Do you need a solar permit in Missouri?
In Missouri, both counties and cities we checked agree: they require a solar permit for every job.
- Always required
- 2
- among 2 jurisdictions
- Conditional
- 0
- by size or scope
- Not required
- 0
- exempt outright
What a solar permit application usually includes, and which inspections usually follow, is explained once, in a general guide that is not specific to any state: how a solar permit works, from application to final inspection. Below is what differs from one jurisdiction to the next: who requires a permit, what they charge, and which office you file with.
Swipe sideways to see thresholds and confidence.
| Locality | Permit required? | Typical threshold | Confidence |
|---|---|---|---|
| Kansas City | Yes | Any size | Confirmed on official page |
| St. Louis | Yes | Any size | Confirmed on official page |
| No localities match your filter. | |||
What a solar permit costs in Missouri
Both Missouri jurisdictions we cover publish a fee figure for this work. Each is quoted from the office's own schedule and linked to its citation. That is too few to stand for Missouri as a whole, so read them as what those offices charge, not a statewide rate.
Each trade permit is priced from the one- and two-family valuation table in Sec. 18-20(b)(2), which covers building, mechanical, plumbing and electrical permits alike: $52.00 up to $1,000.00 of valuation, $58.00 from $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 for each additional $1,000.00 or fraction thereof to and including $100,000.00, and $483.00 for the first $100,000.00 plus $1.41 per additional $1,000.00 above that. Information Bulletin IB162 requires the declared valuation to include the entire scope of the project, including the solar panels themselves. The scheduled express review option adds $30.00 for one- and two-family dwellings under Sec. 18-20(c)(4). Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22.
last checked
Charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00, $23.00 for $1,001 to $2,000.00, $30.00 for $2,001 to $3,000.00, and "$10.00 per thousand estimated construction cost or fraction thereof" above $3,000.00, which is the tier a typical residential array lands in. A separate electrical permit is charged on the electrical schedule (Ordinance 70802), where the application fee is $25.00 and residential repair or modification work is $60.00 for the first unit.
last checked
Jurisdictions not listed publish no dollar figure we could quote. Absence does not mean a permit is free.
Common questions about solar permits in Missouri
- Do I need a solar permit in Missouri?
- In most of Missouri, yes. Of the 2 Missouri jurisdictions we have verified for solar work, both require a permit outright.
Ready to move on your solar permit?
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
Missouri's owner-builder rule (RSMo 701.055.1 and 701.055.2; RSMo 327.101.2(5)(a); RSMo 327.191.2(5)(a); RSMo 700.656.5) sets what you may do on your own home without hiring anyone. Read the statute.