Solar Permit in Eugene, Oregon

Permit required

Yes, a permit is required

Before installing any roof-mounted solar photovoltaic or solar water system, and before wiring any solar array, including a ground-mounted one that needs no building permit.

Quick answer

Solar work in Eugene always needs a permit; what changes with the mounting is which one. A roof-mounted photovoltaic or solar water system needs a Solar Installation Permit, a flat $206.75 when the install is prescriptive under section 3111 of the Oregon Structural Specialty Code and otherwise priced on valuation, plus a separate electrical permit. A ground or pole-mounted photovoltaic system that is not attached to or supported by a regulated building and does not exceed 10 feet in height is exempt from the building permit, but Eugene states that separate electrical, plumbing and mechanical permits are still required for exempted items, so the electrical permit is unavoidable either way.

Issued by
City of Eugene Building and Permit Services, Planning and Development Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your Oregon Construction Contractors Board (CCB) license active, and under which business name? Verify it on search.ccb.state.or.us.

Oregon's owner-builder rule (ORS 701.010(7); ORS 701.325(1), (2), (3)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Eugene

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
Published in
From the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F):
  • "Solar Installation Permit: Prescriptive installations in compliance with section 3111 of the Oregon Structural Specialty Code ... $206.75. All other installations ... Apply building permit fees based on valuation (above). Separate electrical fees also apply."
  • Valuation counts racking, mounting elements, rails and labor but not the panels and inverters.
  • The electrical side is charged under Renewable Energy Systems: $137.25 for 5 kva or less, $176.25 for 5.01 to 15 kva, $226.25 for 15.01 to 25 kva, and $226.25 plus $10.25 for each additional kva above 25 kva for solar generation systems, capped at $988.25.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Eugene

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Eugene Building and Permit Services, Planning and Development Department

Solar Permit in Eugene compared with nearby Oregon localities

LocalityPermit needed?ThresholdWhat each Oregon schedule saysVerified
EugenePermit requiredAny size$206.75
PortlandPermit requiredAny sizeSee schedule

Permitting activity in Eugene

In 2025, Eugene authorized permits for 850 new residential housing units (234 single-family, 616 in multi-family buildings), valued at $164M, down from 1,002 the year before. That works out to about 4.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 173,236.

What else needs a permit in Eugene

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the deck or porch floor above adjacent grade, measured at any point within 3 feet horizontally of the floor, with a covered porch also needing to stay at least 3 feet from property linesDecks have no flat fee
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsfences of wood, wire mesh, chain link or other material weighing 5 pounds per square foot or less, with a 6 foot limit for materials heavier than 5 pounds per square footSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsroofed patio or porch cover supported by an exterior building wallNo flat patio fee
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsBefore installing any in-ground pool, before any pool whose walls sit partly below the...See schedule
Roof Replacement PermitIt dependsBefore re-roofing a house in a wildfire hazard zone, before re-roofing a townhouse...See schedule
Shed PermitIt dependsnonhabitable one-story detached accessory structure, with a height limit of 15 feet measured from grade plane to the average height of the highest roof surfaceSee schedule

Frequently asked questions

Do you need a solar permit in Eugene?
Yes, before installing any roof-mounted solar photovoltaic or solar water system, and before wiring any solar array, including a ground-mounted one that needs no building permit. If you are unsure how that applies to your project, call the City of Eugene Building and Permit Services, Planning and Development Department at 541-682-5086 before you start.
How much does a solar permit cost in Eugene?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the City of Eugene Building and Permit Services, Planning and Development Department at 541-682-5086.
How long does a solar permit take in Eugene?
Solar installations that do not require engineering are on Eugene's list of projects eligible for the Residential Express Permit program, which reviews applications at 9 a.m., 10 a.m., 11 a.m. or noon on Tuesdays and Thursdays with a stated goal of same-day issuance. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a solar permit in Eugene?
You can apply through the Eugene permit portal or contact the City of Eugene Building and Permit Services, Planning and Development Department directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Eugene?
Under Oregon law (ORS 701.010(7); ORS 701.325(1), (2), (3)): A homeowner may pull the permit and do the work. ORS 701.010(7) exempts from Construction Contractors Board licensing a person performing work on property that person owns, or on that person's own residence whether or not they own it, so no CCB license is needed to act as your own builder. That exemption does not cover someone working in the pursuit of an independent business with intent to offer the structure for sale. Oregon does require a signed disclosure at the counter: ORS 701.325(1) makes every city, county, or state permit office collect a written statement signed by the applicant, and an applicant claiming a licensing exemption must state the basis for it. ORS 701.325(2) requires the office to give the applicant the Information Notice to Property Owners About Construction Responsibilities and withhold the residential building permit until the applicant signs a statement, one option of which is that they are performing work on property they own or a residence they live in or will live in, and that any contractors they hire will be CCB licensed and properly endorsed. The Information Notice itself is a CCB rule form under ORS 701.325(3) covering payroll tax, workers' compensation, and liability and property damage insurance responsibilities. Confirm how Eugene applies this before you apply.

From the Library

Solar Permit in other Oregon localities

Everything above, sourced

How this solar permit page for Eugene was verified. 2 official sources: eugene-or.gov, eugene-or.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Eugene Building and Permit Services, Planning and Development Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project