Wyoming / Cheyenne

Water Heater Permit in Cheyenne, Wyoming

Permit required

Yes, a permit is required

Before installing or replacing a water heater.

Quick answer

Cheyenne names water heaters among residential work that generally requires a permit, filed on the Plumbing, Mechanical, or Electrical Permit Application through OpenGov. The city publishes no gas-versus-electric or like-for-like exemption. Gas units must meet the city's fuel gas amendments, including the ban on unvented fuel-burning equipment.

Issued by
City of Cheyenne Compliance Department, Building Permitting & Licensing Division (Building Safety)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Plumbers usually pull this permit as part of the replacement. If yours failed and you are choosing a plumber under time pressure, comparing a couple of quotes still pays.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a water heater permit costs in Cheyenne

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
Published in
Valuation-based, from the City of Cheyenne Building and Construction Permit Fees table in City Code 15.08.030 (effective January 30, 2023, Ord. No. 4485):
Project value Fee
$1.00 to $500.00 is $23.50;
$501.00 to $2,000.00 is $23.50 for the first $500.00 plus $3.05 for each additional $100.00;
$2,001.00 to $25,000.00 is $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00;
$25,001.00 to $50,000.00 is $391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00 (higher tiers continue).
  • Plan review, when submittal documents are required, is 65 percent of the permit fee and is in addition to it.
  • Reinspection fee $250.00.
  • Work begun before the permit is issued carries an investigation fee equal to the permit fee (IRC R108.6 as amended by 15.10.020(H)).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Cheyenne

General guide, not specific to this office

What a water heater permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a water heater permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Cheyenne Compliance Department, Building Permitting & Licensing Division (Building Safety)

What else needs a permit in Cheyenne

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsBefore moving or adding plumbing fixtures, adding circuits, or altering walls in a...See schedule
Deck PermitIt dependsDeck area; exemption also requires not more than 30 inches above grade, not attached to the dwelling, and not serving the required exit doorSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsFence heightSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitNo permit neededExemptSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsPrefabricated pools only; in-ground and other built pools need a permit at any depthSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsFloor area of a detached accessory structureSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a water heater permit in Cheyenne?
Yes, before installing or replacing a water heater. If you are unsure how that applies to your project, call the permit office at (307) 637-6265 before you start.
How much does a water heater permit cost in Cheyenne?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the permit office at (307) 637-6265.
How long does a water heater permit take in Cheyenne?
Building plans and permits may take up to ten (10) business days to be reviewed; holidays and heavy volumes lengthen it (city FAQ). Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a water heater permit in Cheyenne?
You can apply through the Cheyenne permit portal or contact the City of Cheyenne Compliance Department, Building Permitting & Licensing Division (Building Safety) directly. The links are listed on this page.
Can a homeowner pull a water heater permit themselves in Cheyenne?
Under Wyoming law (W.S. 35-9-123(a)(i), (b); 35-9-120(e)): For electrical work, yes. The rule that licensed electrical contractors must install all electrical equipment is waived for property owned or leased by a person when that person, a partner, or a major stockholder of a family corporation installs the equipment and the property is not for immediate resale (W.S. 35-9-123(a)(i)). The waiver does not exempt the owner from code requirements, and it does not cover anyone who contracts for the exempt owner (W.S. 35-9-123(a), (b)). The owner still needs a state wiring permit where W.S. 35-9-120(e) applies; the Department of Fire Prevention and Electrical Safety issues homeowner wiring permits through its online portal. Whether a homeowner may pull their own building permit, and on what terms, is set by the city or county code; no state owner-builder statute or disclosure form was found. Confirm how Cheyenne applies this before you apply.

From the Library

Everything above, sourced

How this water heater permit page for Cheyenne was verified. 2 official sources: cheyennecity.org, cheyennecity.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Cheyenne Compliance Department, Building Permitting & Licensing Division (Building Safety). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project