Maine

Building without a permit in Maine

Quick answer

Maine has no statewide permit crime for building work. Instead, 30-A M.R.S. 4452 lists the land use laws that towns enforce locally, and subsection 5(V) puts the Maine Uniform Building and Energy Code (MUBEC) on that list.

Outline of Maine beside its penalty for building without a permit: civil penalty $100 to $2,500; no jail term
Who sets the penalty
State law
Fine in state law
A civil penalty of $100 to $2,500 for starting without a permit
Jail in state law
No (civil penalty)
Each day a new offense
Penalties may be assessed per day
Permit after the fact
Path in state law

Does your Maine town issue building permits?

In Maine the answer starts with the town's size. Above 4,000 residents the state building code must be enforced; at or below that, a town may choose not to enforce one, and some kinds of homes fall outside the state code entirely. If your town does not enforce a building code, the building code penalties may not reach your work, but the same state penalty law also covers local land use and shoreland zoning permits, and plumbing and electrical permits can still be required.

Ask the town office first

"Does the town enforce the Maine Uniform Building and Energy Code, and who is the code enforcement officer?" If it does, the rest of this page applies. If it does not, ask the same officer which land use, shoreland zoning, plumbing and electrical permits the work still needed.

What Maine law says

Maine has no statewide permit crime for building work. Instead, 30-A M.R.S. 4452 lists the land use laws that towns enforce locally, and subsection 5(V) puts the Maine Uniform Building and Energy Code (MUBEC) on that list. For those laws, starting construction without a required permit carries a civil penalty of at least $100 and at most $2,500, and the penalties can be assessed per day.

A specific code violation runs $100 to $5,000, and the cap can rise to $25,000 when the same party was convicted within the past 2 years of violating the same law or ordinance. Cases are brought in the town's name, and a code enforcement officer or other designated official may represent the town in District Court only when the municipal officers specifically authorize it.

A town that wins must be awarded its attorney fees, expert witness fees and costs unless the court finds special circumstances make that award unjust.

Cited from 30-A M.R.S. 4452(1)(C), (2), (3)(A), (3)(B), (3)(D), (3)(F), (4), (5)(V): official text. Localities enforce these rules and may add their own fees and procedures on top.

Can you get a permit after the work is done?

No Maine statute creates an after-the-fact or retroactive building permit, and none sets a fee multiplier for one; any such process comes from the town's own ordinance. What state law does say is that a court may order the violator to correct or abate the violation, and when the violation was willful it must order correction unless that would create a safety hazard, substantial environmental damage or a substantial injustice.

In towns of more than 2,000 inhabitants that enforce MUBEC, a building may not be occupied until the building official issues a certificate of occupancy, and an owner who lets it be occupied without one is penalized under 4452.

Cited from 30-A M.R.S. 4452(3)(C); 25 M.R.S. 2357-A: official text.

The typical path, whatever your locality calls it: stop any ongoing work, contact the permit office before they contact you, apply for the permit describing what was actually built, and expect the office to require opening up or inspecting concealed work. Voluntarily coming forward generally goes better than waiting for a complaint or a sale to surface it.

What Maine permit offices charge when work starts first

The statute above sets the ceiling; the bill comes from the local office. One Maine jurisdiction we cover publishes a specific surcharge for work started before the permit, quoted here from the fee schedule or permit page we verified, each linked to the page that carries the citation.

  • Starting work without a permit "may be subject to double the permit fee, per Sec 6-92(d)" of the Code of Ordinances.

    Portland · from the bathroom remodel permit page · last checked

Jurisdictions not listed either publish no surcharge clause or publish one we could not quote from an official schedule; their permit pages state what we could verify.

What Portland, Lewiston and Bangor charge when the work came first

Portland, quoted above, says in its fee schedule that work started without a permit may be subject to double the permit fee; its ordinance, Sec. 6-92(d), says the fee shall be double. Lewiston and Bangor double the building permit fee too, and in each city the electrical permit carries its own charge on top. Worked below for a finished basement in Portland and Bangor and a wired garage in Lewiston.

