Guide
Do You Need a Permit for an ADU, and Can Your City Say No?
An accessory dwelling unit always needs a building permit; whether zoning allows one is the real question. California, Washington, Arizona and Massachusetts limit what cities may require; Florida only lets them allow ADUs. Size caps, owner-occupancy and rental rules compared across 15 offices, from 800 square feet and family-only in Virginia Beach to two units per lot in King County.
Yes, an accessory dwelling unit always needs a building permit: it is a new home, with its own sleeping, cooking or bathroom space, wiring and plumbing. Portland, Oregon, lists “Accessory dwelling unit (ADU)” and “Converting a space to an ADU” among its building permit work, and California’s ADU law is written around the permit application itself. The question that decides most projects comes earlier: whether zoning lets you have one on your lot at all, how big, and with what strings attached. In four states we read, state law takes many of those decisions away from the city. Everywhere else, the county or city writes the rules, and the 15 offices in our data range from a family-only unit of 800 square feet to two units on one lot.
- Building permit
- Always: an ADU is a dwelling unit
- California
- Ministerial approval; decision within 60 days of a complete applicationGov. Code 66317
- Washington
- Two ADUs per lot in urban growth areas; no owner-occupancy ruleRCW 36.70A.681
- Arizona
- One attached and one detached in cities over 75,000A.R.S. 9-461.18
- Massachusetts
- One ADU without a special permit in single-family zonesG.L. c. 40A, s. 3
- Florida
- Local option onlyF.S. 163.31771
Before you pay for plans, ask your zoning or planning office five questions in one email:
I own [address], zoned [zone if you know it], lot about [square feet]. (1) Is an accessory dwelling unit allowed here, attached, detached or both? (2) What is the maximum size and height? (3) Must I live on the property, and may the unit be rented? (4) What setbacks and parking apply? (5) Do you publish pre-approved ADU plans or a checklist?
Where state law limits the city
California is the strictest on process. “A permit application for an accessory dwelling unit shall be considered and approved ministerially without discretionary review or a hearing” (Gov. Code 66317(a)(1)). The agency has 15 business days to say whether the application is complete and must list what is missing; once it is complete, it “shall either approve or deny the application … within 60 days” when there is already a house on the lot, and a denial must come with “a full set of comments” explaining how to fix it, followed by a written appeal right. If the agency misses the deadline, “the application shall be deemed approved.” On a lot with a single-family home, the state’s standards are the maximum, and cities may not add any others, “including an owner-occupant requirement, except that a local agency may require that the property may be used for rentals of terms 30 days or longer” (Gov. Code 66315).
Washington sets the rules for lots in urban growth areas. A city or county “must allow at least two accessory dwelling units” on those lots where single-family homes are allowed, “may not require the owner … to reside in or occupy” either unit, may not cap an ADU’s floor area below 1,000 square feet or its roof height below 24 feet (unless the house’s own limit is lower), and may not charge impact fees above 50 percent of those for the main house (RCW 36.70A.681). Lots in critical areas or their buffers are outside these limits, which matters in a county like King County.
Arizona applies to cities and towns of more than 75,000 people. They must allow, wherever a single-family house is allowed, “At least one attached and one detached accessory dwelling unit as a permitted use,” and must allow a unit of at least 75 percent of the house’s floor area or 1,000 square feet, whichever is less (a city may allow more). They may not ban long-term rental of either unit, may not require “a familial, marital, employment or other preexisting relationship” between the household and the ADU’s occupant, may not require extra parking, and may not set side or rear setbacks of more than five feet. The statute also bars requiring “a fire sprinkler” or a commercial building code, while keeping “applicable building codes” in force (A.R.S. 9-461.18). A backyard building used as an office or guest room without a kitchen is not an ADU, but it is not a storage shed either; our guide to using a shed as an office, studio or bedroom covers that case.
Massachusetts says no zoning ordinance or bylaw shall “prohibit, unreasonably restrict or require a special permit or other discretionary zoning approval for the use of land or structures for a single accessory dwelling unit, or the rental thereof, in a single-family residential zoning district.” The same paragraph bars an owner-occupancy requirement, allows at most one extra parking space (none within half a mile of a train, subway, ferry or bus station), and lets towns restrict short-term rentals (G.L. c. 40A, s. 3).
Florida works the other way. Its statute says “A local government may adopt an ordinance to allow accessory dwelling units in any area zoned for single-family residential use,” and that a building permit application for an ADU “must include an affidavit from the applicant which attests that the unit will be rented at an affordable rate” to a qualifying household (F.S. 163.31771(3) and (4)). It does not require any county to allow them. The four Florida counties in our data each write their own rules, and none of their rules as we read them mentions that affidavit, so ask your county which applies.
We read these five states’ statutes (six sections) on November 18, 2026. Other states have ADU laws we have not read for this guide, so a state missing here may still limit your city.
