Permit records

Oklahoma City permit search

Oklahoma City permit records are public. The county publishes them through Accela Citizen Access, and searching does not require an account.

By Mario Bailey Last checked · 10 official sources

Project types verified
10
in Oklahoma City
Search verified
23 Aug 2026
we opened it ourselves

How to search

  1. Open the Oklahoma City permit record search.
  2. Enter an address, or switch the search type to look up permits by permit number or contractor license.
  3. Open a result to see the permit's status, inspection history, and issue date.

If the permit does not turn up

Older permits are often missing from online records, and a permit filed under a contractor's name will not surface in an address search that expects the owner. City of Oklahoma City Development Services Department can check the paper file.

What needs a permit in Oklahoma City

Every project type we have verified in Oklahoma City, with the rule, the threshold, and the fee that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny size...Section 60-12-7 Alterations, removal, repair: "(a) minimum permit fee .....$75.00"...
Electrical PermitIt dependsBefore any interior or exterior electrical wiring, electrical construction...no change in the service": $95.20 effective July 1, 2025 through June 30, 2026, then...
Fence PermitPermit requiredAny size...General Schedule of Fees, Section 60-19-6 Fence permits: "permit, each .....$...
HVAC PermitIt dependsBefore installing, altering, replacing or rearranging any mechanical, gas or boiler......and inspection fees: "(a) forced air heating units (gas or electric) .....$...
Patio PermitPermit requiredAny size...Section 60-12-7 Alterations, removal, repair: "(a) minimum permit fee .....$75.00"...
Plumbing PermitIt dependsBefore altering, replacing or rearranging plumbing or gas systems, or installing any new......when alteration or addition is sufficient to require a building permit" $78.40...
Pool PermitPermit requiredAny size...60-12-10(b): "swimming pool/hot tub/fountain/spray grounds permit, each...
Roof Replacement PermitIt dependsarea of roofing material removed, repaired or replaced..."Roof replacement or repair of greater than 500 square feet .....$90.00." (Ord. No...
Shed PermitIt dependsfloor area of a one-story detached accessory structure that is also 10 feet or less in overall height and not on a permanent foundation...of Fees, Section 60-12-9 New construction: "(a) minimum permit fee .....$75.00" and...
Solar PermitPermit requiredAny size...60, General Schedule of Fees, Section 60-12-10(i) "Photovoltaic system": $86.40...

Everything we have verified about permits in Oklahoma City