  • Portland's ordinance itself makes the doubling mandatory: Sec. 6-92(d) says the fee for any permit obtained after work has started shall be double the scheduled fee. content.civicplus.com document
  • Portland's general building permit fee, used for all construction work, is $25.00 for the first $1,000 of work plus $15.00 for each additional $1,000. content.civicplus.com document
  • Portland bases the fee on the cost of work you report, which must include the electrical and plumbing work; if the figure is below national standards the city may re-price the project using RSMeans and charge the larger fee. content.civicplus.com document
  • Every Portland electrical permit carries a $75.00 administrative minimum fee; outlets (receptacles, lights, drops) 1 to 20 add $12.00. content.civicplus.com document
  • Starting electrical work before the electrical permit is issued doubles the electrical permit fee. content.civicplus.com document
  • Portland's electrical schedule also charges per device: $5.00 for each AFCI or GFCI device, $5.00 for each 120V dedicated circuit, and $7.50 for each line-voltage smoke, heat or CO detector. content.civicplus.com document
  • Lewiston doubles the customary building permit fee when work starts before the permit is issued (the 'Belated Fee'). lewistonmaine.gov: DocumentView
  • Lewiston's Code Sec. 18-28(d) makes the belated fee an addition to the required permit fee for anyone who starts work before getting the permit. lewistonmaine.gov: DocumentView
  • The building permit fee schedule Lewiston links today is dated Updated 4/16/2013, with prices effective 7/01/2013. lewistonmaine.gov: DocumentView
  • Lewiston single-family rates: new construction or additions $25 plus $0.25 per square foot; accessory structures $25 plus $0.07 per square foot; renovations $25 if under $2,500, otherwise $25 plus $5.00 per $1,000 of value. lewistonmaine.gov: DocumentView
  • Lewiston residential electrical permits: $40.00 for receptacles, switches, fixtures, a service or similar work up to a 50% alteration of the system; $70.00 for new one- and two-family construction, accessory structures or more than a 50% alteration. lewistonmaine.gov: DocumentView
  • Electrical work started before the electrical permit costs a $200.00 belated fee for the first offense in a calendar year; later offenses that year double, up to $1,600.00 per offense. lewistonmaine.gov: DocumentView
  • Bangor may issue a stop work order for work started without a permit, and requires a double permit fee before it will issue any permit for work already begun. bangormaine.gov: 1652
  • Bangor's Schedule of Fees (Council Order 16-123, adopted March 28, 2016) is marked Revised 06/30/2026, and code fees rise with the Consumer Price Index each July 1 unless set by the state. bangormaine.gov: 1652
  • For work on an existing home (remodeling, decks, garages, additions, fences, pools and similar) Bangor charges $52 for the first $2,500 of construction cost plus $7 per $1,000 over $2,500. bangormaine.gov: 1652
  • Bangor's electrical permit for additional residential wiring is $59; new wiring or rewiring of a one- or two-family structure is $92. bangormaine.gov: 1652

Portland, a basement finished with new wiring, $25,000 total cost of work, before any permit

Building permit, first $1,000$25.00
Building permit, 24 more $1,000s at $15.00$360.00
Doubled because work started first: first $1,000 again$25.00
Doubled: 24 more $1,000s at $15.00 again$360.00
Electrical permit, administrative minimum$75.00
Electrical, outlets 1-20$12.00
Electrical doubled: minimum again$75.00
Electrical doubled: outlets 1-20 again$12.00
Building and electrical, started first$944.00

Per-device items are billed on top and double as well: $5.00 for each AFCI or GFCI device, $5.00 for each 120V dedicated circuit, and $7.50 for each line-voltage smoke, heat or CO detector. The $75.00 administrative fee is read here as charged on every electrical permit with item fees added; if Portland applies it as a minimum instead, the electrical lines come to less. A plumbing permit for a new bathroom, a certificate of occupancy inspection, any reinspections and opening finished walls are extra.

Lewiston, a wired 24 by 24 foot detached garage (576 square feet) built without permits

Accessory structure, base$25.00
Accessory structure, 576 sq ft at $0.07$40.32
Belated fee, the customary fee again: base$25.00
Belated fee: 576 sq ft at $0.07 again$40.32
Electrical permit, accessory structure$70.00
Electrical belated fee, first offense this calendar year$200.00
Built first$400.64

Lewiston's building fee schedule is the 2013 one the city still links, so confirm the figures when you call.

