My Contractor Did Not Pull a Permit. What Can I Do?

The work is still unpermitted on your property, but a licensed contractor who skipped the permit can be disciplined by the state board: California and Nevada presume the violation was willful, Florida fines up to $10,000 per violation, and Virginia lists it as a prohibited act. How to get it fixed, at whose cost, and where to complain.

Two things are true at once. The work is unpermitted on your property, and the permit office will usually deal with you, the owner, to legalize it. And a licensed contractor who skipped a required permit has broken the rules of their own license, which in many states is grounds for discipline by the state board, separate from anything the city does. That second fact is your leverage when you ask the contractor to come back, pull the permit and fix what the inspector finds.

Whose problem is the unpermitted work
The property owner, as far as the permit office is concerned
Can the contractor be disciplined
Yes, in the four states below and others
California and Nevada
Building without a permit is presumed willfulB&P 7090; NRS 624.3011(2)
Florida
Board fine up to $10,000 per violationF.S. 489.129(1)(o)
Virginia
A prohibited act, and a required contract term18VAC50-22-260

Your first move: write to the contractor, in an email or letter you keep, asking them to apply for the permit, schedule the inspections and correct whatever the inspector requires, at their cost, by a date. Name the state rule below if your state has one. Then call your permit office and ask how it handles work already done without a permit. A letter you can adapt:

“On [date] you completed [work] at [address] under our contract of [date]. No permit was pulled for it, and [office] requires one. Please apply for the permit, schedule the inspections and correct anything the inspector requires, at your cost, by [date]. [In California, Nevada, Florida or Virginia: state law treats building without a required permit as grounds for discipline of your license; see (the provision below).] Please confirm in writing by [date].”

Why the permit office starts with you

Permits attach to the property and the work, not only to the contractor. The permit itself belongs to the owner: Milpitas, California, citing its residential code, says “A Building Permit may be issued only to the Building Owner or their Authorized Agent”, and a contractor who pulls one does so as the owner’s agent. So when an office finds work that should have been permitted, the property, and its owner, carry the problem, whoever did the work. That is why the after-the-fact process in our guide to after-the-fact permit fees is written for owners, and why closing on a house with open permits and selling with unpermitted work are owner problems too.

What the office asks for is usually the same as if the permit had been pulled on time, plus an investigation or after-the-fact fee and enough opening up of walls or floors for the inspector to see the work. A contractor who comes back can handle all of it; in many offices only a licensed contractor can pull the permit for the trade work anyway.

What state contractor laws say

Many states license contractors through a board that can fine, suspend or revoke a license for violating building laws. Four state laws, read today, name permits specifically.

California. Business and Professions Code section 7090 says that if the registrar finds a licensed contractor “has willfully and deliberately violated any state or local law relating to the issuance of building permits”, apart from small repair and part-replacement jobs, “the registrar shall take disciplinary action against the contractor’s license”. And it sets the burden: “there shall be a rebuttable presumption affecting the burden of proof that construction performed without a permit is a willful and deliberate violation.” Section 7110 separately makes willful disregard of the building laws a cause for discipline.

Nevada. NRS 624.3011 makes “Willful or deliberate disregard and violation of … The building laws of the State or of any political subdivision thereof” cause for discipline, and subsection 2 adds: “If a contractor performs construction without obtaining any necessary building permit, there is a rebuttable presumption that the contractor willfully and deliberately violated the building laws”.

Florida. Under section 489.129(1) of the Florida Statutes the Construction Industry Licensing Board may reprimand, suspend or revoke, order restitution, or “impose an administrative fine not to exceed $10,000 per violation” for any listed act, and item (o) is “Proceeding on any job without obtaining applicable local building department permits and inspections, unless otherwise provided by law.”

Virginia. The Board for Contractors’ rules list as prohibited act 33 “Failure to obtain a building permit or applicable inspection, where required.” They also make it a required term of a residential contract: the contract must contain “A statement of assurance that the contractor will comply with all local requirements for building permits, inspections, and zoning”. If your Virginia contract has that clause, as it must, skipping the permit is also a breach of the contract.

A presumption that the violation was willful helps the board’s case: in California and Nevada the law starts from the assumption that building without a required permit was deliberate. It is not the whole case. In California, the same section keeps the burden on the registrar in a suspension or revocation hearing, “to establish by clear and convincing evidence that he or she is entitled to the relief sought in the petition.”

If the contractor was not licensed

Then the board rules above do not reach them through a license, and the permit is often the least of it. Unlicensed contracting can be an offense in itself: Nevada’s contractor law, for example, makes it a misdemeanor on a first offense, with a fine of $1,000 to $4,000 (NRS 624.700 and 624.750). An unlicensed contractor may also be unable to pull the permit even if they want to fix it. Check the license before you do anything else: each state’s page on this site, such as the California contractor license lookup, links the official search where the state has one. If the contractor was unlicensed, the fix is usually a licensed contractor of your own and a permit pulled now; getting money back is a civil matter between you and them.

How to get it fixed

  1. Get the paperwork together. The contract, every invoice and payment record, photos of the work, and any messages where the permit was mentioned.
  2. Check the license on the state board’s official search, and note the license number and classification.
  3. Ask, in writing, for the permit to be pulled and the work inspected, at the contractor’s cost, by a date. Hold back any money still owed until the final inspection passes, if your contract allows it.
  4. Call your permit office before the date passes. Ask how it handles work already done, what the after-the-fact fee is, and whether it can open a complaint or enforcement case against the contractor itself. Some offices discipline contractors locally, and Florida’s statute lists as its own ground “Being disciplined by any municipality or county for an act or violation of this part”, that is, local discipline for an act that also breaks the state contracting law.
  5. If the contractor refuses or disappears, file a complaint with the state board. The board can discipline the license and, in Florida, order restitution to a consumer; expect a board case to take time.
  6. Have the work permitted anyway. Hire a licensed contractor to pull the permit and correct the work. The permit protects you when you sell, and the cost of doing it is part of what you can claim from the original contractor.

Before you hire the next one

The permit question is the best single test of a contractor. Ask, before you sign: “Who pulls the permit, and is its cost in this price?” A licensed contractor who pulls the permit in their own name takes responsibility for the work passing inspection. Our guide to who should pull the permit explains why that protects you, and why a contractor who asks you to pull it deserves a second look. Check the license itself too: our guide to checking a contractor license lists what to read on the state’s record.

Method

We read the California, Nevada, Florida and Virginia provisions, and the Milpitas handout, on November 18, 2026; the quotes are theirs, word for word. Other states’ contractor laws were not read for this guide; your state board’s own rules decide what it can do. This is general information about how permits and licensing boards work, not legal advice about a dispute with your contractor.

My Contractor Did Not Pull a Permit. What Can I Do?: figures as of 28 Sep 2026, 137 jurisdictions. Now 178.

Sources

Get rule-change alerts

We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.

We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.