Patio Permit in Jackson, Mississippi
Not confirmed
We could not confirm this
Quick answer
Jackson does not publish whether an uncovered on-grade patio needs a permit. Its residential page, its Building Permits page, the Chapter 26 ordinance and the OpenGov application instructions never mention patios. A covered patio or patio roof would be construction of a structure, which Sec. 26-1 puts under a permit, but the city says nothing about a bare slab.
- Issued by
- City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division
- Phone
- 601-960-1160
Applying yourself? Start with the office.
What a patio permit costs in Jackson
- Permit fee
- Not published
Jackson publishes no fee for this permit type in a schedule we can verify. Ask City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division how the fee is calculated for your project.
Where to ask in Jackson
We could not confirm the rule, so start with the office's own pages or call the number below.
City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division
- Warren Hood Building, 200 S. President St, 3rd floor, Jackson, MS 39201
- Phone: 601-960-1160
What else needs a permit in Jackson
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
Jackson does not publish a current permit fee schedule online, for every permit type below. The fee column shows what differs by project.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Before replacing or moving bathroom fixtures, adding or changing circuits, or altering... | See schedule |
| Deck Permit | It depends | deck floor area; the exemption also requires a deck not more than 30 inches above grade at any point, not attached to the dwelling, and not serving the required exit door | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | prefabricated pools only; site-built pools, spas and hot tubs need a permit at any depth | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | It depends | floor area of a portable storage building; a permanent foundation or electrical, plumbing or gas work requires a permit at any size | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
| Water Heater Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a patio permit in Jackson?
- We could not confirm the patio permit rule on an official Jackson page, so this page gives no yes or no. Call the permit office at 601-960-1160 before you start.
- How much does a patio permit cost in Jackson?
- We found no published fee for a patio permit in Jackson. To learn how it is calculated for your project, call the permit office at 601-960-1160.
- Where do you apply for a patio permit in Jackson?
- You can apply through the Jackson permit portal or contact the City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Jackson?
- Under Mississippi law (Miss. Code Ann. 73-59-15(1)(b), (1)(c), (2); 73-59-17; 73-59-18): Mississippi's residential builder and remodeler licensing law does not apply to a person who builds or improves his own residence, or who acts as his own general contractor on his own residence (Miss. Code 73-59-15(1)(b)). The exemption also covers work for a close relative's home that will not be sold or rented (73-59-15(1)(c)). It is limited to one house a year: an owner using it may not apply for more than one permit to build a single residence, or build more than one, within one year, and doing so creates a rebuttable presumption that the house is being built for sale or rent (73-59-15(2)). The local building official must still see evidence that you are either licensed or exempt before issuing a permit (73-59-17), and the exemption does not excuse the permit itself, which state law requires every city and county to make a condition of construction. Confirm how Jackson applies this before you apply.
From the Library
Everything above, sourced
What was checked for this patio permit page for Jackson. The rule itself is not confirmed. 1 official source: jacksonms.gov. Last checked by Mario Bailey, not confirmed with City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page