Patio Permit in Wichita, Kansas
Not confirmed
We could not confirm this
Quick answer
MABCD's code does not mention patios. The exemption list in UBTC Sec. 2.4.030 covers 'sidewalks and driveways' and 'decks, stoops, and porches' up to 30 inches above grade, but never names an uncovered patio slab. MABCD's residential building permit application (Form 16) asks for the square footage of a 'Covered Patio', which suggests covered patios are built under a building permit, but no published rule says so for an uncovered slab.
- Issued by
- Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County
- Phone
- 316-660-1840
Applying yourself? Start with the office.
What a patio permit costs in Wichita
- Permit fee
- Not published
- Fee schedule in force
- Official scheduleRead .
Wichita publishes no fee for this permit type in a schedule we can verify. Ask Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County how the fee is calculated for your project.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
Where to ask in Wichita
We could not confirm the rule, so start with the office's own pages or call the number below.
Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County
- 271 W. 3rd St. N., Suite 101, Wichita, KS 67202
- Phone: 316-660-1840
- Email: MABCD@sedgwick.gov
Patio Permit in Wichita compared with nearby Kansas localities
| Locality | Permit needed? | Threshold | What each Kansas schedule says | Verified |
|---|---|---|---|---|
| Wichita | Not confirmed | Not confirmed | Not published | |
| Overland Park | It depends | on-grade concrete or brick patio that supports no structure | Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less; the schedule has the rest |
Permitting activity in Wichita
In 2025, Wichita authorized permits for 1,526 new residential housing units (632 single-family, 894 in multi-family buildings), valued at $347M, up from 1,300 the year before. That works out to about 3.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 391,731.
What else needs a permit in Wichita
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | A permit is needed when a bathroom remodel changes or adds anything (plumbing, wiring... | Not published |
| Deck Permit | It depends | deck with no overhead structure and not over any basement or story below | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| EV Charger Permit | Permit required | Any size | Electrical permit (UBTC Table I): Special Power Circuit $9.00 |
| Fence Permit | It depends | fences other than concrete or masonry; concrete or masonry fences are measured at 4 feet from the bottom of the footing to the top of the wall | Not published |
| HVAC Permit | Permit required | Any size | Mechanical permit (UBTC Table K): Forced Air Furnace (2,000 cfm or less) $14.00 |
| Plumbing Permit | Permit required | Any size | Plumbing permit (UBTC Table H): Waste Openings $4.50 each, plus a Permit Issuance Fee |
| Pool Permit | It depends | prefabricated pools with capacity of 5,000 gallons or less and walls entirely above ground | Not published |
| Roof Replacement Permit | It depends | roofing and/or siding repair or replacement within any 12-month period | See schedule |
| Shed Permit | It depends | footprint of a non-fixed, movable storage cabinet with doors; any larger shed needs a location permit, and a building permit above 200 sq ft inside Wichita | Location permit: $50.00 (UBTC Table C) |
| Solar Permit | Permit required | Any size | UBTC Table I (Electrical) includes a 'Photovoltaic System' line item plus a Permit Issuance Fee of $25.00 |
| Water Heater Permit | Permit required | Any size | Plumbing permit (UBTC Table H): Water Heater New or Replacement $9.00, plus a Permit Issuance Fee |
Frequently asked questions
- Do you need a patio permit in Wichita?
- We could not confirm the patio permit rule on an official Wichita page, so this page gives no yes or no. Call the permit office at 316-660-1840 before you start.
- How much does a patio permit cost in Wichita?
- We found no published fee for a patio permit in Wichita. To learn how it is calculated for your project, call the permit office at 316-660-1840.
- Where do you apply for a patio permit in Wichita?
- You can apply through the Wichita permit portal or contact the Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Wichita?
- Under Kansas law (K.S.A. 50-6,129(a)(1), 50-6,135(b)): Kansas has no statewide owner-builder statute because the state does not license general or residential contractors; whether a homeowner may pull permits is set by the local code. The one state contractor registration, for roofers, expressly exempts an owner who personally performs, or has employees perform, roofing work on the owner's own dwelling or other structures on residential or farm property the owner owns (K.S.A. 50-6,129(a)(1)). An owner acting as their own roofing contractor must still give the permit official the registration number of any registered roofing subcontractor working under the permit (K.S.A. 50-6,135(b)). Confirm how Wichita applies this before you apply.
From the Library
Patio Permit in other Kansas localities
Everything above, sourced
What was checked for this patio permit page for Wichita. The rule itself is not confirmed. 1 official source: sedgwickcounty.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page