Shed Permit in Williamson County, Tennessee
By Mario Bailey Last checked 2026-07-06 · 2 official sources
Verified against official sources Not confirmedNot confirmed
Quick answer
Williamson County's Zoning Ordinance (Section 11.04: Accessory Uses and Structures) sets setback and maximum-size standards for accessory structures such as sheds, for example no single accessory structure may exceed 75 percent of the principal structure's square footage or 2,000 square feet on parcels of one acre or less, but neither the Building Codes Department's Building Codes page nor its Adopted Codes page states a specific square footage threshold under which a shed is exempt from a building permit. Contact the Building Codes Department at 615-790-5718 or the Electronic Plan Review System before starting any shed project to confirm whether a building permit is required for your structure's size.
Applying yourself? Start with the office.
What shed permit costs in Williamson County
No shed-specific line; an accessory structure needing a permit bills under the Section B101 valuation table, no fee at $1,000 or less unless inspected, then $15 for the first $1,000 plus $5 per additional thousand up to $50,000, per the county Schedule of Building Permit Fees.
How Williamson County compares in Tennessee
No Tennessee jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Nashville | It depends | Sheds of 100 sq ft or more are billed as a residential building permit at $5... |
| Williamson Countythis page | Not confirmed | No shed-specific line; |
How to apply in Williamson County
A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Williamson County Building Codes Department sets the exact checklist for Williamson County.
Where to apply in Williamson County:
Williamson County Building Codes Department
- 1320 West Main Street, Suite 400, Franklin, TN 37064
- Phone: 615-790-5718
Inspections and closing out your permit
A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Williamson County permit portal or by phone at 615-790-5718.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Williamson County
- Confirm the requirement. Not confirmed, contact the office.
- Budget the fee. No shed-specific line; an accessory structure needing a permit bills under the Section B101 valuation table, no fee at $1,000 or less unless inspected, then $15 for the first $1,000 plus $5 per additional thousand up to $50,000, per the county Schedule of Building Permit Fees. Official fee schedule.
- Apply. A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Williamson County permit portal.
- Keep the office details handy. Williamson County Building Codes Department. Phone: 615-790-5718. Address: 1320 West Main Street, Suite 400, Franklin, TN 37064.
- Plan for inspections. A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked 2026-07-06.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a shed permit in Williamson County?
- Williamson County's Zoning Ordinance (Section 11.04: Accessory Uses and Structures) sets setback and maximum-size standards for accessory structures such as sheds, for example no single accessory structure may exceed 75 percent of the principal structure's square footage or 2,000 square feet on parcels of one acre or less, but neither the Building Codes Department's Building Codes page nor its Adopted Codes page states a specific square footage threshold under which a shed is exempt from a building permit. Contact the Building Codes Department at 615-790-5718 or the Electronic Plan Review System before starting any shed project to confirm whether a building permit is required for your structure's size. Always confirm with the Williamson County Building Codes Department before starting.
- How much does a shed permit cost in Williamson County?
- No shed-specific line; an accessory structure needing a permit bills under the Section B101 valuation table, no fee at $1,000 or less unless inspected, then $15 for the first $1,000 plus $5 per additional thousand up to $50,000, per the county Schedule of Building Permit Fees. See the official fee schedule for current amounts.
- Where do you apply for a shed permit in Williamson County?
- You can apply through the Williamson County permit portal or contact the Williamson County Building Codes Department directly. The links are listed on this page.
From the Library
What else needs a permit in Williamson County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Deck permits follow the county's general building permit valuation table: no fee for co... |
| Electrical Permit | Permit required | Not specified | State-issued via the TN CORE system: a $5 issuing fee plus ampere-based inspection fees... |
| HVAC Permit | Permit required | Not specified | Mechanical Permit Fee Schedule: $10.00 permit fee plus $10.00 for the first $1,000 of v... |
| Plumbing Permit | Permit required | Not specified | Plumbing Permit Fee Schedule: $10.00 for issuing each permit, plus $5.00 for water and... |
| Pool Permit | It depends | Swimming pools designed or able to hold water more than 30 inches deep in unincorporated Williamson County require a building permit; pools designed to hold 30 inches of water or less, temporary pools, above-ground pools with no permanent filter system or decking, and pools not left up year-round are exempt from the permit requirement. | No pool-specific line; |
| Roof Replacement Permit | No permit needed | Not specified | No permit or fee; |
Shed Permit in other Tennessee localities
Official sources
- https://www.williamsoncounty-tn.gov/100/Building-Codes
- https://williamsoncounty-tn.gov/DocumentCenter/View/14874/034-Zoning-Ordinance-06-10-2025
- https://calhouncounty.sc.gov/sites/calhouncounty/files/Documents/Calhoun%20County/Departments/Building%20and%20Planning/2018IRC/2018%20IRC%20Building%20Guide_Accessory%20Structure.pdf
- https://www.botetourtva.gov/DocumentCenter/View/739/Accessory-Structure-Guide-pdf
Verified by a person against the sources above on 2026-07-06, not confirmed with Williamson County Building Codes Department. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-06Report an error on this page
Compare Shed Permit requirements across Tennessee localities
Tennessee rule changes
- Metro Nashville posts a current codes fee schedule, replacing the 2010 sheet
BL2022-1215 (Metro Fee Schedule Legislation) · 2026-07-25
Compare
Shed Permit across Tennessee