Guide
Do You Need a Permit for a Dumpster in the Street? Six Cities Compared
A roll-off on your own driveway needs no street permit in the cities we read; one in the street, the sidewalk or the parkway does, from the city transportation or public works office rather than the building department. Six cities read today, from $75 flat in Wauwatosa to $264.25 a month in San Diego, with their time limits, clearances, reflector rules and fines, and what a two-week roofing job would cost in each.
If the dumpster sits on your driveway or yard, the six city rules we read do not require a street permit for it (zoning or an HOA can still have a say). If it sits in the street, on the sidewalk or on the grass strip between the curb and the sidewalk, every one of the six cities we read requires one, because that land is public right-of-way. The permit comes from the city’s transportation, traffic or public works office, not the building department, it has to be in hand before the container is delivered, and in two of the six cities it runs a week or less (San Diego’s week applies to storage containers; its dumpster fee is monthly). Some dumpster companies apply for it; ask, because in New Orleans the fine can fall on the property owner as well as the contractor.
- On your driveway
- No street permitNew Orleans and Wauwatosa say so in writing
- In the street or parkway
- Right-of-way permit first
- Issued by
- Transportation, traffic or public works
- Fees in six cities
- $75 flat to $264.25 a monthplus meter charges where metered
- Time limits we found
- 5 to 7 daysSanta Barbara, Wauwatosa
Before you book the container, call the city (or have the dumpster company confirm in writing): “I need a [size] roll-off dumpster at [address] from [date] to [date] for a [roof / remodel / cleanout]. It will sit [on my driveway / in the street in front of my house]. Do I need a right-of-way permit, how far in advance must I apply, is there a time limit or a seasonal restriction, and do I have to post no-parking signs or rent meters?”
Driveway or street
New Orleans states the line in so many words: “If you will place your dumpster on private property, no additional permits are required,” but “dumpsters may only be placed on the property where work is taking place, not on adjacent or near-by lots or sites.” Wauwatosa defines the public part of a lot for its purposes: “The City public right-of-way includes the street and the grass parkway area between the street curb and the public sidewalk.” It adds that no permit is needed “as long as the item is located entirely on private property outside the limits of the City public right-of-way, which is typically 2 feet behind the public sidewalk in most locations.” So a container half on the driveway apron and half over the sidewalk is in the right-of-way. Portland’s residential permit page puts it most broadly: “Any work in the public right-of-way requires a permit.”
Six cities, read today
| City | Permit and fee | Time limit | Notable rules |
|---|---|---|---|
| New Orleans | $40 application fee; $10 per day for every 22 feet of space where there are no meters; metered spaces rented at the meter rate | Fees run from documented placement to documented removal | The dumpster owner’s name, address and phone on each side in letters at least 2 inches high; Type 2 reflective markers at each end; permit displayed so it can be read from the street |
| Savannah, GA | $20 application fee plus $4.00 per equivalent parking space per day, Sundays and holidays excluded | Review in “no more than four working days” | 3/4 inch plywood under the runners on pavement; covered when not in use; red and white reflective tape at each corner; no dumpsters on the sidewalk except by special provision |
| San Diego | $176.57 per month dumpster fee plus an $87.68 processing fee; $20.00 per metered space per day | Storage containers up to 7 days; at least three working days’ notice | 10 feet clear from the dumpster door, 25 feet from an alley or curb return, 15 feet from a hydrant; tow-away signs posted 72 hours ahead |
| Ann Arbor, MI | A barricade permit with liability insurance: 1.5 cents per square foot per day in the street, 5 cents on the sidewalk, plus a $22 processing fee, $64 minimum review fee and an inspection fee; meter bags $25 per bag per day plus deposit | 72 hours’ advance notice | Reflective tape on both ends |
| Santa Barbara, CA | A Public Works parking restriction waiver; fee per parking spot per day in restricted time zones, set by fee resolution | Up to 5 days, extensions to 15 days a year | In front of the site address only; 6 feet from any driveway; 15 feet from a crosswalk or hydrant; signs posted 72 hours ahead |
| Wauwatosa, WI | $75.00 | Seven continuous days, for short jobs such as a reroof or a garage demolition | Street storage from October 15 to April 15 needs the Public Works Operations Supervisor’s approval; you supply flashing barricades |
New Orleans prints two daily rates: its permit page says “$10 per day for every 22 feet of space occupied,” and its standards page says “$10.00 per day” for streets without meters. We used the permit page’s wording.
