Do you need a shed permit in Missouri?
In Missouri, both counties and cities we checked agree: they require a shed permit only past a size or scope limit.
- Always required
- 0
- among 2 jurisdictions
- Conditional
- 2
- by size or scope
- Not required
- 0
- exempt outright
What a shed permit application usually includes, and which inspections usually follow, is explained once, in a general guide that is not specific to any state: how a shed permit works, from application to final inspection. Below is what differs from one jurisdiction to the next: who requires a permit, what they charge, and which office you file with.
Swipe sideways to see thresholds and confidence.
| Locality | Permit required? | Typical threshold | Confidence |
|---|---|---|---|
| Kansas City | Conditional | projected roof area of a one-story detached accessory building used as a tool or storage shed, playhouse, garage, carport or similar use | Confirmed on official page |
| St. Louis | Conditional | square feet of floor area for a detached accessory building, which must also keep the setbacks required by the Zoning Ordinance | Confirmed on official page |
| No localities match your filter. | |||
What a shed permit costs in Missouri
Both Missouri jurisdictions we cover publish a fee figure for this work. Each is quoted from the office's own schedule and linked to its citation. That is too few to stand for Missouri as a whole, so read them as what those offices charge, not a statewide rate.
A shed that needs a permit is a general building permit priced from the one- and two-family valuation table in Sec. 18-20(b)(2) of the Code of Ordinances: $52.00 for total valuation of $0.00 to $1,000.00, $58.00 for $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 for each additional $1,000.00 or fraction thereof to and including $100,000.00, and above $100,000.00 $483.00 for the first $100,000.00 plus $1.41 for each additional $1,000.00. Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22. There is no separate construction document review fee on one- and two-family work: Sec. 18-20(c)(1) charges that only "For other than one- and two-family dwellings." Optional add-ons are a $80.00 fast track permit fee under Sec. 18-20(b)(8) and a $30.00 scheduled express review fee for one- and two-family dwellings under Sec. 18-20(c)(4). Starting work before the permit is issued triples the fee under Sec. 18-20(e)(2).
last checked
Charged as a building permit on estimated construction cost: $25.00 application fee plus a $19.00 permit fee for a project of $0 to $1,000.00 (total $44.00), $23.00 for $1,001 to $2,000.00, $30.00 for $2,001 to $3,000.00, and "$10.00 per thousand estimated construction cost or fraction thereof" above $3,000.00. Fees are non-refundable.
last checked
Jurisdictions not listed publish no dollar figure we could quote. Absence does not mean a permit is free.
Common questions about shed permits in Missouri
- Do I need a shed permit in Missouri?
- In Missouri it depends on the size of the job. Of the 2 Missouri jurisdictions we have verified for shed work, both depend on the size or scope of the job.
- Is there a shed permit exemption in Missouri?
- 2 of the 2 Missouri jurisdictions we cover set a threshold rather than a flat rule, so the same job can be exempt in one Missouri county and permitted in the next. The table above lists each Missouri jurisdiction's published threshold in its own words, with the source and the date we verified it.
Ready to move on your shed permit?
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.