Alaska / Anchorage

Patio Permit in Anchorage, Alaska

Not confirmed

We could not confirm this

Not confirmed Verified

Issued byMunicipality of Anchorage Development Services Department, Building Safety Division

By Mario Bailey, verified against official sources

Quick answer

Anchorage does not publish a rule for an uncovered patio. Title 23 never uses the word "patio"; its closest exemption covers "Platforms, walks, stairs, ramps and driveways not more than 30 inches above grade" that are not over a basement or story below, which does not name a patio slab. A covered patio is different: the Municipality's "Do I need a permit" handout lists adding, enlarging or enclosing a patio cover as building-permit work, but that page is a scanned image the dataset cannot quote. Call the permit counter at 907-343-8211 before pouring a slab.

Applying yourself? Start with the office.

What a patio permit costs in Anchorage

Line item
patio permitNot publishedAnchorage publishes no fee for this permit type in a schedule we can verify. Ask Municipality of Anchorage Development Services Department, Building Safety Division how the fee is calculated for your project.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Anchorage

In Anchorage, applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

What most patio permit applications include:

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • For Anchorage, a scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. Municipality of Anchorage Development Services Department, Building Safety Division sets the exact checklist for Anchorage.

Where to apply in Anchorage:

Municipality of Anchorage Development Services Department, Building Safety Division

Inspections and closing out your permit

In Anchorage, a permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. In Anchorage: a footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. In Anchorage: a frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. In Anchorage: a final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. In Anchorage: an at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. In Anchorage: each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Anchorage permit portal or by phone at (907) 343-8211.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a patio permit in Anchorage?
Anchorage does not publish a rule for an uncovered patio. Title 23 never uses the word "patio"; its closest exemption covers "Platforms, walks, stairs, ramps and driveways not more than 30 inches above grade" that are not over a basement or story below, which does not name a patio slab. A covered patio is different: the Municipality's "Do I need a permit" handout lists adding, enlarging or enclosing a patio cover as building-permit work, but that page is a scanned image the dataset cannot quote. Call the permit counter at 907-343-8211 before pouring a slab. Always confirm with the Municipality of Anchorage Development Services Department, Building Safety Division before starting.
How much does a patio permit cost in Anchorage?
Fees are set by Anchorage and are not published here. See the official fee schedule for current amounts.
Where do you apply for a patio permit in Anchorage?
You can apply through the Anchorage permit portal or contact the Municipality of Anchorage Development Services Department, Building Safety Division directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in Anchorage?
Under Alaska law (AS 08.18.161(9), (11); AS 08.18.116(b); AS 08.40.190(b)(3); AS 08.40.390(b)(3)): Yes. The contractor registration law does not apply to a person working on an existing structure on their own property, or on their own existing residence, or to an owner who acts as their own general contractor, doing the work or hiring workers and subcontractors and paying for labor and materials (AS 08.18.161(9), (11)). An owner-builder is limited to one home, duplex, triplex, four-plex or commercial building every two years, and an owner who advertises or sells the structure during construction or within two years after construction begins must file a state form declaring they are not in the contracting business, which can trigger a state investigation (AS 08.18.161(11), 08.18.116(b)). Owners may also do their own electrical work on residential property they or their immediate family own that is not intended for sale, and their own mechanical and plumbing installation on a single-family or two-family home not intended for sale, without a state administrator license (AS 08.40.190(b)(3), 08.40.390(b)(3)). Local permit rules still apply where a city or borough has a building code. Confirm how Anchorage applies this before you apply.

From the Library

What else needs a permit in Anchorage

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work and fixture swaps that do not rearrange piping are exempt; moved or new piping, new wiring, or wall and structural changes need permits...mechanical, or electrical work but no structural or alteration work)": $175, 2...
Deck PermitIt dependsHeight of the deck's walking surface above finished grade, attached or detachedAMC 23.10.109 Table 3-A item 2, Residential Construction: "Up to $50,000 (Repairs...
Electrical PermitIt dependsLike-for-like repair or replacement of fixed appliances, switch parts, overcurrent devices and receptacles is exempt; new or extended wiring, panels and services need a permit...mechanical, or electrical work but no structural or alteration work)": $175, 2...
EV Charger PermitPermit requiredAny size...mechanical, or electrical work but no structural or alteration work)": $175, 2...
Fence PermitIt dependsFences of light-frame construction...residential construction under AMC 23.10.109 Table 3-A item 2 ("All others" $0.009...
HVAC PermitPermit requiredAny size...mechanical, or electrical work but no structural or alteration work)": $175, 2...
Plumbing PermitIt dependsLeak and stoppage repairs and same-location fixture swaps with no new or rearranged piping are exempt; new, replaced or rearranged piping needs a permit...mechanical, or electrical work but no structural or alteration work)": $175, 2...
Pool PermitIt dependsPrefabricated pools accessory to a Group R-3 dwelling, not exceeding 5,000 gallons and installed entirely above ground...(new construction, additions, alterations, and repairs)": "Up to $50,000 (Repairs...
Roof Replacement PermitIt dependsTotal fair market value of materials and labor to repair or replace exterior nonstructural roof coverings...Permitting Fees (One, Two and Three Family Structures)": "Up to 3,000 sq. ft."...
Shed PermitIt dependsFloor area of a one-story detached accessory building used as a tool or storage shed, playhouse or similar use...(new construction, additions, alterations, and repairs)": "Up to $50,000 (Repairs...
Solar PermitPermit requiredAny sizePermit fees for residential installations are generally under $400." Fees fall under AMC...
Water Heater PermitPermit requiredAny size...water heater in a residential building containing 4 or fewer dwelling units." $175...

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Anchorage documents; the office above sets the local rules.

How this patio permit page for Anchorage was verified. 1 official source: muni.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Municipality of Anchorage Development Services Department, Building Safety Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Patio Permit requirements across Alaska localities

Patio permit rules nationwide

Not confirmed
Get quotes