Bangor, a basement finished with added wiring, $22,500 construction cost, before any permit

Building permit, first $2,500$52.00
Building permit, 20 more $1,000s at $7$140.00
Double fee because work began first: first $2,500 again$52.00
Double fee: 20 more $1,000s at $7 again$140.00
Electrical, additional residential wiring$59.00
Electrical double fee$59.00
Building and electrical, started first$502.00

Bangor's fees rise with the Consumer Price Index each July, and a certificate of occupancy fee may apply at this cost.

Before you call

Write down what was built, its size and what it cost (Portland and Lewiston count the electrical and plumbing work in the value; ask Bangor whether its construction cost includes them), and photograph it. Then ask code enforcement: "Work was done at (your address) before a permit was issued. Can I apply now, what will you need to inspect, and what will need to be opened up?"

Stop work orders and daily penalties in Maine's cities

Portland's ordinance shows what waiting costs: lifting a stop work order has its own fee, penalties accrue for every day a violation exists, and an owner who lets one remain commits an offense too. Lewiston warns that whatever covers uninspected work may have to come off, and Bangor's permit application has you promise not to close in walls before inspection.

  • Portland's building authority may issue a stop work order until violations are remedied, and may cut wires or disable a circuit when electrical work was done without a permit (Sec. 6-95). content.civicplus.com document
  • Removing a Portland stop work order costs $150.00 on a project up to $10,000 ($300.00 if work went on in violation of the order) and $1,000.00 on a larger project ($3,000.00 if work went on). content.civicplus.com document
  • Portland assesses penalties for each day a violation exists: $200 to $2,500 a day for a specific significant code violation, rising to $500 to $5,000 a day after the city's written notice to correct it, and $100 to $2,500 a day for other specific violations (Sec. 6-1). content.civicplus.com document
  • In Portland's ordinance a 'significant code violation' includes inadequate or defective plumbing or electrical systems and substantially damaged or defective structural elements. content.civicplus.com document
  • Under Sec. 6-94, an owner or occupant who allows a violation to occur or remain at a building they own, occupy or control commits an offense subject to the Sec. 6-1 penalties. content.civicplus.com document
  • Wiring that needs a permit may not be covered or concealed before the city inspects or approves it (Sec. 6-101(b)). content.civicplus.com document
  • Lewiston's building official may serve a notice of violation ordering the illegal work or condition stopped and abated; it can be appealed to the board of appeals within 10 days, and violators face city citations or a land use complaint under 30-A M.R.S. 4452. lewistonmaine.gov: DocumentView
  • Lewiston warns that skipping a required inspection may mean removing whatever covers the work so the inspector can check it. lewistonmaine.gov document
  • Bangor's application has the applicant agree not to close in walls until framing, insulation, vapor barrier, electrical and plumbing are inspected, and notes that a building permit does not cover plumbing, heating, electrical or similar trade work. bangormaine.gov: 293
  • To permit an alteration of a one- or two-family house that adds no footprint or volume, such as a finished basement, Portland's checklist requires an online CSS application with floor plans of the whole building, existing and proposed, and framing plans for new or altered floors, walls, beams and ceilings; plumbing, electrical and HVAC permits are applied for only after the building permit is issued. portlandmaine.gov document
  • Lewiston takes completed applications by mail to Planning and Code Enforcement, 27 Pine Street, or by email to PlanningCode@lewistonmaine.gov; staff then quote the fee, payable by mail or by credit card at 207-513-3125, and no construction may occur until the permit is paid for and issued. lewistonmaine.gov: Permits
  • Bangor's Code Enforcement Office is at 73 Harlow Street, Bangor, ME 04401, phone 207-992-4230. bangormaine.gov: Code Enforcement

Selling a Maine house with unpermitted work

Maine's disclosure law lists no item about permits, but a known defect is a disclosure item, and uninspected work that is defective can be one. Bangor's own permit page spells out what is at stake when you sell.

