Building permits in Baton Rouge, Louisiana
Of the 10 common home projects we have verified in Baton Rouge, 4 need a permit outright and 6 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 10in Baton Rouge
Look up a permit in Baton Rouge
Baton Rouge runs an online permit portal. We have not confirmed what its record search covers.
How to get a building permit in Baton Rouge
The City of Baton Rouge and Parish of East Baton Rouge run one Permits & Inspections Division, in the Department of Development, which reviews plans and inspects building, electrical, plumbing and mechanical work. MGO Connect, the parish’s online portal, handles applying, uploading plans, paying and adding trade permits to an existing project.
Where the office is and when it is open
The division is at 300 N Tenth Street, Baton Rouge, LA 70802; call 225-389-3205 (fax 225-389-3249) or email insprecords@brla.gov. The division’s directory listing gives its hours as Monday to Friday, 7:30 a.m. to 4 p.m.
Applying online in Baton Rouge
- Create an account at MGO Connect with a valid email and a working phone number. The system calls that number; answer and press 1 to activate the account. No call within 10 minutes: ring MGO support at 1-866-957-3764, option 2.
- Log in, choose the permit category on the left (Residential, Commercial, Occupancy, Add to Existing and others), then the permit type, such as Residential Accessory for a shed.
- Fill in the owner and contractor details and upload a PDF of the drawings, to scale and legible; incomplete submittals may delay review, the plan review sheet warns. Applications submitted after 1/1/2026 are reviewed under the 2024 I Codes and the 2023 NEC with Louisiana amendments. The plan review sheet asks for a site plan showing every property line, setback and existing or proposed structure; a fence site plan also states the material and the project cost, with any servitude noted.
- To add electrical, mechanical or plumbing work to a building permit already accepted, use Add Permit to Existing Project rather than a new application.
- Later uploads go in your project’s Docs tab. Fees appear in the Fees tab and are paid online from the Payments tab. If a fee looks wrong, call the division before you pay.
- Residential work over $7,500 must be done by a registered home improvement contractor or a licensed residential contractor. A homeowner building on their own home can pull the permit by filing a notarized Affidavit Claiming Exemption from Licensure.
What five common projects cost here
From the division’s Permit & Inspection Fees page, which prints no effective date or ordinance number. Its All Permits table adds a $25.00 Technology Fee, and is silent on whether a job with several permits (a pool has three) pays it once or per permit; and lists a $25.00 Flood Zone Determination, a separate application in the portal that new construction needs where applicable. Paying by credit card adds 5%.
- Shed: only over 200 square feet; the Residential Accessory line is $0.80 per square foot plus 125, as the page prints it, and the electrical, mechanical and plumbing permits are not included. Read 18 Nov 2026.
- Electrical: $125.00 per residential trade permit. Read 18 Nov 2026.
- Plumbing: $125.00, the same trade permit line; a water heater replacement needs one too. Read 18 Nov 2026.
- Fence: $250.00, the one Residential Fence line; the city lists fence repairs, not only new fences, among work needing a permit. Read 18 Nov 2026.
- Pool: $500.00 for the pool permit. The division’s pool sheet also requires a plumbing permit and an electrical permit, each a $125.00 trade permit, and a Pool Barrier Affidavit signed by the contractor and homeowner. Read 18 Nov 2026.
How long review takes
The division’s target is an initial residential plan review within seven (7) business days of a complete submittal, and resubmittals within three (3). Expedited review cuts that to three (3) and two (2) business days for $60 plus $0.10 per square foot under roof. Review is only one step, and issuing the permit can take longer.
Measured from the parish’s own permit records on our Baton Rouge processing-times tracker, November 2025 to October 2026: residential electrical permits had a median of the same day (68.1% issued same day, 626 permits), plumbing permits also the same day (59.1%, 66 permits), and new homes 16 days.
Inspections, in order
Inspections can be booked for the next business day. After-hours inspections depend on inspector availability and cost $150 extra; a reinspection is $75.00. Every inspection on the permit has to pass before a Certificate of Occupancy is issued. The pool sheet gives the clearest sequence:
- Plumbing rough-in: all piping tested to 30psi before concrete is poured.
- Electrical: pool bonding, then pool deck bonding, both before concrete.
- Finals: the plumbing final checks the pool filler air gap, the backwash connection to sewer and vacuum breakers on hose bibs; the electrical final checks the equipment connection.
A pool at a single-family home needs no Health Department approval.
What needs no permit in Baton Rouge
- A detached accessory structure under 200 square feet.
- A deck less than 200 square feet and less than 30 inches off the ground, in a buildable area of the lot.
- Prefabricated above-ground pools less than 24 inches deep and under 5,000 gallons.
- Retaining walls “less than 4-feet.”
- Replacing a light fixture, a same-size breaker or fuse in the same place, or a plumbing fixture.
If the work already started
The fee page has no after-the-fact or penalty line, and the division’s FAQ and Residential page are silent on work already under way; call 225-389-3205 before you apply for it. What Louisiana law says about building without a permit.
Checklist before you apply
- A site plan with property lines, setbacks and structures, and drawings as a PDF.
