Kansas / Wichita

Solar Permit in Wichita, Kansas

Permit required

Yes, a permit is required

An electrical permit from MABCD is required before installing a solar photovoltaic system.

Confirmed on official page Verified

Issued byMetropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County

By Mario Bailey, verified against official sources

Quick answer

MABCD has no solar-specific page, but the UBTC makes any electrical wiring for light, heat or power in the MABCD jurisdiction unlawful without a MABCD permit, and the electrical fee table carries a dedicated photovoltaic system line. Whether a separate building permit is required for roof-mounted panels is not published.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?

Kansas's owner-builder rule (K.S.A. 50-6,129(a)(1), 50-6,135(b)) sets what you may do on your own home without hiring anyone. Read the statute.

When a permit is usually needed

An electrical permit from MABCD is required before installing a solar photovoltaic system.

What a solar permit costs in Wichita

Line item
solar permitBy formulaUBTC Table I (Electrical) includes a 'Photovoltaic System' line item plus a Permit Issuance Fee of $25.00; the photovoltaic figure is not transcribed because the two PDF extraction modes place it on different rows.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Wichita

In Wichita, a rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit.

What most solar permit applications include:

  • Both a building permit and a separate electrical permit are required, since the array must be designed and installed to the residential code's solar provisions and to the National Electrical Code (IRC R324.3).
  • For Wichita, the plan set identifies listed equipment: PV modules listed to UL 1703 (or both UL 61730-1 and UL 61730-2), and inverters listed to UL 1741, with grid-tied inverters listed for utility interaction (IRC R324.3.1).
  • Structural drawings show that the roof framing is designed to structurally support the array and withstand the gravity loads it adds (IRC R324.4.1).
  • For Wichita, the site plan lays out roof access pathways at least 36 inches wide, plus a ridge setback sized to how much of the roof the array covers, so firefighters retain pathways and ventilation access (IRC R324.6.1, IRC R324.6.2).
  • For Wichita, the one line electrical diagram shows the rapid shutdown method and the location of its single initiation device, since one control point must bring all system conductors down to safe levels (NEC 690.12, NEC 690.56(C)).
  • Interconnecting the array to the utility grid at a defined point of connection is a separate application process from the local building or electrical permit and must be approved before the system can operate (NEC 705.12).
  • Some permitting offices route applications through SolarAPP+, an automated review platform that checks the plan set against code requirements and issues eligible permits instantly (DOE SolarAPP+).

General submittal guidance from IRC 2021 R324 (Solar Energy Systems) and NEC 2020 Article 690 (Solar Photovoltaic Systems) and Article 705 (Interconnected Power Production Sources). Source. Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County sets the exact checklist for Wichita.

Where to apply in Wichita:

Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County

  • 271 W. 3rd St. N., Suite 101, Wichita, KS 67202
  • Phone: 316-660-1840
  • Email: MABCD@sedgwick.gov

Solar Permit in Wichita compared with nearby Kansas localities

LocalityPermit needed?ThresholdWhat each Kansas schedule saysVerified
WichitaPermit requiredAny size...includes a 'Photovoltaic System' line item plus a Permit Issuance Fee of...
Overland ParkPermit requiredAny size...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000...

Inspections and closing out your permit

In Wichita, inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.

  1. In Wichita: where an agency runs a rough or pre-inspection, it checks the array's roof penetrations while they are still exposed, confirming they are flashed and sealed (IRC R324.4.3).
  2. In Wichita: the inspector confirms whether rapid shutdown is required, how it is accomplished, and that it is properly identified (NEC 690.12, NEC 690.56(C)).
  3. In Wichita: pV disconnecting means must be permanently marked and installed where they are readily accessible, which the inspector confirms in the field (NEC 690.13).
  4. In Wichita: bonding and grounding of the array, including every exposed non current carrying metal part and the grounding electrode system, is checked before sign off (NEC 690.43, NEC 690.47).
  5. In Wichita: at the service equipment, the inspector looks for the required rapid shutdown placard, a labeled diagram showing the initiation device's location in the specified colors and letter sizes (NEC 690.56(C)).
  6. In Wichita: utility interconnection is inspected and approved separately from the local building department's sign off, and the system cannot be energized until both approvals are in hand (NEC 705.12).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Wichita permit portal or by phone at 316-660-1840.

Inspection sequence from NEC 2020 Article 690 (690.12 rapid shutdown, 690.13 disconnects, 690.43/690.47 grounding, 690.56 labeling) and IRC 2021 R324.4.3 (roof penetrations). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a solar permit in Wichita?
MABCD has no solar-specific page, but the UBTC makes any electrical wiring for light, heat or power in the MABCD jurisdiction unlawful without a MABCD permit, and the electrical fee table carries a dedicated photovoltaic system line. Whether a separate building permit is required for roof-mounted panels is not published. Always confirm with the Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County before starting.
How much does a solar permit cost in Wichita?
UBTC Table I (Electrical) includes a 'Photovoltaic System' line item plus a Permit Issuance Fee of $25.00; the photovoltaic figure is not transcribed because the two PDF extraction modes place it on different rows. See the official fee schedule for current amounts.
Where do you apply for a solar permit in Wichita?
You can apply through the Wichita permit portal or contact the Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Wichita?
Under Kansas law (K.S.A. 50-6,129(a)(1), 50-6,135(b)): Kansas has no statewide owner-builder statute because the state does not license general or residential contractors; whether a homeowner may pull permits is set by the local code. The one state contractor registration, for roofers, expressly exempts an owner who personally performs, or has employees perform, roofing work on the owner's own dwelling or other structures on residential or farm property the owner owns (K.S.A. 50-6,129(a)(1)). An owner acting as their own roofing contractor must still give the permit official the registration number of any registered roofing subcontractor working under the permit (K.S.A. 50-6,135(b)). Confirm how Wichita applies this before you apply.

From the Library

What else needs a permit in Wichita

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsA permit is needed when a bathroom remodel changes or adds anything (plumbing, wiring...Not published
Deck PermitIt dependsdeck with no overhead structure and not over any basement or story belowSee schedule
Electrical PermitPermit requiredAny sizeElectrical permit (UBTC Table I): 120 volt Circuit $2.00 each
EV Charger PermitPermit requiredAny sizeElectrical permit (UBTC Table I): Special Power Circuit $9.00
Fence PermitIt dependsfences other than concrete or masonry; concrete or masonry fences are measured at 4 feet from the bottom of the footing to the top of the wallNot published
HVAC PermitPermit requiredAny sizeMechanical permit (UBTC Table K): Forced Air Furnace (2,000 cfm or less) $14.00
Plumbing PermitPermit requiredAny sizePlumbing permit (UBTC Table H): Waste Openings $4.50 each, plus a Permit Issuance Fee
Pool PermitIt dependsprefabricated pools with capacity of 5,000 gallons or less and walls entirely above groundNot published
Roof Replacement PermitIt dependsroofing and/or siding repair or replacement within any 12-month periodRoofing permit: $0.05 per square foot (Min
Shed PermitIt dependsfootprint of a non-fixed, movable storage cabinet with doors; any larger shed needs a location permit, and a building permit above 200 sq ft inside WichitaLocation permit: $50.00 (UBTC Table C)
Water Heater PermitPermit requiredAny sizePlumbing permit (UBTC Table H): Water Heater New or Replacement $9.00, plus a Permit...

Solar Permit in other Kansas localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Wichita documents; the office above sets the local rules.

How this solar permit page for Wichita was verified. 2 official sources: sedgwickcounty.org, sedgwickcounty.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Solar Permit requirements across Kansas localities

Solar permit rules nationwide

Permit required
Get quotes