  • Unless exempt, a Maine seller must give a property disclosure statement covering the water supply, the heating system, the waste disposal system, hazardous materials, known defects, access, flood hazard and shoreland zoning matters. None of the listed items names building permits, additions or work done without a permit. legislature.maine.gov: title33sec173
  • A 'known defect' the seller must disclose is a condition the seller knows of that significantly lowers value, significantly impairs occupants' health or safety, or, left unrepaired, significantly shortens the home's expected life. legislature.maine.gov: title33sec171
  • Maine does not prescribe a state form: the 'property disclosure statement' is a written form the seller prepares to cover the items in section 173. legislature.maine.gov: title33sec171
  • The seller must deliver the statement no later than when the buyer makes an offer. legislature.maine.gov: title33sec174
  • If the statement arrives after the offer, the buyer may withdraw the offer or end the contract within 72 hours of receiving it, without penalty and with the deposit returned; that right ends at closing or occupancy, whichever comes first. legislature.maine.gov: title33sec174
  • The statement is not a warranty and not part of the contract; a seller may say an item is unknown and need not investigate to fill it in. legislature.maine.gov: title33sec176
  • A seller is not liable for an error or omission that was outside the seller's actual knowledge (or relied on a public agency or licensed professional) and was not the result of the seller's negligence in passing on third-party information. legislature.maine.gov: title33sec177
  • The disclosure law does not limit any other statutory or common-law duty to disclose that exists to avoid fraud, misrepresentation or deceit. legislature.maine.gov: title33sec178
  • A seller's real estate agent must disclose to buyers, in a timely manner, every material defect in the property's physical condition the agent knew of or reasonably should have known of, though the agent need not discover latent defects. legislature.maine.gov: title32sec13273
  • Bangor's own permit page warns that property insurers may not cover work done without permits and inspections, and that selling a home with unpermitted modifications may mean tearing out the addition, leaving it unoccupied or doing costly repairs. bangormaine.gov: Building Permit Information
  • Portland permit records from March 2018 on are searchable by address in CSS ('Search Public Records'); records from 2000 through February 2018 are on the Parcels Website by Chart Block Lot number; older records are on microfiche, scanned on request to permitting@portlandmaine.gov. portlandmaine.gov document
  • Lewiston links no online permit search; ask for permit records under Maine's Freedom of Access Act, verbally or in writing, with no form required. Inspection is free; the city may charge $25 an hour after the first two hours and must warn you first if the estimate tops $50. lewistonmaine.gov: Public Records Freedom of Information
  • Bangor links no online permit search; for permit records, email the Code Enforcement Office, and note that many permits are in the city's Laserfiche document repository. bangormaine.gov: FOAA Requests

Before you list

Pull the permit history for your address (Portland's is searchable online; Lewiston and Bangor answer a records request or an email) and set it beside the work done while you owned the house. Legalize what is missing, or describe it plainly in your statement.

If your contractor skipped the permit

Maine's Home Construction Contracts Act does not say who pulls the permit. But a written contract it covers, one for more than $3,000 on a home of 3 or fewer units where both sides did not agree to opt out, must carry the contractor's warranty that the work meets the building code in force where the house is, and the Attorney General's office lays out the steps if a contractor will not make it right.

  • The contract rules cover any home construction contract for more than $3,000 in materials or labor, which must be in writing and signed by the contractor and the homeowner. legislature.maine.gov: title10sec1487
  • A covered residence is a dwelling with 3 or fewer living units, with its garages; commercial buildings are not covered. legislature.maine.gov: title10sec1486
  • The parties can leave out the required parts only if the contractor tells the homeowner their rights under the law and both then agree to a contract without them. legislature.maine.gov: title10sec1489
  • Maine's Home Construction Contracts Act lists what a written home construction contract must contain: the parties, the location, start and completion dates, the price, payment terms (down payment capped at one third), a description of the work, a warranty, dispute resolution options, a change order clause, and required notices. Who obtains the permits is not on the list. legislature.maine.gov: title10sec1487
  • Every home construction contract the Act covers must carry the contractor's warranty that the work is built to the standards of the building code applicable at that location. legislature.maine.gov: title10sec1487
  • The Attorney General advises homeowners to insist that any home construction or repair contract require the work to be done in accordance with the Maine Uniform Building and Energy Code. maine.gov: home construction and repair
  • A violation of the Home Construction Contracts Act is prima facie evidence of an Unfair Trade Practices Act violation and a civil violation carrying a forfeiture of $100 to $1,000, which must be brought within 2 years; an unintentional, bona fide error is a defense. legislature.maine.gov: title10sec1490
  • A homeowner who lost money through an unfair or deceptive practice can sue in Superior or District Court for actual damages and restitution; a written demand must be sent at least 30 days before suing, and a winning homeowner is awarded reasonable attorney's fees and costs. legislature.maine.gov: title5sec213
  • The Attorney General notes that a missing written contract is evidence of an Unfair Trade Practices Act violation but does not by itself win a lawsuit: the homeowner must prove a substantial loss of money or property caused by it. maine.gov: home construction and repair
  • Maine's Attorney General runs a free Consumer Mediation Service for disputes with a business, started through the online 'File a Complaint about a Business' form or by phone at 1-800-436-2131 (in Maine) or (207) 626-8849, Monday through Thursday, 9:00 a.m. to 12:00 p.m. maine.gov: consumer mediation service
  • For a claim under $10,000 the Attorney General points homeowners to Small Claims Court, which they can use without a lawyer; larger claims go to District or Superior Court with an attorney. maine.gov: home construction and repair
  • For bad plumbing or electrical work, the Attorney General suggests asking the town's plumbing inspector or code enforcement officer for an on-site inspection and a written opinion, then contacting the Plumbers' Examining Board at (207) 624-8639 or the Electricians' Examining Board at (207) 624-8457 for an on-site inspection and report. maine.gov: home construction and repair