- An MGO Connect account, activated by the phone call.
- For a fence: material, height and cost on the site plan.
- For a pool: the signed Pool Barrier Affidavit, plus separate plumbing and electrical permits.
- A licensed or registered contractor for work over $7,500, or the notarized homeowner affidavit.
- The $25.00 Technology Fee on top of the permit fee, and 5% more if you pay by card.
- Trade permits added with Add Permit to Existing Project.
Baton Rouge documents read for this guide
- Office page: Permits & Inspections, read
- Office page: Residential, read
- Office page: Permits and Inspections FAQs, read
- Permit portal: How to Apply for a Permit Online, read
- Application: Residential Plan Review Requirements Information Sheet, read
- Office page: Understanding Permit Requirements, read
- Inspections: Swimming Pool Permit Information, read
- Fee schedule: Permit & Inspection Fees, read
What needs a permit in Baton Rouge
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck floor area; the exemption also requires the deck to be less than 30 inches off the ground and located in a buildable area of the lot | See schedule |
| Electrical Permit | It depends | Before adding, replacing or extending any electrical circuit, and before replacing a... | Permit & Inspection Fees page: "Residential Mechanical, Electrical or Plumbing, Gas Trade Permits $125.00", plus "Technology Fee $25.00" charged on all permits |
| Fence Permit | Permit required | Any size | Permit & Inspection Fees page: "Residential Fence $250.00", plus "Technology Fee $25.00" charged on all permits |
| HVAC Permit | It depends | Before replacing a condenser, air handler, furnace or ductwork, or installing any new... | Permit & Inspection Fees page: "Residential Mechanical, Electrical or Plumbing, Gas Trade Permits $125.00", plus "Technology Fee $25.00" charged on all permits |
| Patio Permit | Permit required | Any size | A patio cover falls under "Residential Accessory $0.80/ square foot +125 ( EMP's not included)"; the schedule has the rest |
| Plumbing Permit | It depends | Before replacing any water line, vent, drain or sewer line, any plumbing valve or shut... | Permit & Inspection Fees page: "Residential Mechanical, Electrical or Plumbing, Gas Trade Permits $125.00", plus "Technology Fee $25.00" charged on all permits |
| Pool Permit | It depends | prefabricated above ground pools that also hold less than 5,000 gallons | Permit & Inspection Fees page: "Residential Swimming Pool Permit $500.00", plus "Technology Fee $25.00" charged on all permits |
| Roof Replacement Permit | Permit required | Any size | A reroof falls under "Residential Remodel $0.80/ square foot +$125 ($250 minimum, EMP's not included)", plus the "Technology Fee $25.00" charged on all permits |
| Shed Permit | It depends | floor area of a detached accessory structure | Permit & Inspection Fees page: "Residential Accessory $0.80/ square foot +125 ( EMP's not included)", plus "Technology Fee $25.00" charged on all permits |
| Solar Permit | Permit required | Any size | Permit & Inspection Fees page: "Residential Solar $375.00", plus "Technology Fee $25.00" charged on all permits |
Planning a project in Baton Rouge?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Baton Rouge permit fees compared with nearby Louisiana localities
| Louisiana locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Baton Rouge | See schedule | See schedule | See schedule |
| New Orleans | Building permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005 + $60) | See schedule | $40 application fee plus $3 per new circuit plus $0.30 per service amperage |
Each cell is taken from that Louisiana jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Baton Rouge permit questions, answered from the data
- Do you need a permit in Baton Rouge?
- It depends on the project. Of the 10 permit types we cover in Baton Rouge, 4 always require a permit (for example a fence permit) and 6 depend on size or scope (a deck permit, for instance). Each Baton Rouge permit type's page states the exact rule and its source.
- How much does a permit cost in Baton Rouge?
- Baton Rouge publishes a fee for 10 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of Baton Rouge / Parish of East Baton Rouge, Department of Development, Permits and Inspections Division; we do not estimate or mark them up.
- Where do you apply for a permit in Baton Rouge?
- City of Baton Rouge / Parish of East Baton Rouge, Department of Development, Permits and Inspections Division issues permits in Baton Rouge and has an online permit portal, and takes questions at 225-389-3205. The Baton Rouge official page and portal are linked in the office section above.
How the Baton Rouge pages were verified. 10 permit types, 4 distinct official sources, most recently checked . Every rule is read from City of Baton Rouge / Parish of East Baton Rouge, Department of Development, Permits and Inspections Division or the applicable code and cited on its page; anything we could not confirm for Baton Rouge is marked rather than estimated. How we verify.
Permitting activity in Baton Rouge
In 2025, Baton Rouge authorized permits for 1,700 new residential housing units (489 single-family, 1,211 in multi-family buildings), valued at $195M , up from 1,375 the year before. That works out to about 7.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 219,052.
How long permits take in Baton Rouge
Of the 1,208 permits Baton Rouge issued in the 12 months to October 2026 that we could time, the median wait from application to permit was the same day for electrical permits and 16 days for new homes. Measured times for every permit type in Baton Rouge, the trend and what speeds a permit up.