How 15 offices write the rules
These are the ADU rules for every office in our dataset with verified ADU facts, as read from each office’s own code in late October and November 2026.
| Office | Largest ADU allowed | Must the owner live there? | Rental |
|---|---|---|---|
| Contra Costa County, CA | 1,000 sq ft (1,200 on lots of 12,000 sq ft or more) | No (state law) | State law allows a 30-day minimum |
| San Jose, CA | 1,000 sq ft (1,200 on lots over 9,000 sq ft); attached no more than 50% of the house | No (state law) | State law allows a 30-day minimum |
| Clark County, WA | 1,000 sq ft (1,500 on lots of 20,000 sq ft or more) | No in urban growth areas (state law) | Not limited in the facts we hold |
| King County, WA | 1,000 sq ft heated plus 1,000 unheated | No in urban growth areas (state law) | Not limited in the facts we hold |
| Pinellas County, FL | 1,000 sq ft (750 in the Coastal Storm Area or a flood hazard area) | The house or the unit | Not stated in the facts we hold |
| Polk County, FL | 1,000 sq ft heated, smaller than the house | Not stated | Yes, but not short-term or vacation rental |
| Lee County, FL | 60% of the house’s living area | Not stated | Not stated |
| Hernando County, FL | 50% of the house; attached only | Yes | No: non-paying guests of the owner |
| Prince George’s County, MD | 75% of the house’s floor area, 22 ft tall | The house or the unit | Not stated in the facts we hold |
| Howard County, MD | 75% of the house (by lot coverage); two bedrooms | Yes | Not short-term |
| Baltimore County, MD | One-third of the house or 2,000 sq ft inside; 800 or 1,200 sq ft detached | Yes | Immediate family only |
| Montgomery County, MD | (detached ADUs a limited use in R-200, R-90, R-60) | Not in the facts we hold | Not in the facts we hold |
| Nashville, TN | Detached: 700 sq ft (850 on lots of 10,000 sq ft or more); inside the house: 25% | One of the two dwellings | Internal apartment: listed family members |
| Lincoln, NE | 40% of the house or 800 sq ft, one bedroom | The house or the unit | Not stated in the facts we hold |
| Virginia Beach, VA | 800 sq ft, one bedroom, R-40 district only | Yes (immediate family or an on-premise employee) | May not be rented |
What stands out:
- 1,000 square feet is the most common line in the table, in the California and Washington offices and two Florida counties. The tightest fixed caps we hold are Nashville’s 700 square feet for a detached unit on a lot under 10,000 square feet, Lincoln’s 800 square feet or 40% of the house, Virginia Beach’s 800 square feet with one bedroom, and Baltimore County’s 800 square feet for a detached unit on a lot under an acre.
- Owner occupancy is the sharpest split. California, Washington and Massachusetts forbid requiring it outright; Arizona’s ban on prohibiting long-term rental of either unit, and on requiring a relationship with the ADU’s occupant, has the same practical effect. Of the eleven offices in the table outside California and Washington, eight require it in some form, and the facts we hold for the other three do not address it.
- “Who may live there” rules turn an ADU into a family suite. Baltimore County limits its accessory apartment to immediate family, Hernando County to non-paying guests of the owner, and Virginia Beach to immediate family or an on-premise employee. If your plan depends on rent, these rules decide it before any permit.
- Prince George’s County’s rules are new. Council Bill CB-074-2026 took effect on November 16, 2026, allowing units where a single-family detached house is the main dwelling, generally one per lot.
- Where you may build can be the first hurdle. Nashville allows a detached ADU only inside the Urban Services District, a detached ADU overlay or a specific plan, and Virginia Beach only in the R-40 district.
What the building permit covers
Once zoning says yes, an ADU goes through the same building, electrical, plumbing and mechanical permits as any new living space, plus the fire separation, egress and utility questions that come with a second dwelling. Arizona’s statute is the reminder that state ADU laws loosen zoning, not the building code: it “does not supersede applicable building codes, fire codes or public health and safety regulations.” A garage or basement conversion needs a permit like a new detached unit does; our guide to finishing a basement covers what turns a basement into habitable space, and what a certificate of occupancy is explains the sign-off at the end.
A tiny house on wheels or an RV is a vehicle, not a building, so the building code does not decide whether anyone may live in one behind a house; zoning does. Our tiny house and RV guide compares two cities that answer it in opposite ways.
How this guide was built
Each state quote is taken from the legislature’s own site as it stood on November 18, 2026, and Portland’s line from the city’s permit page that day. The table is built from the 63 ADU facts our research team recorded for 15 offices, each from the office’s own code, with the date each was last read; Prince George’s County’s facts were recorded the day its bill took effect. “Not stated” means the facts we hold for that office do not address the point, not that the office has no rule. We have not read every state’s ADU law or every office’s ADU chapter, and ADU rules have changed often in the past few years, so confirm the current rule with your office before you commission drawings.
Do You Need a Permit for an ADU, and Can Your City Say No?: figures as of 28 Sep 2026, 137 jurisdictions. Now 178.
Sources
- California Government Code 66317 (amended by SB 543, effective January 1, 2026): ministerial approval, 15 business days to determine completeness, 60 days to approve or deny, written comments and appeals. (accessed )
- California Government Code 66315: no standards beyond Section 66314, including no owner-occupant requirement; rentals of 30 days or longer may be required. (accessed )
- RCW 36.70A.681 (2023 c 334): two ADUs per lot in urban growth areas, no owner-occupancy requirement, no floor-area cap under 1,000 square feet, height, setback, parking and impact fee limits; critical areas excepted. (accessed )
- Arizona Revised Statutes 9-461.18: municipalities over 75,000 must allow one attached and one detached ADU, size, rental, relationship, parking, design, setback and sprinkler limits. (accessed )
- Massachusetts General Laws c. 40A, section 3: a single ADU in a single-family district without a special permit, no owner occupancy, parking limits, short-term rental restrictions allowed. (accessed )
- Florida Statutes 163.31771: a local government may adopt an ordinance to allow ADUs; the building permit application affidavit of an affordable rent. (accessed )
- City of Portland, Oregon, Residential permits: accessory dwelling units, including converting a space to an ADU, are listed among work that needs a building permit. (accessed )
Get rule-change alerts
We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.
We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.