What to send the contractor first

"The work you did at (your address) was started without the building permit it needed, and our written contract warrants that the work meets the building code. Please apply for the permit and schedule the inspections, or tell me in writing why you will not." If the job was $3,000 or less, or there is no written contract, leave out the warranty sentence. Keep the contract, receipts and messages for mediation or small claims.

Who can pull the permit

Because Maine does not license general contractors, nothing in state law stops a homeowner from doing their own carpentry or pulling their own town building permit. For electrical work, since a 2025 amendment, a person may wire an existing single-family home they own and occupy without a license and without a state electrical permit, as long as the work meets the National Electrical Code. A new single-family home the owner will live in can also be wired by the owner, but only with a single-family dwelling certificate and a state or local inspection before the wiring is covered.

For plumbing, a license is not needed for work in a single-family residence that is or will be the person's own home, as long as it meets the Plumbers' Examining Board's laws and rules; the plumbing permit itself is still required.

Cited from 32 M.R.S. 1201-A(13); 32 M.R.S. 1102-C(5)(A-1); 32 M.R.S. 1102-D; 32 M.R.S. 3302(1)(C); 30-A M.R.S. 4215: official text.

Common questions about unpermitted work in Maine

What is the penalty for building without a permit in Maine?
Maine has no statewide permit crime for building work. Instead, 30-A M.R.S. 4452 lists the land use laws that towns enforce locally, and subsection 5(V) puts the Maine Uniform Building and Energy Code (MUBEC) on that list. (30-A M.R.S. 4452(1)(C), (2), (3)(A), (3)(B), (3)(D), (3)(F), (4), (5)(V))
Can you get a permit after the work is done in Maine?
No Maine statute creates an after-the-fact or retroactive building permit, and none sets a fee multiplier for one; any such process comes from the town's own ordinance. What state law does say is that a court may order the violator to correct or abate the violation, and when the violation was willful it must order correction unless that would create a safety hazard, substantial environmental damage or a substantial injustice. (30-A M.R.S. 4452(3)(C); 25 M.R.S. 2357-A)
Who can pull a permit in Maine?
Because Maine does not license general contractors, nothing in state law stops a homeowner from doing their own carpentry or pulling their own town building permit. For electrical work, since a 2025 amendment, a person may wire an existing single-family home they own and occupy without a license and without a state electrical permit, as long as the work meets the National Electrical Code. A new single-family home the owner will live in can also be wired by the owner, but only with a single-family dwelling certificate and a state or local inspection before the wiring is covered. (32 M.R.S. 1201-A(13); 32 M.R.S. 1102-C(5)(A-1); 32 M.R.S. 1102-D; 32 M.R.S. 3302(1)(C); 30-A M.R.S. 4215)

Related situations in Maine

See which parts of the work needed a permit, then send us the details

Want help getting unpermitted work approved?

Tell us where your project stands. Where we have a vetted local pro who handles permits in Maine, we connect you; otherwise we reply with the exact steps and office links for your situation. Free to ask; no obligation.

PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

Your local permit office

Enforcement, after-the-fact fees, and the exact fix-it process are local. We cover these Maine permit offices:

Official sources

This page summarizes state law from the official sources listed above, with a last checked date. It is not legal advice. Penalties and procedures are applied by local offices and courts case by case; for anything contested or high stakes, confirm with your permit office or a licensed professional in Maine.