EV Charger Permit in Wichita, Kansas
Permit required
Yes, a permit is required
An electrical permit is required to install an EV charger circuit.
Quick answer
MABCD publishes nothing EV-specific, but the UBTC requires a MABCD permit for any electrical wiring for light, heat or power, and the only exemptions are temporary decorative lighting and communication wiring. A hardwired charger or new 240-volt circuit is therefore permitted electrical work.
- Issued by
- Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County
- Phone
- 316-660-1840
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an EV charger permit costs in Wichita
- Fee schedule in force
- Official scheduleRead .
- Published in
- Electrical permit (UBTC Table I):
- Special Power Circuit $9.00;
- Permit Issuance Fee $25.00.
- The table has no EV-specific line;
- the special power circuit line is the likely fit but MABCD does not say so.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Wichita
General guide, not specific to this office
What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County
- 271 W. 3rd St. N., Suite 101, Wichita, KS 67202
- Phone: 316-660-1840
- Email: MABCD@sedgwick.gov
EV Charger Permit in Wichita compared with nearby Kansas localities
| Locality | Permit needed? | Threshold | What each Kansas schedule says | Verified |
|---|---|---|---|---|
| Wichita | Permit required | Any size | Electrical permit (UBTC Table I): Special Power Circuit $9.00 | |
| Overland Park | Permit required | Any size | See schedule |
Your EV Charger Permit checklist for Wichita
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: sedgwickcounty.org: mabcd.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Wichita permit portal.
- Keep the office details handy. Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County. Phone: 316-660-1840. Email: MABCD@sedgwick.gov. Address: 271 W. 3rd St. N., Suite 101, Wichita, KS 67202.
Compiled from the official sources on this page. Last checked .
Permitting activity in Wichita
In 2025, Wichita authorized permits for 1,526 new residential housing units (632 single-family, 894 in multi-family buildings), valued at $347M, up from 1,300 the year before. That works out to about 3.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 391,731.
What else needs a permit in Wichita
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | A permit is needed when a bathroom remodel changes or adds anything (plumbing, wiring... | Not published |
| Deck Permit | It depends | deck with no overhead structure and not over any basement or story below | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | fences other than concrete or masonry; concrete or masonry fences are measured at 4 feet from the bottom of the footing to the top of the wall | Not published |
| HVAC Permit | Permit required | Any size | Mechanical permit (UBTC Table K): Forced Air Furnace (2,000 cfm or less) $14.00 |
| Plumbing Permit | Permit required | Any size | Plumbing permit (UBTC Table H): Waste Openings $4.50 each, plus a Permit Issuance Fee |
| Pool Permit | It depends | prefabricated pools with capacity of 5,000 gallons or less and walls entirely above ground | Not published |
| Roof Replacement Permit | It depends | roofing and/or siding repair or replacement within any 12-month period | See schedule |
| Shed Permit | It depends | footprint of a non-fixed, movable storage cabinet with doors; any larger shed needs a location permit, and a building permit above 200 sq ft inside Wichita | Location permit: $50.00 (UBTC Table C) |
| Solar Permit | Permit required | Any size | UBTC Table I (Electrical) includes a 'Photovoltaic System' line item plus a Permit Issuance Fee of $25.00 |
| Water Heater Permit | Permit required | Any size | Plumbing permit (UBTC Table H): Water Heater New or Replacement $9.00, plus a Permit Issuance Fee |
Frequently asked questions
- Do you need an EV charger permit in Wichita?
- Yes. An electrical permit is required to install an EV charger circuit. If you are unsure how that applies to your project, call the permit office at 316-660-1840 before you start.
- How much does an EV charger permit cost in Wichita?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the permit office at 316-660-1840.
- Where do you apply for an EV charger permit in Wichita?
- You can apply through the Wichita permit portal or contact the Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County directly. The links are listed on this page.
- Can a homeowner pull an EV charger permit themselves in Wichita?
- Under Kansas law (K.S.A. 50-6,129(a)(1), 50-6,135(b)): Kansas has no statewide owner-builder statute because the state does not license general or residential contractors; whether a homeowner may pull permits is set by the local code. The one state contractor registration, for roofers, expressly exempts an owner who personally performs, or has employees perform, roofing work on the owner's own dwelling or other structures on residential or farm property the owner owns (K.S.A. 50-6,129(a)(1)). An owner acting as their own roofing contractor must still give the permit official the registration number of any registered roofing subcontractor working under the permit (K.S.A. 50-6,135(b)). Confirm how Wichita applies this before you apply.
From the Library
EV Charger Permit in other Kansas localities
Everything above, sourced
How this EV charger permit page for Wichita was verified. 2 official sources: sedgwickcounty.org, sedgwickcounty.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Metropolitan Area Building and Construction Department (MABCD), joint City of Wichita and Sedgwick County. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page