Maine / Portland

EV Charger Permit in Portland, Maine

Permit required

Yes, a permit is required

Installing a charger on a new or altered circuit.

Quick answer

Portland publishes no EV-charger page, so an EV charger falls under its general electrical rule: all electrical work requires a city electrical permit. A new 240-volt charger circuit is priced as a dedicated circuit on the electrical fee schedule.

Issued by
City of Portland Permitting and Inspections Department
From an official source Verified

Who is pulling this permit?

Hire it out

Sponsored

A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an EV charger permit costs in Portland

Fee schedule in force
Official scheduleRead .
  • Electrical Permit Fees (Revised 7/2026): $75.00 administrative/minimum fee;
  • "240V (208), Dedicated Circuits up to 50amps" $10.00 each, "240V (208V) dedicated circuits 51A up to 200A (each)" $20.00;
  • a service upgrade adds "Single Phase Service up to 200A" $25.00.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Portland

General guide, not specific to this office

What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Portland Permitting and Inspections Department

What else needs a permit in Portland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFlooring and paint are exempt; remodels, drywall work and any plumbing or electrical work are notBuilding Permits and Inspections Fee Schedule (Revised 7/2026), General Building Permit Fees: "Up to $1,000 worth of work" $25.00; the schedule has the rest
Deck PermitPermit requiredAny sizeBuilding Permits and Inspections Fee Schedule (Revised 7/2026), General Building Permit Fees: "Up to $1,000 worth of work" $25.00; the schedule has the rest
Electrical PermitPermit requiredAny sizeElectrical Permit Fees (Revised 7/2026): "Administrative Fee / Minimum Fee (applies to all electrical permits)" $75.00; the schedule has the rest
Fence PermitIt dependsFence height; any height in a historic district or on a historic-listed property needs a permitBuilding Permits and Inspections Fee Schedule (Revised 7/2026), General Building Permit Fees: "Up to $1,000 worth of work" $25.00; the schedule has the rest
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizePlumbing Permit Fees (Revised 7/2026): "Minimum fee (up to four fixtures)" $40.00, "Each additional fixture" $10.00; the schedule has the rest
Pool PermitPermit requiredAny sizeBuilding Permits and Inspections Fee Schedule (Revised 7/2026), General Building Permit Fees: "Up to $1,000 worth of work" $25.00; the schedule has the rest
Roof Replacement PermitIt dependsRe-shingling with no structural changes is exempt; structural roof work and historic properties are notNo fee when no permit is needed
Shed PermitPermit requiredAny sizeBuilding Permits and Inspections Fee Schedule (Revised 7/2026), General Building Permit Fees: "Up to $1,000 worth of work" $25.00; the schedule has the rest
Solar PermitPermit requiredAny sizeBuilding Permits and Inspections Fee Schedule (Revised 7/2026), General Building Permit Fees: "Up to $1,000 worth of work" $25.00; the schedule has the rest
Water Heater PermitPermit requiredAny sizePlumbing Permit Fees (Revised 7/2026): "Minimum fee (up to four fixtures)" $40.00 plus "City surcharge for all plumbing permits" $10.00

Frequently asked questions

Do you need an EV charger permit in Portland?
Yes. Installing a charger on a new or altered circuit. If you are unsure how that applies to your project, call the City of Portland Permitting and Inspections Department at 207-874-8703 before you start.
How much does an EV charger permit cost in Portland?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the City of Portland Permitting and Inspections Department at 207-874-8703.
Where do you apply for an EV charger permit in Portland?
You can apply through the Portland permit portal or contact the City of Portland Permitting and Inspections Department directly. The links are listed on this page.
Can a homeowner pull an EV charger permit themselves in Portland?
Under Maine law (32 M.R.S. 1201-A(13); 32 M.R.S. 1102-C(5)(A-1); 32 M.R.S. 1102-D; 32 M.R.S. 3302(1)(C); 30-A M.R.S. 4215): Because Maine does not license general contractors, nothing in state law stops a homeowner from doing their own carpentry or pulling their own town building permit. For electrical work, since a 2025 amendment, a person may wire an existing single-family home they own and occupy without a license and without a state electrical permit, as long as the work meets the National Electrical Code. A new single-family home the owner will live in can also be wired by the owner, but only with a single-family dwelling certificate and a state or local inspection before the wiring is covered. For plumbing, a license is not needed for work in a single-family residence that is or will be the person's own home, as long as it meets the Plumbers' Examining Board's laws and rules; the plumbing permit itself is still required. Confirm how Portland applies this before you apply.

From the Library

Everything above, sourced

How this EV charger permit page for Portland was verified. 2 official sources: portlandmaine.gov, content.civicplus.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Portland Permitting and Inspections Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project