
- Do you need a patio permit in Greenville County?
- Greenville County does not publish whether an uncovered patio slab needs a permit. The word patio does not appear in Building Safety's permit FAQ, the Answer Book permit questions, the Residential Permit Fees schedule or the residential forms, and the statewide exemption list at S.C. Code 40-59-265 names "sidewalks and driveways" but not patios. A covered patio or a patio roof is a structure and falls under the county's general building permit rule; for a bare slab, ask Building Safety at 864.467.7060. Always confirm with the Greenville County Building Safety (Planning and Code Compliance) before starting.
- How much does a patio permit cost in Greenville County?
- Fees are set by Greenville County and are not published here. See the official fee schedule for current amounts.
- Where do you apply for a patio permit in Greenville County?
- You can apply through the Greenville County permit portal or contact the Greenville County Building Safety (Planning and Code Compliance) directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Greenville County?
- Under South Carolina law (S.C. Code Ann. 40-59-260(A), (B), (C), (E), (F); 40-59-265; 40-59-280; 40-59-20(6), (7); 40-59-30(A)): South Carolina licenses residential builders and residential specialty contractors under S.C. Code Title 40 Chapter 59, and 40-59-260 exempts the owner of record who builds for himself. The exemption applies only if the owner does the work himself, with his own employees, or with licensed contractors or registered entities, if the structure is intended for the owner's sole occupancy or occupancy by the owner's family and is not intended for sale or rent, and if the general public does not have access to it. The owner must personally appear and sign the building permit application, and the local permitting agency must hand over a disclosure statement whose statutory text reads in part: You must supervise the construction yourself. You may build or improve a one-family or two-family residence. The building must be for your own use and occupancy. It may not be built for sale or rent. The sale restriction is two years and is a presumption rather than a flat bar: 40-59-260(B) makes proof of sale or rent, or of offering for sale or rent, within two years after completion or issuance of a certificate of occupancy prima facie evidence that the project was undertaken for sale or rent, which forfeits the exemption and exposes the owner to the chapter's penalties. South Carolina then adds a step no other state in this wave has: 40-59-260(E) requires the owner to promptly record a notice with the register of deeds, indexed under the owner's name in the grantor index, stating that the building was constructed by the owner as an unlicensed builder, and failure to record revokes the statutory exemption. The exemption is from the licensing chapter, not from the permit, and 40-59-280 requires the building official to refuse a permit unless the applicant furnishes evidence of licensure, registration, or exemption. Confirm how Greenville County applies this before you apply.
From the Library
What else needs a permit in Greenville County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Before moving or adding plumbing fixtures, adding circuits or changing walls in a bathroom | ...cost of the project."), plus trade fees: plumbing minimum fee per permit $72.00 and... |
| Deck Permit | It depends | deck area, for decks not more than 30 inches above grade at any point | ...work is priced on the Residential Permit Fees schedule by total valuation: "$1,000... |
| Electrical Permit | It depends | Before any electrical work beyond minor repairs, including service upgrades, meter... | Electrical Permit Fees: minimum fee per permit $72.00 |
| EV Charger Permit | It depends | Before installing a hardwired charger or a new 240-volt circuit or receptacle for an... | Electrical Permit Fees: minimum fee per permit $72.00 |
| Fence Permit | It depends | fence height | ...work is priced on the Residential Permit Fees schedule by total valuation: "$1,000... |
| HVAC Permit | It depends | Before installing or changing out heating or cooling equipment, adding ductwork, or... | Mechanical Permit Fees: minimum fee per permit $72.00 |
| Plumbing Permit | It depends | Before adding or relocating plumbing fixtures, replacing concealed pipe, or connecting... | Plumbing Permit Fees: minimum fee per permit $72.00 |
| Pool Permit | It depends | prefabricated swimming pools only | ...work is priced on the Residential Permit Fees schedule by total valuation: "$1,000... |
| Roof Replacement Permit | Permit required | Any size | Flat fee: the Residential Roofing Permit line is $108.00 under Miscellaneous Permit Fees... |
| Shed Permit | It depends | floor area of a one-story detached accessory structure | ...work is priced on the Residential Permit Fees schedule by total valuation: "$1,000... |
| Solar Permit | Permit required | Any size | Electrical schedule line Solar Panel per 5kw at $48.00, with the electrical minimum fee... |
| Water Heater Permit | Permit required | Any size | ...Permit Fees on the Residential Permit Fees schedule: Gas Water Heater $36.00 and... |
Patio Permit in other South Carolina localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Greenville County documents; the office above sets the local rules.
How this patio permit page for Greenville County was verified. 1 official source: greenvillecountysc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Greenville County Building Safety (Planning and Code Compliance). Rules change; confirm before you build. How we verify.