South Carolina

Do you need a solar permit in South Carolina?

In South Carolina, all 3 counties and cities we checked agree: they require a solar permit for every job.

Always required
3
among 3 jurisdictions
Conditional
0
by size or scope
Not required
0
exempt outright
Rooftop solar panels on a tile-roofed house in a hillside neighborhood

What a solar permit application usually includes, and which inspections usually follow, is explained once, in a general guide that is not specific to any state: how a solar permit works, from application to final inspection. Below is what differs from one jurisdiction to the next: who requires a permit, what they charge, and which office you file with.

Swipe sideways to see thresholds and confidence.

Locality Permit required? Typical threshold Confidence
Charleston Yes Any size Confirmed on official page
Columbia Yes Any size Confirmed on official page
Greenville County Yes Any size Confirmed on official page

What a solar permit costs in South Carolina

3 South Carolina jurisdictions we cover publish a fee figure for this work. Each line is quoted from that office's own schedule and linked to its citation. The figures are not comparable to one another: some are flat minimums, some a percentage of job value, some charged per fixture, so what you pay depends on which schedule applies and on your job's valuation.

Charleston

Two permits, two fees. The guideline charges the array as a "Residential - Alterations & Repairs permit fee per Building and Trade Permit Fee Schedule," which is a $40.00 non-refundable application fee plus "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000." The electrical sub-permit carries its own $40.00 application fee plus the Electrical Permit Fee Table rate of "$0.25 per ampere (amp)" for new, replacement or upgrade service. Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019.

last checked

Columbia

Both a building permit and an electrical permit are priced under Code of Ordinances Sec. 5-204(a)(2) for one and two family dwellings: $20.00 for total value of $1.00 to $5,000.00, then $4.00 per $1,000.00 or fraction thereof, plus the $25.00 residential plan review fee. A contract verifying job cost is not required to accept plans for review but is required before the building permit is issued.

last checked

Greenville County

Electrical schedule line Solar Panel per 5kw at $48.00, with the electrical minimum fee per permit of $72.00 (Residential Permit Fees schedule; no effective date printed).

last checked

Jurisdictions not listed publish no dollar figure we could quote. Absence does not mean a permit is free.

Common questions about solar permits in South Carolina

Do I need a solar permit in South Carolina?
In most of South Carolina, yes. Of the 3 South Carolina jurisdictions we have verified for solar work, all 3 require a permit outright.

Ready to move on your solar permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your South Carolina Contractor's Licensing Board license active, and under which business name? Verify it on verify.llronline.com.

South Carolina's owner-builder rule (S.C. Code Ann. 40-59-260(A), (B), (C), (E), (F); 40-59-265; 40-59-280; 40-59-20(6), (7); 40-59-30(A)) sets what you may do on your own home without hiring anyone. Read the statute.

Planning more than a solar permit? Check your whole project