Oregon / Eugene

Plumbing Permit in Eugene, Oregon

Permit required

Yes, a permit is required

Before adding, moving, removing or capping off any plumbing fixture, before replacing a water heater, before running water, sanitary or storm service piping, and for the plumbing serving projects that are themselves exempt from a building permit.

Confirmed on official page Verified City of Eugene Building and Permit Services, Planning and Development Department

By Mario Bailey, verified against official sources

Quick answer

Eugene issues plumbing permits directly through eBuild and states that a separate plumbing permit is required even for work exempt from a building permit. Alterations to an existing house are charged per fixture at $29.20, new construction is charged by bathroom count, and even a like-for-like water heater swap has its own $72.00 permit covering one inspection. Plan review is not part of a routine residential job: the application lists the triggers, which are medical gas and vacuum systems, chemical drainage, wastewater pretreatment, vacuum drainage, reclaimed wastewater, commercial booster pumps, water service lines of 2 inches or larger, multi-purpose fire sprinkler systems and grease processing equipment.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before adding, moving, removing or capping off any plumbing fixture, before replacing a water heater, before running water, sanitary or storm service piping, and for the plumbing serving projects that are themselves exempt from a building permit.

What a plumbing permit costs in Eugene

Line item
plumbing permitBy formulaFrom the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F): "Minimum Permit Fee ... $114.50". Alterations to an existing one- or two-family dwelling system are $29.20 per fixture, where fixtures include "water closet, lavatory, tub/shower, sink, bidet, laundry tub, dishwasher, clothes washer, water heater, floor sink/drain, drinking fountain, hose bibbs, sump pump/ejector, urinal, roof drain/overflow, catch basin" and more. New one- or two-family construction is a flat $585.75 for one bathroom, $782.50 for two and $878.00 for three, with $235.25 for each additional bathroom above three or kitchen above one, and that base covers the first 100 feet of water, storm and sewer service. Specific items: "Water Heater Permit, One- and Two-Family Residential Only ... $72.00", solar potable water units $109.00, swimming pool piping to equipment $116.00, reverse plumbing $77.30, septic tank removal $77.30, and sanitary or storm service at $176.00 for the first 100 feet.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Eugene

You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. City of Eugene Building and Permit Services, Planning and Development Department sets the exact checklist for Eugene.

Where to apply in Eugene:

City of Eugene Building and Permit Services, Planning and Development Department

Inspections and closing out your permit

Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Eugene permit portal or by phone at 541-682-5086.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a plumbing permit in Eugene?
Eugene issues plumbing permits directly through eBuild and states that a separate plumbing permit is required even for work exempt from a building permit. Alterations to an existing house are charged per fixture at $29.20, new construction is charged by bathroom count, and even a like-for-like water heater swap has its own $72.00 permit covering one inspection. Plan review is not part of a routine residential job: the application lists the triggers, which are medical gas and vacuum systems, chemical drainage, wastewater pretreatment, vacuum drainage, reclaimed wastewater, commercial booster pumps, water service lines of 2 inches or larger, multi-purpose fire sprinkler systems and grease processing equipment. Always confirm with the City of Eugene Building and Permit Services, Planning and Development Department before starting.
How much does a plumbing permit cost in Eugene?
From the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F): "Minimum Permit Fee ... $114.50". Alterations to an existing one- or two-family dwelling system are $29.20 per fixture, where fixtures include "water closet, lavatory, tub/shower, sink, bidet, laundry tub, dishwasher, clothes washer, water heater, floor sink/drain, drinking fountain, hose bibbs, sump pump/ejector, urinal, roof drain/overflow, catch basin" and more. New one- or two-family construction is a flat $585.75 for one bathroom, $782.50 for two and $878.00 for three, with $235.25 for each additional bathroom above three or kitchen above one, and that base covers the first 100 feet of water, storm and sewer service. Specific items: "Water Heater Permit, One- and Two-Family Residential Only ... $72.00", solar potable water units $109.00, swimming pool piping to equipment $116.00, reverse plumbing $77.30, septic tank removal $77.30, and sanitary or storm service at $176.00 for the first 100 feet. See the official fee schedule for current amounts.
How long does a plumbing permit take in Eugene?
Eugene states that intake staff review a trade permit application submitted through eBuild within 3 business days, after which fees can be paid online and "Once the fees have been paid, the permit will automatically be issued.". Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a plumbing permit in Eugene?
You can apply through the Eugene permit portal or contact the City of Eugene Building and Permit Services, Planning and Development Department directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Eugene?
Under Oregon law (ORS 701.010(7); ORS 701.325(1), (2), (3)): A homeowner may pull the permit and do the work. ORS 701.010(7) exempts from Construction Contractors Board licensing a person performing work on property that person owns, or on that person's own residence whether or not they own it, so no CCB license is needed to act as your own builder. That exemption does not cover someone working in the pursuit of an independent business with intent to offer the structure for sale. Oregon does require a signed disclosure at the counter: ORS 701.325(1) makes every city, county, or state permit office collect a written statement signed by the applicant, and an applicant claiming a licensing exemption must state the basis for it. ORS 701.325(2) requires the office to give the applicant the Information Notice to Property Owners About Construction Responsibilities and withhold the residential building permit until the applicant signs a statement, one option of which is that they are performing work on property they own or a residence they live in or will live in, and that any contractors they hire will be CCB licensed and properly endorsed. The Information Notice itself is a CCB rule form under ORS 701.325(3) covering payroll tax, workers' compensation, and liability and property damage insurance responsibilities. Confirm how Eugene applies this before you apply.

From the Library

What else needs a permit in Eugene

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the deck or porch floor above adjacent grade, measured at any point within 3 feet horizontally of the floor, with a covered porch also needing to stay at least 3 feet from property linesDecks have no flat fee.
Electrical PermitPermit requiredNot specifiedFrom the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to...
Fence PermitIt dependsfences of wood, wire mesh, chain link or other material weighing 5 pounds per square foot or less, with a 6 foot limit for materials heavier than 5 pounds per square footThe Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to...
HVAC PermitPermit requiredNot specifiedEugene's Residential Mechanical Permit Application (Form #F-304, updated July 2026)...
Patio PermitIt dependsroofed patio or porch cover supported by an exterior building wallNo flat patio fee.
Pool PermitIt dependsNot specifiedFrom the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to...
Roof Replacement PermitIt dependsNot specifiedA residential re-roof that does need a permit is charged as an alteration or repair...
Shed PermitIt dependsnonhabitable one-story detached accessory structure, with a height limit of 15 feet measured from grade plane to the average height of the highest roof surfaceNo shed line item.
Solar PermitPermit requiredNot specifiedFrom the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to...

Plumbing Permit in other Oregon localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Eugene documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Eugene Building and Permit Services, Planning and Development Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Plumbing Permit requirements across Oregon localities

Permit required
Get quotes