What a two-week job would cost
Take a roofing job that needs a container in the street for 14 days, Monday to the Sunday two weeks later, with an 8 by 22 foot roll-off (176 square feet) on a street without meters. These are permit fees only, from the schedules above, and our arithmetic:
- New Orleans: $40 plus 14 days at $10 for one 22-foot unit: $180.
- Savannah: if the container takes two parking spaces, $20 plus 12 chargeable days (two Sundays excluded) at $8: $116.
- San Diego: one month’s dumpster fee plus processing: $264.25.
- Ann Arbor: 176 square feet at 1.5 cents for 14 days is $36.96, plus $22 and $64: $122.96 before the inspection fee.
- Wauwatosa: $75.00 covers seven days. Going past that takes an extension from the Board of Public Works ($100.00 application, about three weeks to decide), so apply early or keep the container on the driveway.
- Santa Barbara: a 14-day job exceeds the 5-day limit; the city allows extensions up to 15 days a year in all.
Add meter charges on a metered street: San Diego’s $20.00 per space per day would add $560 for two spaces over 14 days.
What happens without one
New Orleans lists its fines for “placement without a permit (in addition to administrative action)”: $100 for a first offense, $250 for a second, $400 for a third and $500 after that, and it can issue a stop work order. Savannah adds a $10.00 penalty to any permit issued “as a result of City enforcement action,” and “Each incident and/or each day shall be deemed a separate violation.” Savannah also holds the applicant “liable for any roadway or sidewalk damage caused by placement,” which is why it asks for plywood under the runners.
Pairing it with the work permit
The container permit is separate from the permit for the work. A reroof, a demolition or a remodel has its own building permit, and New Orleans reminds applicants that “you may need other permits to comply with the building, electrical, and mechanical codes of the City.” Our guides to re-roofing without a permit and demolition permits cover the work side.
Method
We read each city’s page or form on November 18, 2026, on the city’s own website; Ann Arbor’s form was last revised June 29, 2023, and we could not confirm whether its rates have changed since. We chose these six because each publishes its fees and rules on one page; they are examples, not a survey. Chicago’s transportation fee schedule would not open for us, and our dataset records right-of-way permits only in passing, so this guide relies on the pages above. The two-week costs are our arithmetic on the published rates, and the container size is an example.
Do You Need a Permit for a Dumpster in the Street? Six Cities Compared: figures as of 28 Sep 2026, 137 jurisdictions. Now 178.
Sources
- City of New Orleans, Dumpster or Storage Container Permit: when required, markings under City Code 146-585, the $40 application fee and the daily charge. (accessed )
- City of New Orleans, Standards for Construction Dumpsters: private property, placement rules, display of the permit and fines for placement without a permit. (accessed )
- City of Savannah, Georgia, Dumpster/Container Permit: the $20 application fee, $4.00 per equivalent parking space per day, review time and minimum requirements. (accessed )
- City of San Diego, Information Bulletin 718 (July 2026), How to Obtain a Traffic Control Permit for a Storage Container or Dumpster: when required, placement clearances, fees and posting. (accessed )
- City of Ann Arbor, Michigan, Dumpsters and Storage Containers in the Public Right of Way (revised 6/29/2023): barricade permit, insurance and per-square-foot fees. (accessed )
- City of Santa Barbara, California, Public Works, Dumpster/Roll-off/Mobile Storage/Vehicle Procedures (revised November 2025): placement rules and time limits. (accessed )
- City of Portland, Oregon, residential permits: any work in the public right-of-way requires a permit from the transportation bureau. (accessed )
- City of Wauwatosa, Wisconsin, Storage in the Right-of-Way Permit: the $75.00 fee, seven-day limit and the October 15 to April 15 restriction. (accessed )
Get rule-change alerts
We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.